Tinjauan tentang dampak inflasi terhadap keputusan berdasarkan pencatatan biaya historis di Neraca Kafi Rijal; Insyirah Munawwar
Jurnal Teknik dan Teknologi Indonesia Vol. 1 No. 2 (2023): Juni : Jurnal Teknik dan Teknologi Indonesia (JTTI)
Publisher : Arsil Media

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62287/jtti.v1i1.14

Abstract

In an agency that has not used an Information System, usually the preparation of the report is often not on time and the presentation of the report often experiences errors in recording the nominal amount of the transaction. Fulfillment of the information needs of the management at a certain time cannot be fulfilled because the data is still in the form of a lot of paper archives, so that in searching for the data it is difficult, therefore agencies can experience delays in providing transaction report data to superiors. An agency must use a lot of computers as a means of supporting the office. In order to assist in maximizing management performance in matters of financial reporting. In this case agencies can take advantage of several applications that can be used, one of which is an Information System that can assist in recording financial transactions. Information systems that must be able to include a series of collections - a collection of reports on cash source activities and a summary of receipts, cash disbursements for a certain period to present information on the use of cash with the aim of reporting to internal parties as a basis for making decisions about plans for the future.
Analisis Pengaruh Penggunaan Metode Agile Dalam Manajemen Proyek Konstruksi Kafi Rijal; Ma'ruf Sirajuddin
Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan Vol. 1 No. 3 (2023): Agustus : Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/globe.v1i3.7

Abstract

Value engineering is used to produce alternatives or ideas that produce better/lower costs than previously expected given functional limitations and work quality. Looking at the current economic conditions, in ongoing construction work that requires a fairly large capital allocation, it is necessary to reconsider whether the design used is appropriate or not optimal. This can be done by examining the project design thereby saving money by identifying and reducing unnecessary costs without compromising the quality, reliability and functionality of the project itself.
Analisis Pengaruh Penggunaan Metode Agile Dalam Manajemen Proyek Konstruksi Kafi Rijal; Ma'ruf Sirajuddin
Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan Vol. 1 No. 3 (2023): Agustus : Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/globe.v1i3.7

Abstract

Value engineering is used to produce alternatives or ideas that produce better/lower costs than previously expected given functional limitations and work quality. Looking at the current economic conditions, in ongoing construction work that requires a fairly large capital allocation, it is necessary to reconsider whether the design used is appropriate or not optimal. This can be done by examining the project design thereby saving money by identifying and reducing unnecessary costs without compromising the quality, reliability and functionality of the project itself.