This Author published in this journals
All Journal Jurnal Geominerba
Revi Timora Salajar
PPSDM Geominerba, KESDM

Published : 5 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 5 Documents
Search

EVALUASI PASCA-DIKLAT JURU UKUR TAMBANG TERHADAP PERUBAHAN PERILAKU ALUMNI PT TIMAH TBK. Revi Timora Salajar
JURNAL GEOMINERBA (JURNAL GEOLOGI, MINERAL DAN BATUBARA) Vol 6 No 1 (2021): Jurnal Geominerba - 2021
Publisher : PPSDM Geominerba

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (6889.899 KB)

Abstract

The need for large number of mine surveyors at PT Timah Tbk. is very much needed until now. This is an embodiment of fulfilling the mandate in the Minister of Energy and Mineral Resources Regulation No. 26 of 2018 concerning the Implementation of Good Mining Engineering Rules, Article 7, “every mining business licence must have the competent mining technical personnel in accordance with the provisions of laws and regulations”. As a result of these regulations, PT Timah Tbk. seeks to include its employees in the Training and Certification of the mine surveyor at PPSDM Geominerba. This post-training evaluation method is carried out by using a questionnaire to the alumni of mine surveyor training and certification of PT Timah Tbk. The result of the post-training evaluation specifically found that the Training and Certification of the mine surveyor was considered to be useful and support the work so that the theory obtained can be applied better.
EVALUASI PASCADIKLAT PENGAWAS OPERASIONAL PERTAMBANGAN MINERAL DAN BATUBARA TINGKAT PERTAMA TERHADAP PERUBAHAN PERILAKU ALUMNI PT TIMAH TBK. Revi Timora Salajar; Imelda Hutabarat
JURNAL GEOMINERBA (JURNAL GEOLOGI, MINERAL DAN BATUBARA) Vol 4 No 2 (2019): Jurnal Geominerba 2019
Publisher : PPSDM Geominerba

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (4595.241 KB) | DOI: 10.58522/ppsdm22.v4i2.75

Abstract

The need for a large number of competent mining operations supervisors at PT Timah Tbk. is very much needed until now. This is an embodiment of fulfilling the mandate in the Minister of Energy and Mineral Resources Regulation No. 26 of 2018 concerning the Implementation of Good Mining Engineering Rules, Article 7, “every mining business licence must have the competent mining technical personnel in accordance with the provisions of laws and regulations”. As a result of these regulations, PT Timah Tbk seeks to include its employees in the Training and Certification of the First Operational Supervisor at PPSDM Geominerba. This post-training evaluation was carried out at PT Timah, Tbk. Located in Sungailiat City, Bangka Belitung Province. The results of the post-training evaluation specifically found that the practice time was considered to be insufficient. They hope that there will be field observations to implement training courses for conducting inspections. In addition, the duration of mining safety analysis needs to be added.
EVALUASI PASCADIKLAT INDUSTRI PENGOLAHAN DAN PEMURNIAN MINERAL PPSDM GEOMINERBA TERHADAP PENINGKATAN KOMPETENSI ALUMNI PADA INDUSTRI SMELTER (LOKUS: SULAWESI TENGGARA) Imelda Hutabarat; Revi Timora Salajar
JURNAL GEOMINERBA (JURNAL GEOLOGI, MINERAL DAN BATUBARA) Vol 4 No 1 (2019): Jurnal Geominerba 2019
Publisher : PPSDM Geominerba

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (6332.706 KB) | DOI: 10.58522/ppsdm22.v4i1.83

