cover
Contact Name
Dr. Taufiq Rochman ST, MT
Contact Email
taufiq.rochman@polinema.ac.id
Phone
+6285735783419
Journal Mail Official
prokons@polinema.ac.id
Editorial Address
Jalan Soekarno-Hatta No. 09, PO BOX 04 Malang 65141
Location
Kota malang,
Jawa timur
INDONESIA
Prokons: Jurnal Teknik Sipil
ISSN : 19781784     EISSN : 27148815     DOI : -
Jurnal Teknik Sipil (PROKONS), Terbit dua kali dalam setahun. PROKONS menerbitkan artikel penelitian yaitu penelitian asli teoretis dan eksperimental yang mengeksplorasi atau mengeksploitasi ide-ide dan teknik baru di empat bidang utama: teknik struktural, geomekanik, manajemen proyek konstruksi dan teknik transportasi. Tujuan jurnal ini adalah untuk memajukan ilmu pengetahuan yang berkaitan dengan teknik sipil dan berfokus pada bangunan, infrastruktur, sistem jembatan serta pemasangannya atau konstruksi.
Articles 1 Documents
Search results for , issue "Vol. 9 No. 2 Agustus 2015" : 1 Documents clear
OPTIMALISASI BIAYA DAN WAKTU PELAKSANAAN PEKERJAAN PERANCAH MENGGUNAKAN SCAFFOLDING PADA BANGUNAN BERTINGKAT DENGAN SISTEM ZONING Santoso, Suselo Utoyo, Armin Naibaho, Edy
Prokons: Jurnal Teknik Sipil Vol. 9 No. 2 Agustus 2015
Publisher : Jurusan Teknik Sipil, Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

On the implementation of the scaffolding work in a large and typical structures, the work area usually is distributed into several areas or work zones due to the limited area for mobilization of material and equipment, work schedule, structure form, limited resources and so on. The distribution of the different areas or zones in the typical structure will affect the circulation of the equipment removal of the scaffolding .The review was carried out by simulating the time various working methods using zones in 1 floor and 8 different floors. The zoning was of 6 zones, 3 zones, and 1 zones for one floor with various completion of 10 work days, 7 work days, and 5 work days. Work schedule was made based on each model. With reference to the work schedule, calculations, cost and time maximization of scaffolding was carried out. Data analysis process?s were (1) material and tool analysis, (2) job cost analysis, and (3) unit price analysis. The calculations result in an effective and efficient method is by employing 3 zones withim 7 work days for each floor. So it is for the entire 8 floor. With the implementation cost as many as IDR 42,203,210 for 1 floor and IDR 327,113,217 for 8 floors.Keywords: maximization, scaffolding, zone