Majalah Ilmiah Teknologi Elektro
Vol 16 No 3 (2017): (September - December) Majalah Ilmiah Teknologi Elektro

Group Decision Support System (GDSS) Untuk Evaluasi Penawaran Pekerjaan Konstruksi Menggunakan Metode AHP dan Borda

Gede Ogiana (Program Studi Magister Teknik Elektro, Jalan Panglima Besar Sudirman, Denpasar Bali Indonesia)
Ni Made Ary Esta Dewi Wirastuti (Program Studi Magister Teknik Elektro, Jalan Panglima Besar Sudirman, Denpasar Bali Indonesia)
Wayan Gede Ariastina (Program Studi Magister Teknik Elektro, Jalan Panglima Besar Sudirman, Denpasar Bali Indonesia)



Article Info

Publish Date
29 Dec 2017

Abstract

Evaluation of bids by WG ULP has an important role in the selection of providers of construction work to determine the potential winner. A group decision support system is a system that can help the Working Group ULP Bali provincial government in making decisions with the ability to analyze the construction work provider selection criteria with AHP and Borda method. With GDSS bid evaluation, all members of the Working Group can evaluate the ULP provider offering construction work optimally based on the criteria of administrative, technical prices so as to improve the quality of the repair process of group decision-making. Both methods are used because there are two stages in the decision-making that decision of individual and group decision. The test results show that the system can be applied GDSS as decision support systems in the bid evaluation provider of construction work and decided the company's most worthy to be a winner

Copyrights © 2017






Journal Info

Abbrev

JTE

Publisher

Subject

Electrical & Electronics Engineering

Description

Majalah Ilmiah Teknik Elektro diterbitkan dua kali dalam satu tahun oleh Jurusan Teknik Elektro Fakultas Teknik Universitas Udayana. Jurnal ini membahas tentang karya ilmiah berupa hasil penelitian dalam bidang elektro, meliputi sistem tenaga, telekomunikasi, informatika, dan elektronika. Penulis ...