cover
Contact Name
Dr. Taufiq Rochman ST, MT
Contact Email
taufiq.rochman@polinema.ac.id
Phone
+6285735783419
Journal Mail Official
prokons@polinema.ac.id
Editorial Address
Jalan Soekarno-Hatta No. 09, PO BOX 04 Malang 65141
Location
Kota malang,
Jawa timur
INDONESIA
Prokons: Jurnal Teknik Sipil
ISSN : 19781784     EISSN : 27148815     DOI : -
Jurnal Teknik Sipil (PROKONS), Terbit dua kali dalam setahun. PROKONS menerbitkan artikel penelitian yaitu penelitian asli teoretis dan eksperimental yang mengeksplorasi atau mengeksploitasi ide-ide dan teknik baru di empat bidang utama: teknik struktural, geomekanik, manajemen proyek konstruksi dan teknik transportasi. Tujuan jurnal ini adalah untuk memajukan ilmu pengetahuan yang berkaitan dengan teknik sipil dan berfokus pada bangunan, infrastruktur, sistem jembatan serta pemasangannya atau konstruksi.
Articles 1 Documents
Search results for , issue "Vol. 8 No. 2 Agustus 2014" : 1 Documents clear
PERBANDINGAN ERECTION RANGKA BAJA JEMBATAN DENGAN MENGGUNAKAN MAST CRANE DAN TOWER CRANE PADA PROYEK JEMBATAN TRISULA BLITAR Agnes Hanna Patty, Armin Naibaho, Singgih Fitra Utama,
Prokons: Jurnal Teknik Sipil Vol. 8 No. 2 Agustus 2014
Publisher : Jurusan Teknik Sipil, Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

At Trisula bridge project Blitar, Mast Crane (MC) ?was used for the erection of steel frame bridge while Tower Crane? (TC) was an alternative for the implementation of structure work. The purpose of the study is compare the two? cranes in terms of time and cost. The bridge is of 70 m span; the maximum length of MC can reach is of 3 m and TC is of 40 m. The data of daily, weekly, and monthly report and the 18-week planned S ? Curve were needed to find out the implementation time. The implementation cost was calculated from the setting cost of S ? Curve at IDR 739.883.800,00. Pylon method was ratio of maximum strand force 0,914 for MC and 0,924 for TC.The calculations result in 283,065 hours of MC use at IDR 739.883.800,00. And 161,219 hours of TC use at IDR 1.056.436.000,00.Keywords: comparison, erection, frame.