JTRM (Jurnal Teknologi dan Rekayasa Manufaktur)
Vol 3 No 1 (2021): Vol 3 No 1 (2021): Volume: 3 | Nomor: 1 | April 2021

Perencanaan Strategi Preventive Maintenance Pada Mesin Shot Blasting di PT. ABC dengan Klasifikasi ISMO

Herman Budi Harja (Politeknik Manufaktur Bandung)
Aditya Riyanto Putra (Politeknik Manufaktur Bandung)
Wibawa Kresnandi (Politeknik Manufaktur Bandung)



Article Info

Publish Date
30 Apr 2021

Abstract

A shot blasting machine is a cleaning machine for casting products with a steel ball shooting mechanism from the impeller/blast wheel rotation's centrifugal force. As the main machine in the final process of casting production activities, the decrease in machine reliability has a negative impact on the production system. Currently, the production equipment maintenance strategy at PT ABC is still implementing corrective maintenance, which is unplanned and reactive when a machine malfunction occurs. It resulted in high production loss and increased maintenance costs. Therefore, the shot blasting machine's maintenance strategy should be changed to a type of preventive maintenance. This study aims to plan preventive maintenance (PM) system for the shot blasting machines of PT. ABC, such as creating PM schedule, calculating machine downtime, and technician needs for each PM activity. PM system planning is achieved using the ISMO (Inspection, Small repair, Medium repair, and Overhaul) method. Its method was conducted in several stages, which start with identifying machine objects, making PM work specifications, determining the value of mark complexity and maintenance cycle, calculating machine downtime and technician needs. Then making schedules annual and monthly, and several other maintenance documents. The mechanism for determining the complexity value is determined based on the similarity of the HP Garg methodology's machine specifications. Finally, The planning of the shot blasting machine PM system has been successfully done, some of the PM information obtained are (i) the machine maintenance cycle is C - I1 - I2 - S1 - I3 - I4 - M1 - I5 - I6 - S2 - I7 - I8 - M2 - I9 - I10 - S3 - I11 - I12 - C, (ii) the time interval between maintenance activities is one month, (iii) machine downtime for each shot blasting machine, (iV) the number and level of maintenance technicians required in every ISMO activity for drum shot, batch shot and hanger shot machines. The calculating verification of the shot blasting machine's availability value on the proposed PM schedule shows that machine availability increased to more than 80%.

Copyrights © 2021






Journal Info

Abbrev

JTRM

Publisher

Subject

Computer Science & IT Control & Systems Engineering Electrical & Electronics Engineering Industrial & Manufacturing Engineering Mechanical Engineering Social Sciences

Description

Jurnal Teknologi dan Rekayasa Manufaktur (JTRM) adalah jurnal yang difokuskan pada kajian, alih teknologi, difusi ilmu pengetahuan dan teknologi, rekayasa teknologi dan kebijakan pada bidang manufaktur dan ...