Jangkung Raharjo
Fakultas Teknik Elektro, Universitas Telkom, Bandung

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

INTEGRASI PEMBANGKIT LISTRIK TENAGA SURYA ON GRID UNTUK MEMBANTU SISTEM KELISTRIKAN DI MASJID JAMI’ P3SB Jangkung Raharjo; Bandiyah Sri Aprillia; Novi Prihatiningrum; Irwan Purnama; Yusuf Nur Wijayanto; Ilma Mufidah; Augustina Asih Rumanti
JMM (Jurnal Masyarakat Mandiri) Vol 7, No 5 (2023): Oktober
Publisher : Universitas Muhammadiyah Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31764/jmm.v7i5.16867

Abstract

Abstrak: Berdasarkan hasil wawancara dengan pengurus Pondok Pesantren Pembangunan Sumur Bandung (P3SB) salah satu masalah yang dihadapi yaitu tagihan listrik bulanan yang cukup besar untuk memenuhi fasilitas kelistrikan di wilayah pondok pesantren. Selain itu berdasarkan hasil analisis dari tim Universitas Telkom, secara lokasi P3SB cocok untuk integrasi Pembangkit Listrik Tenaga Surya (PLTS). Selain untuk mengurangi tagihan listrik bulanan adanya sistem PLTS yang dibangung juga diharapkan menjadi media belajar santri pada bidang sistem energi terbarukan. Pelaksanaan kegiatan ini dilakukan dalam 3 tahap yaitu survey lokasi, pemasangan pembangkit tenga surya atap dan evalusi kegiatan. Selama pelatihan dan pemaparan Keamanan, Kesehatan dan Keselamatan Kerja (K3) para siswa dan guru berjumlah 15 orang dapat menjawab pertanyaan dengan rerata akurasi jawaban 90%. Adanya pelatihan K3 ini diharapkan mitra dapat melakukan perawatan pembangkit surya secara mandiri. Berdasrkan hasil umpan balik, 72% dari masyarakat sasar sangat setuju dan 28% Setuju menerima kegiatan pengabdian masyarakat yang dilakukan dan berharap kegiatan serupa dapat dilanjutkan di masa yang akan datang.Abstract: Based on the results of interviews with the management of the Islamic Boarding School (P3SB), one of the problems faced is the monthly electricity bill which is large enough to fulfill electricity facilities in the Islamic boarding school area. In addition, based on the analysis results from the Telkom University team, the location of P3SB is suitable for the integration of Solar Power Plants (PLTS). In addition to reducing monthly electricity bills, the PLTS system being built is also expected to become a learning medium for students in the field of renewable energy systems. The implementation of this activity was carried out in 3 stages, namely site survey, installation of a rooftop solar generator and activity evaluation. During training and presentation on Occupational Safety, Health, and Safety (K3) students and teachers consist of 15 peoples can answer questions with an average answer accuracy of 90%. K3 training is expected that partners to carry out solar generator maintenance independently. Based on the results of the feedback, 72% of the target community strongly agreed and 28% agreed to accept the community service activities being carried out and hoped that similar activities could be continued in the future.