Application Of CPM Methode (Critical Path Methode) In Controlling The Time 100 Teus Contrainer Ship Hull Construction Project

Mia Syafrina (Politeknik Negeri Batam)
Fandy Bestario Harlan (Politeknik Negeri Batam)



Article Info

Publish Date
31 Jul 2021

Abstract

Construction projects are generally the most high-risk businesses, especially shipbuilding projects. Efforts to reduce the risk can be done by minimizing the potential risk. This study aims to see potential high risk and prevent delays in the completion of ship construction using the Critical Path Method CPM at PT. XYZ. By using the Critical Path Method CPM critical paths can be given more attention so that they will not interfere ship construction projects. In addition, it is also a form of anticipation if there is a delay, it is possible to reschedule.

Copyrights © 2021






Journal Info

Abbrev

JAEMB

Publisher

Subject

Economics, Econometrics & Finance

Description

Terbit dua kali setahun pada bulan Juli dan Desember: mulai Volume 6, Nomor 1, Juli 2018. Berisi tulisan yang diangkat dari hasil penelitian di bidang Akuntansi, Ekonomi, dan Manajemen ...