Korelasi Hambatan Konus Dengan California Bearing Ratio Lapangan Pada Tanah Lempung Ros Anita Sidabutar; Yetty Saragi; Jesika Situmorang
SPROCKET JOURNAL OF MECHANICAL ENGINEERING Vol 4 No 2 (2023): Edisi Februari 2023
Publisher : Program Studi Teknik Mesin, Universitas HKBP Nommensen, Medan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36655/sprocket.v4i2.917

Abstract

The bearing capacity of subgrade for pavement thickness planning needs is generally determined by carrying out CBR testing. The BCR test in this study will be carried out by field CBR tests (field CBR) using the results of the DCPT examination. Inspection with the DCPT tool produces soil bearing strength data to a depth of 90 cm below the subgrade. The results of this examination are expressed by the Penetrometer Scale Penetrability (SPP) and the Penetration Resistance Scale (SPR). Road construction, which is certain to continue, requires data on identification of soil types and CBR where such data is not always available. In fact, the correlation between CBR and conical tip resistance (qc) already exists. Rahardjo (1996) suggests that for clay, the correlation between qc and CBR is CBR = 0.5 qc. However, the correlation results come from an unknown area, which of course the soil structure and properties are likely to be different and therefore it is also common to find that the time available to design a road pavement layer foundation is very urgent. Meanwhile, to obtain more accurate design results, Qc and CBR data are needed. To provide this connection using Cone Penetration Test (CPT) data at 4 stations and using correlation from the initial soil state data, soil stratigraphy is needed from the segment that will receive the construction. In this study, the CBR value correlation from Rahardjo (1996) and the Novo SPT application was used to obtain the CBR value and then describe the stratigraphy of the soil in that segment. From the results of the CPT to the correlation and Novo SPT, the CBR value to a depth of 2.0 m has not reached 6%, meaning that in this segment, if road construction is to be carried out, it requires soil improvement to obtain a CBR of at least 6%.