Khoso, Ali Raza
Salehan Institute of Higher Education

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Motivational Factors for the Implementation of ISO-9001 in Construction Firms of Pakistan Akhund, Muhammad Akram; Memon, Aftab Hameed; Imad, Hafiz Usama; Siddiqui, Fida Hussain; Khoso, Ali Raza
Civil Engineering Journal Vol 4, No 9 (2018): September
Publisher : Salehan Institute of Higher Education

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (663.253 KB) | DOI: 10.28991/cej-03091135

Abstract

Motivating public and private construction firms to implement various management systems in their firms is not a simple job. Especially in Pakistan, management system is a new practice, most of the construction firms are not aware about the benefits of management system and what will be achieved after the implementation of management system. The implementation of ISO 9001 Quality Management System (QMS) in the construction industry is a continuing development method, particularly in small construction firms. On the other hand, the awareness level and readiness level of construction industry firms in Pakistan is yet very low as associated to other countries of Asia and Europe where ISO 9001 initiated. The purpose current study is to determine most responsible factors which will motivate the public and private construction firms of Pakistan to adopt the QMS (ISO 9001). A questionnaire survey was conducted and a total of 337 out of 553 questionnaires were received from public and private construction firms of AZBAGIKHPUSI areas. The analysis results depict 3 significant factors, which will motivate construction firms of Pakistan to implement ISO 9001 are (1) to qualify for bidding (2) to improve quality management system of company (3) to reduce wastage. Hence, based on these results and findings, the construction companies require ISO 9001 certification system and registration with Pakistan Engineering Council (PEC) as a constitution passed for the construction firms then to qualify for the bidding.
Assessment of Change Orders Attributes in Preconstruction and Construction Phase Khoso, Ali Raza; Khan, Jam Shahzaib; Faiz, Rizwan Ullah; Akhund, Muhammad Akram
Civil Engineering Journal Vol 5, No 3 (2019): March
Publisher : Salehan Institute of Higher Education

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (593.461 KB) | DOI: 10.28991/cej-2019-03091273

Abstract

Construction projects are very complex in nature. Each activity involves multiple varying tasks. Construction industry is the main source of economic growth. When change order occur performance of projects momentously affected.  Change orders often have a serious impact on the quality, time and cost. Eventually it results in disputes, delays, and dissatisfactions among stakeholders and ultimately results in failures of projects. In past several studies have been done to evaluate the causes of change order and its effects. Attempts have been made to quantify these impacts by many researchers, but the aim of this study is to identify the causes of change order in two different phases i.e. preconstruction and construction stage. Views were taken from relevant experts over included factors after in-depth literature review from past researches. A questionnaire was made and floated with different construction players from clients, consultants and contractors side. The data was analyzed by SPSS using average index technique. The analysis of data showed that, Mistakes in specifications, Mistakes in design and Lack of experience in selecting construction team by client are the most critical factors during preconstruction phase. Whereas, Design modification by owner, change in scope at later stage and Delays in payment by client are most critical factors of construction phase, responsible for change order. The extensive discussion of these factors revealed various parameters related to Pakistan construction. This study will enable the clients, consultants and contractors to be aware of factors which causes changes in orders and their consequences on project completion. By the identification of possible reasons, the right decisions can be made to mark the project successful.