RACIC : Rab Construction Research
Vol 5 No 1 (2020): Juni

PERENCANAAN ULANG TRAFFIC LIGHT PADA SIMPANG PRESIDEN KOTA PADANG

Bayu Budi Irawan (Unknown)



Article Info

Publish Date
29 Jun 2020

Abstract

In 2019 the presidential intersection was renovated by installing traffic lights, increasing the number of lanes, and geometric changes to the Jhoni Anwar road arm. The redesign is done by widening the road on the Jhoni Anwar (T) arm from 6.5 m to 9 m and the application turns left following the Traffic Light (PLT) on the arm of Jhoni Anwar (B). The recalculation results obtained a DS value of 0.83 with a service level "D" that is the current is approaching unstable, the speed is still controlled, Q / C can still be tolerated. The value of the average intersection delay is 37.75 sec / pcu. The queue length of the Khatib Sulaiman (U) 84 m, (S) 95 m, (T) 58 m, and the Jhoni Anwar (B) intersection arm 47 m. Budget Cost needed for Traffic Light planning is Rp. 328,959,800,-.

Copyrights © 2020






Journal Info

Abbrev

racic

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

RACIC "Rab Construction Research" (ISSN 2527-7073) adalah Jurnal yang dikelola oleh Program Studi Teknik Sipil, Fakultas Teknik Universitas Abdurrab, yang terbit secara berkala dalam dua edisi per ...