Jurnal Optimasi Sistem Industri
Vol. 15 No. 1 (2016): Published in March 2016

Optimalisasi Proses Perakitan Pesawat Tanpa Awak dengan Metoda Critical Path Methods (CPM)

Dendi Adi Saputra M (Jurusan Teknik Mesin, Fakultas Teknik, Universitas Andalas, Padang)
Eka Satria (Jurusan Teknik Mesin, Fakultas Teknik, Universitas Andalas, Padang)
Gusman Arif Pandy (Jurusan Teknik Mesin, Fakultas Teknik, Universitas Andalas, Padang)



Article Info

Publish Date
17 May 2016

Abstract

The manufacturing of Unmanned Aerial Vehicles (UAV) requires a design process that involves the design of aircraft’s components such as fuselage, wing, horizontal stabilizer, vertical stabilizer, ailerons, elevators, tail, and wing. The process takes a long time. Therefore, the distribution of structural works based on their characteristics and classifications by considering their design attributes and manufacturing processes is required. This research aims to find the optimal time and critical path of the assembly process of an UAV based on product work breakdown structure (PWBS) and critical path method (CPM). The result reveals that the optimal assembly time is 139 minutes. Finally, the application of product-oriented structural work distribution and the optimization of the assembly activities involved in the critical path successfully minimize the duration of the assembly process. 

Copyrights © 2016






Journal Info

Abbrev

JOSI

Publisher

Subject

Control & Systems Engineering Decision Sciences, Operations Research & Management Engineering Industrial & Manufacturing Engineering Mechanical Engineering

Description

Jurnal Optimasi Sistem Industri (JOSI) is a peer-reviewed journal that is published periodically (April and October) by the Department of Industrial Engineering, Faculty of Engineering, Universitas Andalas, Padang. ...