PENELITIAN AWAL PENENTUAN WAKTU PENYELESAIAN PROYEK DENGAN METODE PERT PROJECT EVALUATION AND REVIEW TECHNIQUE

Sentosa Limanto (Faculty of Civil Engineering and Planning, Petra Christian University)
Tirta Djusman Arief (Faculty of Civil Engineering and Planning, Petra Christian University)



Article Info

Publish Date
02 Jun 2004

Abstract

Construction involves many activities. Every activity need a portion of time which is defined as duration. Duration is a statistic probabilistic variable, which is expressed in a range of values. So the total time required to complete a construction project is also expressed in a range of times, thus the use of PERT to evaluate construction time is considered to be more realistic. An observation on a construction of a warehouse in steel structure in Surabaya shows that this method gives a tendency of good result. Abstract in Bahasa Indonesia : Pembangunan melibatkan banyak aktivitas. Tiap aktivitas memerlukan sejumlah waktu, yang didefinisikan sebagai durasi. Durasi adalah sebuah besaran statistik probabilistik, yang dinyatakan dalam satu interval nilai. Maka total waktu yang diperlukan untuk menyelesaikan pembangunan juga dinyatakan dalam satu interval waktu, sehingga penetapan waktu penyelesaian proyek dengan metode PERT dirasakan lebih realistis. Pengamatan atas pelaksanaan sebuah gudang yang terbuat dari struktur baja, di Surabaya, menunjukkan bahwa metode ini memberikan kecenderungan hasil yang baik.

Copyrights © 2002