Jurnal Teknik Industri Terintegrasi (JUTIN)
ISSN : 26208962     EISSN : 26208962     DOI : 10.31004jutin
Jurnal Teknik Industri Terintegrasi merupakan jurnal yang dikelola oleh Program Studi Teknik Industri Fakultas Sains dan Teknologi Universitas Pahlawan Tuanku Tambusai yang menjebatani para peneliti untuk mempublikasikan hasil penelitian di bidang ilmu teknik dan teknik industri mencakup proses manufaktur, kegagalan dan rekayasa material, perawatan berbasis keandalan, keselamatan kerja, perancangan sistem kerja dan ergonomi, pengendalian dan penjaminan mutu, tata letak fasilitas, penelitian operasional, kewirausahaan dan pengembangan bisnis
Arjuna Subject : -
Articles 51 Documents
Search results for , issue "Vol. 6 No. 3 (2023): July 2023" : 51 Documents clear
Penerapan Preventive Maintenance dan Pemasangan Emergency Lamp Dalam Minimasi Product Defect Akibat Heater Terhadap Produk Kemasan Helmi Maulana; Siti Muhimatul Khoiroh
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 6 No. 3 (2023): July 2023
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v6i2.15333

Abstract

Plant printing is a company unit tasked with fulfilling product packaging needs. In the production of printing plants from July to December, it was found that an average of 4% of products had defects (defects) exceeding the allowable tolerance limit of 2% per month, the biggest cause of problems with one of the machine components, namely the heater component. In these components found downtime of 3900 minutes for 3 months. Based on these problems, it is necessary to take preventive measures with a preventive maintenance approach by determining the schedule which is obtained from the calculation of the mean time to failure (MTTF) that the recommended maintenance interval is once every 5 days. Plus another improvement with the installation of an emergency lamp if the heater is indicated to be experiencing a mismatch. After the two approaches and improvements were carried out, a decrease in the number of product defects was obtained where the defect in the previous 6 months averaged 4% and in the following month after implementation the number of defects decreased to only 1.83%.
Analisis Manajemen Risiko pada Tingkat Kinerja Pelayanan Kapal di PT X Sandy Valdeza; Ajeng Putri Dwi Wahyuni; Nadila Febriani; Vivian Karim Ladesi; Siti Sahara
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 6 No. 3 (2023): July 2023
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v6i3.15391

Abstract

Loading and unloading activities are the transfer of cargo from ship to port or vice versa. One of the loading and unloading activities is on liquid bulk cargo. Loading and unloading activities are related to ship services, namely ET indicators: BT. One of the indicators is Idle Time (IT). Idle Time (IT) is the number of unused working hours during loading and unloading work time at the mooring. IT value < RKAP indicates minimal obstacles to loading and unloading operations. The purpose of this study is to analyze Idle Time in liquid bulk loading and unloading activities every month and analyze the factors that can affect the performance of liquid bulk loading and unloading in 2021 at Company X. This research uses descriptive quantitative methods. The results of the analysis of Company X, namely Idle Time (IT) are not good because IT> RKAP. There are obstacles in loading and unloading activities due to various factors. The inhibiting factors are tool factors, environmental factors and worker factors. This requires good risk management.
Analisis Postur Kerja Karyawan Produksi Sepatu Olahraga Menggunakan Metode Novel Ergonomic Postural Assessment pada Karyawan Ruang Produksi UD. XYZ Gresik Rizky Dharmaji; Said Salim Dahda
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 6 No. 3 (2023): July 2023
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v6i2.15400

