Perencanaan Pembangkit Listrik Tenaga Surya Di Perumahan Karyawan Blok B55 PT. Cipta Lestari Sawit Bumirejo Estate

Emidiana Emidiana (Universitas PGRI Palembang)
Perawati Perawati (Universitas PGRI Palembang)
Haidar Rudin (Universitas PGRI Palembang)



Article Info

Publish Date
22 Oct 2022

Abstract

Housing employees of PT. Cipta Lestari Sawit Bumirejo Estate in block B55 is located in the middle of an oil palm planta- tion, so the state electricity company network cannot reach the housing. So, this housing uses a diesel power plant (PLTD) as a source of electricity, its operational hours are limited and it also causes noise and air pollution. From this problem, one suitable solution is to build a solar power plant (PLTS) that does not cause noise and air pollution and its operating hours can be adjusted as needed. In planning PLTS, there are main components that need to be calculated including Solar Panels, Solar Carger Controller (SCC), Batteries, and Inverters. For planning PLTS in employee housing block B55 PT. Cipta Les- tari Sawit Bumirejo Estate requires 273 solar panels with a capacity of 300 wp per unit, 53 solar charge controllers (SCC) with a capacity of 80 amperes, 34 batteries with a capacity of 2000 Ah per unit, and 68 units with a capacity of 6000 watts per unit. to supply electricity to 70 houses and 8 street lights.

Copyrights © 2022






Journal Info

Abbrev

elektrika

Publisher

Subject

Electrical & Electronics Engineering

Description

Jurnal eLEKTRIKA diterbitkan oleh Jurusan Teknik Elektro, Fakultas Teknik, Universitas Semarang sejak tahun 2009, dan terakreditasi oleh Kementerian Ristekdikti pada tanggal 29 Januari 2009, dengan No. ISSN 2085-0565. Jurnal eLEKTRIKA adalah jurnal open akses dengan pelibatan mitra bebestari ...