PENGENDALIAN MUTU PEMBANGUNAN RUMAH SAKIT DI MOJOKERTO PROVINSI JAWA TIMUR

Romy Fansuri Yahya (politeknik negeri malang)
Sumardi , (politeknik negeri malang)
Dandung Novianto (politeknik negeri malang)



Article Info

Publish Date
17 Jul 2019

Abstract

The  project was undertaken by CV. Dwi Mulya Jaya with the contract price of IDR. 9,431,000,000.00 on 150 calendar days. An alternative project planning was in need to complete the project on time, cost, and qualityThe project planning included; 1) site layout; 2) traffic managemnet; 3) implementation method; 4) scheduling; 5) cost; 6) quality and 7) safety.Technical drawings, technical specifications, bill of quantity, and work unit price of Mojokerto 2016 were needed. Microsoft Exel 2013 and Microsoft Project 2007 were employed to determine the project price and scheduling.The planning results in: 1) direction kit in the front of the project, on the right side; 2) one-gate system; 3) two-zone system and cast-in-situ method; 4) on 147 calendar days; 5) at IDR 8,188,864,607.06; 6) the quality meeting the specification and Standard Operational Procedure; 7) applying safety rules on  Mondays.  Keywords: project planning, site layout, implementation method.

Copyrights © 2019






Journal Info

Abbrev

PROKONS

Publisher

Subject

Chemical Engineering, Chemistry & Bioengineering Civil Engineering, Building, Construction & Architecture Control & Systems Engineering Materials Science & Nanotechnology

Description

Jurnal Teknik Sipil (PROKONS), Terbit dua kali dalam setahun. PROKONS menerbitkan artikel penelitian yaitu penelitian asli teoretis dan eksperimental yang mengeksplorasi atau mengeksploitasi ide-ide dan teknik baru di empat bidang utama: teknik struktural, geomekanik, manajemen proyek konstruksi dan ...