Jurnal Talenta Sipil
Vol 6, No 1 (2023): Februari

Identifikasi Bahaya Perencanaan Proyek Renovasi Gedung Hotel Horison Express Fatmawati Jakarta

Dhika Febrizal (Universitas Muhammadiyah Sukabumi)
Nia Kartika (Universitas Muhammadiyah Sukabumi)



Article Info

Publish Date
06 Feb 2023

Abstract

The implementation of construction development is an activity that causes many elements of danger, so it has a risk of work accidents. Factors that cause work accidents, ranging from a lack of employee discipline in maintaining occupational health and safety. This identification aims to assess the risks in the Planning of the Horison Express Hotel Building Renovation Fatmawati Jakarta, using a questionnaire with a frequency value (F) and a severity value (A), the results of the identification of the IBPRP method there are work items with a moderate level of risk in the Lt. 1-4 the relative risk value is obtained with a value of 9 (medium), and the work with a high level of risk is in the Lt. Structural Work. 5-6 relative risk values obtained Value of 20 (High), the results of the identification there are 58 basic events that cause the basic risk of 26 items of work, obtained a presentation of the value of low risk level of: 50%, moderate risk level of: 46.5%, and high risk level of: 3.5%. For hazard identification methods other than using the IBPRP method, can use other hazard identification methods for research on the same theme.

Copyrights © 2023