This Author published in this journals
All Journal Jurnal Rekayasa
Dar Ely Fauziah, Dar Ely
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

KAJIAN POTENSI SUMBER DAYA AIR UNTUK PEMBANGKIT LISTRIK TENAGA MIKROHIDRO DI PEKON SUMBER AGUNG KECAMATAN SUOH KABUPATEN LAMPUNG BARAT Fauziah, Dar Ely
Rekayasa : Jurnal Ilmiah Fakultas Teknik Universitas Lampung Vol 18, No 2 (2014): Edisi Agustus 2014
Publisher : UNIVERSITAS LAMPUNG

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

To meet the demand for electricity in rural areas far from the power grid, the local energy poten- tial can be harnessed to generate electricity. Local energy source potential of which is hy - dropower which can be used for micro- hydro power plants (MHP). Technology of micro hydro power plant is the most mature technology to be developed in rural areas beyond the reach of the electricity grid. Source of electrical energy with micro hydro including clean and environmentally friendly. Diversity micro hydro technology enables integrated with the existing network and can be distributed to remote areas and can be used commercially on a small scale in order to encour- age development activities that can improve the lives of rural communities. From the analysis of regionalization method can be used to estimate the discharge Way Semaka and Batang Ireng, because of data limitations hydrology and hydraulics in both basins. This is ev- idenced by the amount of discharge is calculated by the method of regionalization is not much dif - ferent from the magnitude of the discharge measured in the field. Rational discharge calculation method can not be used because the resulting value is too large discharge, and far different from the discharge measured in the field. Similarly, the calculation of the discharge hydrograph method Measured Unit (HST), where phi index gained greater than the intensity of the rain, so this method can not be used. Discharge calculation method that can be used is the method of FDC (Flow Duration Curve), because the discharge calculation results using this method the measured value is approaching discharge in the field. Q80 % with FDC method (Flow Duration Curve) to Way Semaka River at 15.34 (m3/sec), while the measured discharge 21.75(m3/sec). For Batang River Ireng magnitude Q80 % with FDC method (Flow Duration Curve) of 0.069 (m3/sec), and the discharge measured at 0.063 (m3/sec). From the calculation of the electric power in Batang Ireng, obtained power with an efficiency of 60 % amounting to 3.246 kW, while the electric power with an efficiency of 80 % amounting to 4.328 kW. Therefore Batang Ireng River potential to be micro hydro power plants (MHP).