INTAN Jurnal Penelitian Tambang
Vol. 1 No. 1 (2018): INTAN Jurnal Penelitian Tambang

TIME AND MOTION STUDY PEKERJAAN PENYANGGAAN PADA LOKASI PRODUKSI TAMBANG CIGUHA UTAMA PT. ANTAM (PERSERO) TBK UBPE PONGKOR

Deddy H. Elias (Jurusan Teknik Pertambangan)
Indra Birawaputra (Jurusan Teknik Sipil)



Article Info

Publish Date
27 Apr 2023

Abstract

Time and motion study is a method of time measurement process, from which time wasting in ground support task that involve human interventions, could be reduced. This method was utilised to figure out the efficiency resulted by buffering tasks, as well as to analyse the work cycle produced by supporting crews of Mega Mustika Utama in PT. Antam Tbk. UBPE Pongkor. The results revealed that the efficiency in workhours of ground support task included survey of location, job cards, and time for meals. The daily work cycle begun from change self protection tools at the beginning of the shift to the replacement of self protection tools at the end of the shift. The results also highlighted that the highest work efficiency of buffering tasks was 84.10%, and the lowest work efficiency was 25.83%

Copyrights © 2018






Journal Info

Abbrev

intan

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Decision Sciences, Operations Research & Management Earth & Planetary Sciences Economics, Econometrics & Finance Engineering

Description

Fokus dan lingkup Jurnal INTAN adalah Pertambangan baik dalam pengelolaan dan pengusahaan mineral atau batubara yang meliputi eksplorasi, konstruksi, penambangan, pengolahan dan/atau pemurnian atau pengembangan dan/atau pemanfaatan, pengangkutan dan penjualan, kegiatan reklamasi dan pascatambang, ...