Journal of Industrial Engineering Management
Vol 6, No 2 (2021): Journal of Industrial Engineering Management Vol. 6 No. 2

SUPPLY CHAIN RISK ANALYSIS IN KUB – IK MATARAM MACOA WITH HOUSE OF RISK (HOR)

Ahmad Padhil (Universitas Muslim Indonesia)
Nurul Chairany (Universitas Muslim Indonesia)
Arfandi Ahmad (Universitas Muslim Indonesia)
Hardianti Ramli (Unknown)
Rahmaniah Malik (Universitas Muslim Indonesia)
Anis saleh (Unknown)



Article Info

Publish Date
20 Aug 2021

Abstract

(KUB - IK ) Mataram  Macoa is a cocoa industry . The cocoa industry can produce chocolate with a cocoa material capacity of 87 kg per month or 1.0444 tons per year. Based on data from the Polewali Mandar Regency Statistics Agency, in 2018 the chocolate industry has a prospect that is still less proven with the data from BPS Polewali Mandar Regency, there is only 1 group of cocoa industry centers and the number of business units is 1 unit (BPS Polewali Mandar Regency, 2018).The company does not currently have a structured risk management to identify and mitigate risks that occur, especially in the supply chain function. By using the House of Risk method, the risks that may arise and their causes can be identified to simultaneously find ways to mitigate these risks to improve the operational quality of the Kelompok Usaha Bersama Industri Kecil Mataram Macoa  and open opportunities to detect profitable business opportunities for the company. The purpose of this paper is to determine the causes of the dominant risk and design response measures in the Kelompok Usaha Bersama Industri Kecil Mataram  Macoa. The basic method of writing is descriptive method and is implemented by using a case study method through a quantitative approach. The selection of respondents was carried out using purposive sampling technique. Methods of data collection by observation, in-depth interviews, questionnaires and literature study. The results of this paper indicate that in the activity plan there are 2 risks, in source activity there are 5 risks, in make activities there are 5 risks, in delievery activities there are 3 risks, and in return activities there is 1 risk. The risk treatment plan is designed to reduce the risk status for each risk event using a risk matrix

Copyrights © 2021






Journal Info

Abbrev

JIEM

Publisher

Subject

Control & Systems Engineering Decision Sciences, Operations Research & Management Energy Engineering Industrial & Manufacturing Engineering

Description

Journal of Industrial Engineering and Management memiliki No.ISSN : 2541-3090 (Cetak) dan No.ISSN : 2541-3090 (Online). Journal of Industrial Engineering and Management diterbitkan oleh Prodi Jurusan Teknik Industri Fakultas Teknologi Industri Universitas Muslim Indonesia. Terbit 2 (Dua) kali dalam ...