MONITORING PELAKSANAAN PROYEK REVITALISASI RUANG PAVILIUN RUMAH SAKIT UMUM Dr. SOEROTO NGAWI DENGAN METODE NILAI HASIL

Nugroho, Meriana Wahyu (Unknown)



Article Info

Publish Date
01 Dec 2016

Abstract

Every construction project certainly has constraint and barrier, to limit every constraint occurs in project conduction then it needs supervision or monitoring in carrying out of building activity. This research uses value result method to determine the time needed to finish and cost needed up to the finishing project. Here, there are there are three indicators attentioned in using result value method, they are BCWS, BCWP, and ACWP. The monitoring result from result value method calculation is that the estimation of the last finishing job are 123 days three days late from the normal is that 120 days in finishing. Whereas the cost spends up to the finishing job is estimated Rp. 612.512.649,00 lower than the cost determined, and it can be guess that the company get profits.Key words: project monitoring, result value methode, time, and cost.

Copyrights © 2016






Journal Info

Abbrev

reaktom

Publisher

Subject

Automotive Engineering Civil Engineering, Building, Construction & Architecture Electrical & Electronics Engineering Engineering

Description

Reaktom : Rekayasa Keteknikan dan Optimasi is open access and peer-reviewed journal, published by Universitas Hasyim Asy ari, Indonesia to disseminate research results from scientists and practitioners in Engineering and Science fields. Aim and Scope: Electrical Engineering: robotics, control ...