ANALISIS POTENSI PENGHEMATAN PADA PLTU UNIT 5 DENGAN AUDIT ENERGI PADA MOTOR PEMAKAIAN SENDIRI DI PT PJB MUARA KARANG

Redaksi Tim Jurnal (Unknown)



Article Info

Publish Date
26 Nov 2018

Abstract

PT PJB Muara Karang power plant is an industry with a large electrical energy consumption for auxiliary power. In ISO50001 itensitas Energy Consumption (IKE) is a great need to audit energy consumption. In the contract the company's performance also set a percentage of personal use should not exceed 6% of the electricity production. Currently Posentase usage of own consumption at power plant unit 5 is greater than the power plant unit 4. It is necessary for an energy audit for the usage of its own in order to decrease the percentage of personal use in the power plant 5 0.5% of the current conditions and find energy savings opportunities in the power plant unit 5.To analyze this problem using energy audits, analyzes the performance test method using "gate cycle" and testing the quality of the voltage source by using the power quality measurement analysis. Having found the equipment with the largest energy comsumtion fish bone tools used to find the main cause of this disorder.

Copyrights © 2017






Journal Info

Abbrev

energi

Publisher

Subject

Computer Science & IT Control & Systems Engineering Electrical & Electronics Engineering Energy Engineering

Description

ENERGI & KELISTRIKAN Journal, especially to the Electrical Engineering Lecturer and generally to all Practitioners to be able to contribute in the form of scientific writing which will be useful for the application of science and technology, especially in the field of Electrical and Electrical ...