PERKUATAN TEBING MENGGUNAKAN BRONJONG DI SUNGAI MANIKIN Benyamin, Elshinta A.; Udiana, I Made; Utomo, Sudiyo
Jurnal Teknik Sipil Vol 6, No 2 (2017): Jurnal Teknik Sipil
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (149.323 KB)

Abstract

Penelitian ini bertujuan: untuk mengetahui debit puncak banjir dengan kala ulang 50 tahun, dan besarnya momen yang mampu menahan stabilitas krib bronjong pada Sungai Manikin. Kemudian, akan dihitung debit banjir rencana 50 tahun menggunakan Metode Tahapan Langsung dimana didapat curah hujan rencana (Q50) berdasarkan Metode Log-Pearson Type-III adalah 573,410 m3/dtk, dan hasil dari debit banjir rencana tersebut dipakai untuk perhitungan debit banjir maximum (Q50) pada Potongan I–I = 1.253,300 m3/dtk, pada Potongan II–II = 1.281,300 m3/dtk dan pada Potongan III–III = 1.285,200 m3/dtk. Berdasarkan hasil perhitungan debit banjir dengan kala ulang 50 tahun yang didapat, maka dihitung stabilitas kekuatan krib bronjong terhadap debit yang terjadi, dan diadakan analisis kontrol terhadap stabilitas krib bronjong pada potongan I-I diperoleh momen tahan sebesar 67,100 ton meter dan momen guling 8,487 ton meter, besarnya gaya vertikal = 37,400 ton dan gaya horizontal = 5,004 ton. Pada potongan II-II diperoleh momen tahan sebesar 62,700 ton meter dan momen guling 8,926 ton meter. Besarnya gaya vertikal = 35,200 ton dan gaya horizontal = 5,579 ton. Pada potongan III-III diperoleh momen tahan sebesar 50,325 ton meter dan momen guling 12,621 ton meter. Besarnya gaya vertikal = 29,700 ton dan gaya horizontal = 5,513 ton. This research aimed at knowing flooding top discharge with re- period 50 years, to know level of moment capable to arrest, and detain stability line bronjong groyn on the Manikin Rivers. Based on the result used to calculate plan flooding discharge 50 years by using method direct phase where gotten [by] Plan Rainfall ( Q50) based on method Log-Pearson Type-III is 573,410 m3/dtk, and result from the plan flooding debit used for calculation flooding discharge maximum (Q50) at devaluation I - I = 1,253,300 m3/dtk, at devaluation II - II = 1,281,300 m3/dtk and at devaluation III - III = 1,285,200 m3/dtk. Based on result of calculation flooding discharge with re- period 50 years got hence calculated [by] strength stability line of discharge bronjong groyn happened, and performed [a] [by] control analysis to stability of bronjong groyn at cross section I-I is obtained [by] resistant moment 67,100 ton meter and moment of rolling 8,487 ton meter, level of vertical force = 37,40, ton and horizontal style = 5,004 ton. At cross section II-II is obtained [by] resistant moment 62,700 ton meter and moment of rolling 8,926 ton meter. level of vertical force = 35,20, ton and horizontal style = 5,579 ton. At cross section III-III is obtained [by] resistant moment 50,325 ton meter and moment of rolling 12,621 ton meter. level of vertical force = 29,700 ton and horizontal style = 5,513 ton.