Jurnal Teknik Industri
Vol. 20 No. 1 (2018): June 2018

Multi-items Batch Scheduling Model for a Batch Processor to Minimize Total Actual Flow Time of Parts through the Shop

Nita P.A Hidayat (Universitas Ahmad Yani Bandung)
Andi Cakravastia (Institut Teknologi Bandung)
T.M.A Ari Samadhi (Institut Teknologi Bandung)
Abdul Hakim Halim (Institut Teknologi Bandung)



Article Info

Publish Date
02 Jul 2018

Abstract

This study is inspired by a batch scheduling problem in metal working industry which guarantees to satisfy a due date as a commitment to customers. Actual flowtime adopts the backward scheduling approach and considers the due date. Using the actual flowtime as the objective means that the solution  is oriented to satisfy the due date, and simultaneosly to minimize the length of time of the parts spending in the shop. This research is to address a problem of scheduling batches consisting of multiple items of parts processed on a batch processor where the completed parts must be delivered several time at different due dates. We propose an algorithm to solve the problem.

Copyrights © 2018






Journal Info

Abbrev

ind

Publisher

Subject

Industrial & Manufacturing Engineering

Description

Jurnal Teknik Industri aims to: Promote a comprehensive approach to the application of industrial engineering in industries as well as incorporating viewpoints of different disciplines in industrial engineering. Strengthen academic exchange with other institutions. Encourage scientist, practicing ...