Info-Teknik
Vol 23, No 1 (2022): INFOTEKNIK VOL. 23 NO. 1 JULI 2022

INSTALASI OFFSHORE DERICK FLARE STACK DENGAN METODE SEGMENTAL

Sulardi Sulardi (Teknik Perminyakan, Sekolah Tinggi Teknologi Migas Balikpapan)
Agus Sugianto (Teknik Sipil & Perencanaan, Universitas Balikpapan)
Basyaruddin Basyaruddin (Unknown)
Mardewi Jamal (Unknown)
Ali Arifin (Unknown)



Article Info

Publish Date
06 Jul 2022

Abstract

One of the problems in the construction work of the offshore derick flare stack is the difficulty of lifting and installing the steel structure derick flare installation due to the limited length of the boom crane arm. This study aims to provide an overview of working methods to overcome these difficulties. The working method of handling the problem is dividing structural components segmentally, lifting and installing structural segments with roller-based lifting aids and steel ropes. The results showed that the work method was proven to be able to overcome problems and prevent potential delays in completing work. The results of this study also recommend that this work method can be replicated to overcome problems in other work units that experience similar problems.

Copyrights © 2022






Journal Info

Abbrev

infoteknik

Publisher

Subject

Engineering

Description

Jurnal Info – Teknik menerbitkan artikel – artikel karya orisinil dan signifikan pada Bidang Rekayasa ...