Designing project schedule using crashing method to compress the fiber to the home project schedule

Anugerah, Zha Sha Putri (Unknown)
Pratami, Devi (Unknown)
Akbar, Mohammad Deni (Unknown)



Article Info

Publish Date
24 Feb 2021

Abstract

ABC Company is an agent of network construction, operation, and maintenance. ABC Company is currently implementing the STTF (Shit to the Front) project, which is the project to add FTTH (Fiber to the Home) networks in areas that can have high customer demand. One of the STTF project construction sites is the Indra Prahasta II housing location. However, the project is currently experiencing work delays due to the Covid-19 disaster in Indonesia. Delays in project execution can result in potential prospects choosing another company that provides similar services. The project schedule can be accelerated using the crashing method and TCTO (Time Cost Trade-Off) analysis to solve this problem. This research's acceleration will be carried out with alternatives for adding 3 hours, 2 hours, 1 hour, and an alternative to increasing workers' number. This project has an average duration of 55 working days with a total cost of Rp 604,124,460. The results obtained from data processing, on the alternative of adding 1 hour of overtime work, the total duration becomes 54 working days with total project cost is Rp 605,734,138. In addition to 2 hours of overtime work, the project's total duration can be reduced to 54 days with a total project cost Rp 606,803,619. And for the addition of 3 hours overtime, the total duration can be shortened to 54 days with a total cost of Rp 606,803,619. As for increasing the number of workers, project work duration can be shortened to 54 working days with a total project cost Rp 604,556,748

Copyrights © 2021






Journal Info

Abbrev

ijio

Publisher

Subject

Decision Sciences, Operations Research & Management Engineering Industrial & Manufacturing Engineering

Description

The Journal invites original articles and not simultaneously submitted to another journal or conference. The whole spectrums of Industrial Engineering are welcome but are not limited to Metaheuristics, Simulation, Design of Experiment, Data Mining, and Production System. 1. Metaheuristics: ...