Kesadaran Santri dalam Pengelolaan Sampah dengan Metode Reuse, Reduce dan Recycle Windi; Ahmad Aguswin; Akhmad Akromusyuhada
Jurnal Informatika Ekonomi Bisnis Vol. 5, No. 3 (2023)
Publisher : SAFE-Network

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37034/infeb.v5i3.661

Abstract

The higher and the increasing amount of waste in Indonesia, the proper waste management is needed. The new paradigm of waste management as mandated by RI Law no. 18 of 2008 concerning waste management, a real effort is needed to make it happen. Al-Muhajirin Islamic Boarding School is one of the Islamic boarding schools in Bekasi Regency, West Java. The students at the Islamic boarding school still do not have knowledge about waste management based on reuse, reduce and recycle. Therefore we conducted research on waste management in Islamic boarding schools with students as the subject. The purpose of this research is to increase the awareness of all students in waste management using the reuse, reduce and recycle methods. The method used in this study uses the literature study method.
Kesadaran Santri dalam Pengelolaan Sampah dengan Metode Reuse, Reduce dan Recycle Windi; Ahmad Aguswin; Akhmad Akromusyuhada
Jurnal Informatika Ekonomi Bisnis Vol. 5, No. 3 (September 2023)
Publisher : SAFE-Network

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37034/infeb.v5i3.661

Abstract

The higher and the increasing amount of waste in Indonesia, the proper waste management is needed. The new paradigm of waste management as mandated by RI Law no. 18 of 2008 concerning waste management, a real effort is needed to make it happen. Al-Muhajirin Islamic Boarding School is one of the Islamic boarding schools in Bekasi Regency, West Java. The students at the Islamic boarding school still do not have knowledge about waste management based on reuse, reduce and recycle. Therefore we conducted research on waste management in Islamic boarding schools with students as the subject. The purpose of this research is to increase the awareness of all students in waste management using the reuse, reduce and recycle methods. The method used in this study uses the literature study method.
Manajemen Waktu Pada Pekerjaan Arsitektur Proyek Pembangunan Gedung Yayasan Pelita Ilmu Insani Windi; Ahmad Aguswin; Akhmad Akromusyuhada
Jurnal Informatika Ekonomi Bisnis Vol. 6, No. 1 (2024)
Publisher : SAFE-Network

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37034/infeb.v6i1.801

Abstract

The success or failure of a project can be influenced by the lack of planning of project activities, and the supervision carried out is ineffective and has an impact on the project running inefficiently. Then, it will result in delays and a decrease in the quality of work and have an impact on swelling the project budget. Project management is needed in order to manage projects starting from implementation to the end of a project. This research uses a case study on the Pelita Ilmu Foundation Building Construction Project, especially architectural work. This building is located on Jl. Rawa Kuda, Kp. Rawa Kuda RT/RW 004/002 Karangharum, Kedungwaringin District, Bekasi Regency, West Java 17540 [1]. The S curve is used to find out how long a project takes to complete. The aim of this research is to determine time efficiency in terms of the S Curve graph. The results of time management analysis using the S Curve on the graph showed that the realization of time delays was not in accordance with the plan.
Manajemen Waktu Pada Pekerjaan Arsitektur Proyek Pembangunan Gedung Yayasan Pelita Ilmu Insani Windi; Ahmad Aguswin; Akhmad Akromusyuhada
Jurnal Informatika Ekonomi Bisnis Vol. 6, No. 1 (March 2024)
Publisher : SAFE-Network

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37034/infeb.v6i1.801

Abstract

The success or failure of a project can be influenced by the lack of planning of project activities, and the supervision carried out is ineffective and has an impact on the project running inefficiently. Then, it will result in delays and a decrease in the quality of work and have an impact on swelling the project budget. Project management is needed in order to manage projects starting from implementation to the end of a project. This research uses a case study on the Pelita Ilmu Foundation Building Construction Project, especially architectural work. This building is located on Jl. Rawa Kuda, Kp. Rawa Kuda RT/RW 004/002 Karangharum, Kedungwaringin District, Bekasi Regency, West Java 17540 [1]. The S curve is used to find out how long a project takes to complete. The aim of this research is to determine time efficiency in terms of the S Curve graph. The results of time management analysis using the S Curve on the graph showed that the realization of time delays was not in accordance with the plan.
Manajemen Waktu Pada Pekerjaan Mechanical Electrical Proyek Pembangunan Gedung Yayasan Pelita Ilmu Insani Ahmad Aguswin; Windi; Akhmad Akromusyuhada
Jurnal Informatika Ekonomi Bisnis Vol. 6, No. 3 (September 2024)
Publisher : SAFE-Network

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37034/infeb.v6i3.960

Abstract

The success or failure of a project can be influenced by the lack of planning of project activities, and the supervision carried out is ineffective and has an impact on the project running inefficiently. Then, it will result in delays and a decrease in the quality of work and have an impact on swelling the project budget. Project management is needed in order to manage projects starting from implementation to the end of a project. This research uses a case study on the Pelita Ilmu Insani Foundation Building Construction Project, especially on Mechanical Electrical work. This building is located on Jl. Rawa Kuda, Kp. Rawa Kuda RT/RW 004/002 Karangharum, Kedungwaringin District, Bekasi Regency, West Java 17540. The S curve is used to find out how long a project takes to complete and shows the progress of the project from the start of construction work to its completion. The aim of this research is to determine time efficiency in terms of the S Curve graph. The results of the time management analysis using the S Curve on the graph showed that the realization of time delays was not in accordance with the plan.