Claim Missing Document
Check
Articles

Found 1 Documents
Search
Journal : Journal Industrial Manufacturing

Implementasi Metode Single Minute Exchange of Dies di Bagian Packing Dalam Upaya Meminimasi Pemborosan (Waste) Dan Peningkatan Produktivitas (Studi Kasus PT. SF) Hardono, Joko; Hidayat, Dian Friana; Sa’diyah, Siti Halimatus
Journal Industrial Manufacturing Vol 9, No 1 (2024): Journal Industrial Manufacturing
Publisher : Program Studi Teknik Industri Universitas Muhammadiyah Tangerang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31000/jim.v9i1.10993

Abstract

PT. SF is a company engaged in the pharmaceutical industry. This company has several problems faced, one of the problems that often occurs is the high time in the machine setup process  , so that the fulfillment of production targets is disrupted. The number of types of products makes the number of model change processes which of course have different types, so that this has an impact on the amount of production produced. Therefore, this study was conducted to minimize setup time  using  the single minute exchange of dies (SMED) method. The results showed that there were  5 work stations in the packing section, where of these 5 work stations  the one with the highest setup time was the cartoning  machine workstation  with an initial setup time  of 63,84 minutes. After applying  the single minute exchange of dies (SMED) method, the setup process  can be lowered to 46,69 minutes. So it can save set-up time  by 17.15 minutes. Keywords: SMED implementation, setup time improvement, internal setup, external setup