Target capacity of Solar Power Plant in Province of South Sumatra is pursued throughthe construction of a rooftop PV mini-grid system with off-grid and on-grid systems. Based onNational Energy General Plan (RUEN) in 2017, Province of South Sumatra has the third largestsolar power potential on a national scale with a target of Solar Power Plant developmentreaching 296.6 MW in 2025. Province of South Sumatra is the second most populous provinceon Sumatra Island with electricity consumption reaching 5,308 GWh in 2020. This study tries toanalyze the development of Solar Power Plant in Province of South Sumatra based on theliterature review. Solar Power Plant that has been installed until 2021 reached 12.441 MW oraround 4.12% of the South Sumatra RUEN target of 296.6 MW in 2025. The types of SolarPower Plant applications in Province of South Sumatra consist schools, hotels, palm oilfactories, irrigation pumps , and utility networks spread across Palembang, Muara EnimRegency, Muara Rawas Regency, and Ogan Hilir Regency

Copyrights © 2022






Journal Info

Abbrev

spektrum

Publisher

Subject

Computer Science & IT Electrical & Electronics Engineering Energy Engineering Industrial & Manufacturing Engineering

Description

Jurnal SPEKTRUM is peer review journal, published four times a year by the Department of Electrical Engineering, Faculty of Engineering, Universitas Udayana. This journal discusses the scientific works containing results of research in the field of electrical, include: power systems, ...