Jurnal Optimalisasi
Vol 6, No 1 (2020): April

Waktu Realistis Pengerjaan Proyek Rumah Tinggal Bertingkat Type 72 Dengan Metode Program Evaluation and Review Technique (PERT) di PT. XYZ Medan

Eddy Eddy (Program Studi Teknik Industri, Universitas Harapan Medan)
Abdul Gani Syahputra (Program Studi Teknik Industri, Universitas Harapan Medan)



Article Info

Publish Date
01 Jun 2020

Abstract

The complexity of managing a project requires good and accurate planning. This is done to overcome the obstacles that arise in the implementation of project work. One of them is the obstacle of late project completion time. Program Evaluation and Review Technique (PERT) is a network model that is able to map the time of completion of activities. PERT is very useful for managing a project because it provides information relating to the completion of a project. The use of PERT method in this study provides the results of the completion time of type 72-storey residential building project based on a critical trajectory of 114 days. Through a statistical approach and assuming the completion of a normally distributed project the realistic time span of completion of the project is between 114 days to 124 days. While the probability of completion of the project during the time frame is between 50% to 99.9%.

Copyrights © 2020






Journal Info

Abbrev

joptimalisasi

Publisher

Subject

Control & Systems Engineering Industrial & Manufacturing Engineering

Description

JURNAL OPTIMALISASI (JOPT) merupakan jurnal elektronik online yang diterbitkan oleh Program studi Teknik Industri, Fakultas Teknik, Universitas Teuku Umar. JOPT memuat kajian dibidang Manufaktur, Ergonomi dan Manajemen Rantai Pasok. Tujuan penerbitan jurnal optimalisasi adalah sebagai wadah ...