INTEK: Jurnal Penelitian
Vol 3, No 2 (2016): October 2016

Determining Interval Time of Maintenance in Bosowa Cement Indonesia using Reliability Method

Muhammad Arsyad Suyuti (Unknown)
Rusdi Nur (Jurusan Teknik Mesin)



Article Info

Publish Date
06 Nov 2016

Abstract

Maintenance for machining and production facility is an important aspect to ensure a smooth production process. During this time, it was performed regular maintenance based on technical advice from supplier’s engines which just shows things in general without considering the actual operating conditions. This paper aims to plan the maintenance strategies for the Finish Mill unit based on reliability analysis by considering the target system reliability and cost of improving reliability. The data distribution obtained the most appropriate distribution. Based on the data obtained distribution parameters, then the function of the reliability of each part an be determined so that the value of the reliability of each part and the overall system for a specific time period can be calculated. The results showed that the failure or breakdown Mill Finish Unit was majority caused by the part of 561.BM1, 531.WF1, 531.BC6, 531.BC2, 531.BC1, 561.SR1 and 531.BC3. it means that need to focus o the reliability analysis to allocate their parts.

Copyrights © 2016






Journal Info

Abbrev

Intek

Publisher

Subject

Education

Description

INTEK: Jurnal Penelitian sebagai wadah komunikasi ilmiah antar akademisi, peneliti dan praktisi dalam menyebarluaskan hasil penelitian. Jurnal INTEK Terbit 2 Kali dalam setahun yaitu pada Bulan April dan Oktober, dan memuat hasil-hasil penelitian dalam bidang Rekayasa Teknik Mesin, Rekayasa Teknik ...