Claim Missing Document
Check
Articles

Found 2 Documents
Search

Optimalisasi Keuntungan Menggunakan Metode Branch And Bound Pada Produksi Spring Bed Daryana Dali; Yopi Andry Lesnussa; Venn Yan Ishak Ilwaru
Jurnal Matematika Vol 12 No 2 (2022)
Publisher : Publisher : Mathematics Department, Faculty of Mathematics and Natural Sciences, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/JMAT.2022.v12.i02.p151

Abstract

PT Satelit Maluku is a company that produces spring beds with three types, namely 2in1, ordinary spring beds and single beds. Every company established aims to get big profits as well as PT Satelit Maluku. To obtain large profits, companies need to make strategies so that each available material can be allocated optimally and appropriately. The purpose of this research is PT Satelit Maluku can optimize the profit of spring bed production by using the Branch and Bound and QM for Windows V5 methods. From the results of calculations using the Branch and Bound method and QM for windows V5, the optimal profit is Rp. 19,775,000 with a lot of production of spring bed type 2in1 is 0 (not producing), ordinary spring bed is 26 pieces and single bed is 3 pieces.
OPTIMASI BIAYA DISTRIBUSI BERAS MISKIN (RASKIN) MENGGUNAKAN MASALAH TRANSPORTASI TAK SEIMBANG Venn Yan Ishak Ilwaru; Yopi Andry Lesnussa; Jesica Tentua
BAREKENG: Jurnal Ilmu Matematika dan Terapan Vol 14 No 4 (2020): BAREKENG: Jurnal Ilmu Matematika dan Terapan
Publisher : PATTIMURA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (735.262 KB) | DOI: 10.30598/barekengvol14iss4pp609-618

Abstract

Rice is the staple food for the majority of Indonesian population. As the population increases, the need for rice also increases. Rice distribution is very important in terms of budget and time efficiency. The purpose of this research was to minimize the distribution costs of poor rice (RASKIN) by using the ASM (Abdul, Shaleh, Maliki) modification method, so that the distribution costs obtained were optimal. This research was conducted at Perum BULOG Ambon Sub Divre Maluku. Based on the research results, it shows that by using the ASM modification method the distribution costs incurred by Perum BULOG Ambon Sub Divre Maluku is Rp. 1,091,121,022.