ANALISIS PENERAPAN SISTEM PENJADWALAN DENGAN METODE PERT PADA PROYEK KONSTRUKSI (STUDI KASUS: REHABILITASI DAN PENINGKATAN INFRASTRUKSI PASAR TRADISONAL KOTA MALANG)

Faris Rizal Andardi (Universitas Muhammadiyah Malang)



Article Info

Publish Date
31 Aug 2020

Abstract

PERT is a simplified software, to produce the expected project completion probability based on the duration or duration of a particular contract. In developing the PERT method a lot of research was carried out to perfect this method. The purpose of this study is to determine the overall duration of project completion, the magnitude of the project probability that can be completed in less than 170 days and more than 170 days, and the project completion time with the highest probability. Results of Analysis of Implementation of Scheduling System with PERT Method in Rehabilitation and Improvement of Traditional Market Infrastructure Projects in Malang City is the total duration of simulation results obtained 168 days faster than the 172 day plan. The probability of completing the 168 day project is 50%, while the probability of completing the 172 day project is 85.31%. The highest chance of the project being completed is 99.97%, with a duration of 181 days.

Copyrights © 2020






Journal Info

Abbrev

PROKONS

Publisher

Subject

Chemical Engineering, Chemistry & Bioengineering Civil Engineering, Building, Construction & Architecture Control & Systems Engineering Materials Science & Nanotechnology

Description

Jurnal Teknik Sipil (PROKONS), Terbit dua kali dalam setahun. PROKONS menerbitkan artikel penelitian yaitu penelitian asli teoretis dan eksperimental yang mengeksplorasi atau mengeksploitasi ide-ide dan teknik baru di empat bidang utama: teknik struktural, geomekanik, manajemen proyek konstruksi dan ...