Abstract

The development of the processing and refining industry cannot be separated from the mandate of Law No. 4 of 2009 concerning Mineral and Coal Mining which requires domestically is obliged to process and refine minerals and coal in the country. There are still few schools that specialize in mining and metallurgy. Including high school (SMA) and vocational high school (SMK) still do not have a metallurgical curriculum. Thus there are competency gaps possessed by high school /vocational school students to enter metallurgical industries. Therefore, to reduce the competency gap possessed by high school / vocational school graduates in the locations around the smelter industry that are built, vocational training is needed to be able to provide the knowledge, skills and attitudes needed by high school/ vocational graduates to be accepted in the smelter industry. Post-Training Evaluation was carried out in Southeast Sulawesi province, where the rapid development of the smelter industry in this province. The results of the post-training evaluation specifically found that the practice time in the training was considered to be added. Even though it is quite a large amount of practice time allocated to education and training (50%), the skills provided are not too specific as those done in companies in South Sulawesi.
PELINDIAN SIANIDASI TERHADAP BIJIH EMAS HASIL OKSIDASI DENGAN MENGGUNAKAN HIDROGEN PEROKSIDA Revi Timora Salajar; Imelda Hutabarat
JURNAL GEOMINERBA (JURNAL GEOLOGI, MINERAL DAN BATUBARA) Vol 3 No 2 (2018): Jurnal Geominerba - 2018
Publisher : PPSDM Geominerba

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58522/ppsdm22.v3i2.87

Abstract

The low yield of gold in the direct cyanidation process of the sulfide refractory gold ore has led to various attempts to modify the cyanidation process directly to increase the gold yield. One of them is by conducting a pre-processed of sulfide refractory gold ore with the use of oxidative materials before the cyanidation process. The effect of hydrogen peroxide (H2O2) as an oxidative material on pre-processed sulfide refractory gold ore has been investigated. The important variables in the test are the concentration of hydrogen peroxide, cyanide, pH of the leaching solution, and particle size. The concentration of hydrogen peroxide and cyanide has a significant effect on the level of gold yield. An optimum gold yield was achieved at 0.75 M of the hydrogen peroxide concentration with a cyanide concentration of 0.14%. This gold yield has increased the recovery process from 70.37% (without the pretreatment) to 85.19% (with a pretreatment process). The results of this study provide the possibility that the direct cyanidation of sulfide refractory gold ores with the use of pre-treated oxidative materials allows it to remain competitive in its commercial applications.
OPTIMALISASI PERALATAN PENGOLAHAN MINERAL DI KAMPUS LAPANGAN CIPATAT PADALARANG Imelda Hutabarat; Revi Timora Salajar
JURNAL GEOMINERBA (JURNAL GEOLOGI, MINERAL DAN BATUBARA) Vol 3 No 1 (2018): Jurnal Geominerba - 2018
Publisher : PPSDM Geominerba

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58522/ppsdm22.v3i1.93

Abstract

A good quality of training requires a well-prepared equipment, infrastructure, and facilities, including the Indonesian National Working Competency Standards (RSKKNI), Curriculum Standards, and Modules and Competency Testing Material (MUK). The purpose of this paper is to design the flowing process by preparing the equipment, infrastucture, and facilities of the Mineral Processing field in PPSDM Geominerba Campus Cipatat Padalarang to be utilized optimally for the tainings held by PPSDM Geominerba. The design preparation begins with a literature study of the raw material types for the mineral processing process by considering its availability, mineral types, the processing plan, and the necessary equipment. Furthermore, the arrangement of the flowing process for non-metallic minerals (limestone) and metallic minerals (gold) is done which then can set the position of the equipment in the Mineral Processing field of Campus Cipatat Padalarang, West Java. Through this paper, the optimization of mineral processing equipment in Campus Cipatat Padalarang can be realized, especially for Non-Metal Minerals Processing Training (limestone) and Metal Minerals Processing Training (gold). Limestone can be processed to obtaine a fine concentrates which is ready for the combustion process to produce a fine limestone which meets the subsequent industries. Meanwhile, the metal minerals (gold) can be processed through the comminution process with jaw crusher and ball mill. The process can be done with the shaking table to produce a gold concentration which is ready for the gold smelting.