PERBANDINGAN BIAYA DAN WAKTU SISTEM DILATASI BALOK KANTILEVER DAN DUA KOLOM PADA PROYEK GEDUNG BERTINGKAT KAMPUS B UNIVERSITAS AIRLANGGA

Monika Natalia (Unknown)
Riswandi Riswandi (Unknown)
Yan Partawijaya (Unknown)
Jajang Atmaja (Unknown)
M. Iqbal Kuswandi (Unknown)



Article Info

Publish Date
31 Dec 2022

Abstract

Almost all regions of Indonesia are geographically vulnerable to natural disasters, earthquake. One way to implement a very long and structurally stable building design in the event of an earthquake or other circumstances is to provide a dilation system for the building. This research was conducted in a multi-storey parking building project at Airlangga University Campus B which applies a cantilever beam dilatation system and will be compared with a two-column dilatation system in terms of cost and time. Cantilever beam dilatation is a structural separation that uses a beam structure with one end having a clamp and the other end is free, while two-column dilatation is a structural separation that uses two columns side by side with a certain distance. From the results of the study, it was found that the cost of structural work with cantilever beam dilatation was Rp. 76,755,100,000, - and for two-column dilatation is Rp. 76.063.550.000,- while the total project time with cantilever beam dilatation is 451 working days, and for two-column dilatation is 447 working days. The application of two-column dilatation is 0.9% more cheaper and four days earlier than the application of the cantilever beam dilatation system.

Copyrights © 2022






Journal Info

Abbrev

racic

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

RACIC "Rab Construction Research" (ISSN 2527-7073) adalah Jurnal yang dikelola oleh Program Studi Teknik Sipil, Fakultas Teknik Universitas Abdurrab, yang terbit secara berkala dalam dua edisi per ...