Johana Felicia, Johana
Universitas Kristen Krida Wacana

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

INTEGRASI PENJADUALAN PRODUKSI DAN PERAWATAN UNTUK MINIMISASI DOWNTIME MESIN (STUDI KASUS PADA SALAH SATU PERUSAHAAN GARMEN) Felicia, Johana; Ginting, Meriastuti
Operations Excellence: Journal of Applied Industrial Engineering Vol 6, No 1, (2014): OE Maret 2014
Publisher : Universitas Mercu Buana

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract. One of the common problem manufacturing company used to have isproduction lateness. It is caused by the manufacturing company havenā€˜t had aneffective scheduling system. This study aim to integrate production andmaintenance scheduling that focused on critical machine. Critical machine ischosen based on lowest OEE value. Integer programming uses to determineoptimal value of downtime, production quantity, dan maintenance quantity. Theresult of this study shows that downtime can be decreased by 82.20 minutes. Itcauses increased OEE value up to 25.56%. Integrated production and maintenancescheduling also ensures that all production activity and maintenance activity canbe carried out in work time range and still, can fulfill demand.Keyword:Scheduling, Production, Maintenance, Overall EquipmentEffectiveness(OEE), Integer Programming