Jurnal Ilmiah Teknik Industri
Vol 3, No 2 (2015): Jurnal Ilmiah Teknik Industri (Jurnal Keilmuan Teknik dan Manajemen Industri)

WASTE ELIMINATION USING VALUE STREAM MAPPING AND VALSAT

Dion Avellino Suyanto (Universitas Ma Chung)
Sunday Noya (Universitas Ma Chung)



Article Info

Publish Date
22 May 2017

Abstract

Fierce competition encourages companies to make continuous improvements to achieve better working efficiency. One method to improve the working efficiency is using the concept of lean manufacturing. The efficiency of the existing work in PT. Rimba Kencana is still not good because there are many processes that are not uniform and because of that, production lead time is increased. By using value stream mapping and value stream analysis tools (VALSAT), the production processes in the company are mapped into the current state mapping and future state mapping. In the current state mapping, the total value of production lead time is 59.49 days and the value of process cycle efficiency (PCE) is 0.013%. After doing improvement on welding department, the total value of production lead time decreased to 48.22 days and the value of process cycle efficiency becomes 0.016%. Keywords: Efficiency, Value Stream Mapping, Value Stream Analysis Tools

Copyrights © 2015






Journal Info

Abbrev

industri

Publisher

Subject

Computer Science & IT Control & Systems Engineering Decision Sciences, Operations Research & Management Industrial & Manufacturing Engineering Transportation

Description

Jurnal Ilmiah Teknik Industri is a scientific journal as a tool of Knowledge development in Industrial Engineering and Industrial management field. This journal consist of lecturers, researchers and partitions study. The Industrial Engineering Scientific Journal is published by the Industrial ...