Bhara Petro Energi
Vol 1 No 1: Volume 1 Nomor 1 (Maret 2022)

Evaluasi Water Shut Off Dan Membuka Lapisan Baru Sumur Bagong Di Lapangan Lesma

Abdullah Rizky Agusman (Unknown)
Aly Rasyid (Unknown)
Dika Latief Lesmana (Unknown)



Article Info

Publish Date
11 Mar 2022

Abstract

Evaluation of Water Shut Off and Opening a New Layer of the Bagong Well in the Lesma Field, In oil and gas exploitation activities at the Bg01 Well, the well has been in production for a long time, so there is a problem where the proportion of water content in production wells continues to increase. compared to the proportion of oil and gas content produced, the improvement is carried out using the water shut off method by closing the existing perforation holes and opening new perforations in the same layer. Or closing the existing perforation holes that are indicated to cause an increase in water and the production of other perforated parts. By closing the layer, it is hoped that the water cut will decrease so that it will increase oil and gas production.

Copyrights © 2022






Journal Info

Abbrev

BPE

Publisher

Subject

Chemical Engineering, Chemistry & Bioengineering Energy Engineering

Description

Journal of Bhara Petro Energi (BPE) is a scientific journal managed and published by the Department of Petroleum Engineering, Faculty of Engineering, Bhayangkara University, Greater Jakarta. The focus of this journal is all about the upstream and downstream oil and gas industry as well as the ...