Journal Industrial Manufacturing
Vol 6, No 2 (2021): Journal Industrial Manufacturing

Peningkatan Produktivitas Kerja Dengan Pendekatan KKNI Menggunakan Metode Full Time Equivalent (Studi Kasus di PT. Rosy Ceramindo)

Hartono Hartono (Universitas Muhammadiyah Tangerang)
Bobby Kevinda M (UMT)



Article Info

Publish Date
23 Aug 2021

Abstract

Human Resources (HR) has an important role in a company. PT. Rosy Ceramindo is one of the companies engaged in manufacturing tableware. So we need to optimize the number of employees in accordance with their workload through workload analysis. Mapping employee competencies is made based on the job description of each position then compared to the Indonesian National Qualification Framework (KKNI). The method used is the Full Time Equivalent method using Java. The optimal number of employees based on FTE calculations for the Production Department is 94 people. Mapping of competencies based on job description and KKNI for the position of Section Chief is at level 6 equivalent to S1 or D4. For the positions of Mold Operators, Body Raw Material Milling Operators, Glaze Raw Material Milling Operators, Painting Operators, Pressure Casting Operators, Casting Operators, Finishing Operators, Decal Operators, Glazing Operators, and Roll Kiln Operators and Packing Operators at the levels. 2 is equivalent to SMA / SMK / MA.Keywords : FTE, SDM, JAVA, KKNI, Productivity .

Copyrights © 2021






Journal Info

Abbrev

jim

Publisher

Subject

Engineering Industrial & Manufacturing Engineering

Description

Journal of Industrial Manufacturing merupakan jurnal ilmiah yang berfokus terhadap continuous improvement dalam dunia industri (maufaktur dan jasa). Selain itu ruang lingkup jurnal mencakup seluruh keilmuan Teknik ...