Claim Missing Document
Check
Articles

Found 3 Documents
Search
Journal : Venus: Jurnal Publikasi Rumpun Ilmu Teknik

Perencanaan Titik Hydrant Pada Gudang PT. Putraduta Buanasentosa Menggunakan Standart NFPA 14 Aditio Achmad Fauzi; Aditya Pradana; Dwi Novita Indirani; Wanda Ardhani Sulistyo; Dika Ayu Safitri
Venus: Jurnal Publikasi Rumpun Ilmu Teknik  Vol. 2 No. 2 (2024): April : Venus: Jurnal Publikasi Rumpun Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/venus.v2i2.263

Abstract

Awareness of potential hazards, risks of accidents, and the need for preventive measures is a must to create a safe and healthy working environment for all workers. The choice to implement a hydrant system is seen as an effective preventive measure in addressing potential fire risks, which are a major threat to the warehouse environment. Thus, this research planning has not only a purely academic purpose, but also seeks to make practical contributions to strengthening the application of the Principles of Occupational Safety and Health in the industrial sector. The planning research was done by jumping directly into the field and the data source was obtained from interviews with local authorities. This research describes the design of the hydrant system in order to be able and meet the safety standards set by the NPFA. The results of the conservation of the warehouse of PT. Putraduta Buanasentosa then the author was able to describe the building based on the construction of the building. The warehouse PT. Putraduta Buanasentoza requires hydrant boxes of 6 pieces. The water requirements for the fire protection system based on NFPA have been calculated by considering the building size as well as the risk of fire with hydrant 6 pieces and 1 hydrant pillar, requires 4800 liters of water/minute and to extinguish the fire in the event of a fire requires a time of 15 minutes where the required water requirements in 15 minutes is 72.000 litres of water.
Metode Pelaksanaan Perbaikan Tanah Menggunakan Metode Preloading dan Prefabricated Vertical Drain (PVD) Pada Pembangunan Jalan Lingkar Utara Lamongan Denis Tiyas Ayu Saputri; Fiarestu Wahyu Dewanti; Raihan Bryne Firdaus Al Machrus; Syahrizal Abdullah Razak; Dika Ayu Safitri
Venus: Jurnal Publikasi Rumpun Ilmu Teknik  Vol. 2 No. 2 (2024): April : Venus: Jurnal Publikasi Rumpun Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/venus.v2i2.268

Abstract

The construction implementation method is a very important part of the construction project to obtain the objectives of the project, the cost, quality and time. The technology aspect is very important in a construction project. Using the method of proper, practical, fast, and safe is very helpful in a construction project. Preloading and Prefabricated Vertical Drain (PVD) methods are intended to accelerate settlement and increase the bearing capacity of soft native soils by reducing pore water through PVD in the soil with the intention of reducing water content or air content in soil grains so as to accelerate long-term settlement. Preloading with PVD can reduce the material used for pre-loading, reduce embankment material, accelerate consolidation time, and increase embankment stability.
Analisis Mengenai Dampak Lingkungan Pada Pembangunan Jalan Lingkar Utara Lamongan Alfina Jana Vian Duri; Devalesio Kumara Wardhana; Mohamad Rahan Ardiansyah; Yohanes Godman Ora Etlatius Woda Sidi; Dika Ayu Safitri
Venus: Jurnal Publikasi Rumpun Ilmu Teknik  Vol. 2 No. 2 (2024): April : Venus: Jurnal Publikasi Rumpun Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/venus.v2i2.274

Abstract

Every development activity carried out will definitely have an impact on the environment, both positive and negative impacts. The construction of the Lamongan northern ring road is also inseparable from the environmental impacts it causes. Therefore, it is very important to pay attention to how to carry out this development in a way that produces maximum benefits for society while causing minimal negative impacts on the environment. One way to reduce the negative impact of development on the environment is to carry out an Environmental Impact Analysis (AMDAL). AMDAL is a formal and mandatory instrument for every development activity that may have a major impact on the environment. By carrying out an AMDAL, we can analyze the potential environmental impacts that will be caused by a development project and plan ways to reduce these impacts.This research aims to find out the parts of the AMDAL study and AMDAL problems in the Lamongan North Ring Road Construction and provide solutions or ways to overcome these problems. The research results show that activities observed from the aspect of environmental suitability are referred to as environmentally sound. In this case, there is a need for a comprehensive assessment of the potential environmental impacts that may arise as a result of the construction of the Lamongan northern ring road.In carrying out AMDAL, we need to pay attention to various aspects such as the impact on flora and fauna, air and water pollution, land use, and so on. By planning appropriate and sustainable management, we can minimize negative impacts on the environment and maximize the benefits that can be obtained from this development.