Abstract

This research is discussed about the analysis of work posture in small-medium industries that produce sports shoes. UD XYZ Gresik is one of the companies in the athletic shoe industry that receives requests for shoes every day. Working hours for 9 hours with a break time of 1 hour. Production targets are sometimes not achieved, causing employees to work overtime. Along with the targets that must be achieved every day, employees in the shoe production room have to sit for a long time during working hours. Long working hours have an impact on musculoskeletal disorders, especially back pain. Working posture (sitting position) and length of work are factors that affect physical ability which continues to decline. Thus resulting in absenteeism and economic losses caused by a decrease in work capacity and a decrease in employee productivity. Novel Ergonomic Postural Assessment as an ergonomics method used as a tool to analyze the risk of ergonomics and working posture in the upper body to reduce the risk of musculoskeletal injuries in the production process. The results showed that the value of the first working posture was 6 (work posture needs further research and action is needed in the near future). For the second working posture, the final NERPA score was 7 (work posture needs to be checked further and action taken as soon as possible). Both of these scores require improvement due to the risk of severe musculoskeletal disorders.
Meminimalisir Tingkat Kecacatan Produk Biji Kopi Robusta Arjuno Pada Proses Produksi Untuk Meningkatkan Kualitas Produk Andreas Edo Wibowo; Siti Muhimatul Khoiroh
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 6 No. 3 (2023): July 2023
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v6i3.15665

Abstract

Kopikula Roastery Coffee, a producer of Robusta Arjuno coffee beans, experienced aproduction decline due to product defects. By using Statistical Process Control (SPC), the quality was analyzed, and the causes of defects were identified. The company had a low quality control level, with a defect percentage of 2.97%. Factors such as workers, methods, environment, and machinery contributed to the defects. To minimize the number of defects, standardization, improved production methods, workspace enhancements, and machinery component replacements were implemented. As a result, the defect percentage decreased to 1.84%. Kopikula Roastery Coffee is dedicated to continuously improving product quality through effective quality control measures, aiming for customer satisfaction and upholding its reputation as a producer of high-quality coffee beans.
Analisis Perhitungan Tenaga Kerja pada Produksi Rambut Palsu (Studi Kasus : CV. Mahkota Kreasi Berlina) Alif Beta Mulya Insani; Siti Muhimatul Khoiroh
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 6 No. 3 (2023): July 2023
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v6i3.15726

Abstract

CV. Mahkota Kreasi Berlina is struggling to keep up with demand. Even though currently, CV Mahkota Kreasi Berlina has added working hours every week. In this case CV. Mahkota Kreasi Berlina has never carried out a workforce optimization calculation and made a comparison of additional workers with overtime hours. therefore, in order to meet demand, researchers will calculate the need for labor and make a comparison between adding labor and overtime according to production planning or with the workload analysis (WLA) method at the minimum cost. From the results of data processing, the minimum cost results are obtained, namely the calculation of the number of labor requirements in a 6 month period using 42 workers and overtime with a total cost of Rp. 495,800,000 per 6 months. Calculation of labor with WLA resulted in the company incurring substantial costs, where the results of the calculation of WLA amounted to Rp. 526,392,533 per 6 months
Analisa Pemeliharaan Mesin Produksi dengan Metode Reliability Centered Maintenance (RCM) dan Age Replacement Joko Tri Juwandono; Jaka Purnama
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 6 No. 3 (2023): July 2023
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v6i3.15768

Abstract

Maintenance is needed to keep a machine operating under normal conditions for a certain period of time. PT. Daesang Ingredients Indonesia produces its packaging at a printing plant with the help of rotogravure printing, laminating and slitting machines. A total downtime of 21,100 minutes was obtained from March 2021 to March 2023, resulting in a decrease in production and an increase in costs due to corrective machine maintenance. This study aims to provide preventive maintenance proposals by identifying critical components and optimal maintenance actions using the Reliability Centered Maintenance (RCM) method and formulating component replacement intervals to minimize downtime with Age Replacement. Based on the research results, it is known that the critical components are the bearing, vanbelt and slitting blade components with time direct optimal maintenance measures, while the hose components and impression rollers are condition direct. The formulation of the replacement interval for the bearing, vanbelt and impression roller printing machine components is 23,000 minutes, 49,000 minutes and 47,000 minutes. For bearing components, hoses and vanbelt laminating machines for 28,000 minutes, 35,000 minutes and 44,000 minutes. As for the components of the slitting blade, bearing and vanbelt slitting machine 80,000 minutes, 120,000 minutes and 150,000 minutes
Desain Fasilitas Kerja dan Analisa Kondisi Mikroklimat Berdasarkan Prinsip Ergonomi Guna Meningkatkan Produktivitas Pekerja Ahmad Badawi; Sajiyo Sajiyo
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 6 No. 3 (2023): July 2023
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v6i3.15770

Abstract

The research of ergonomic work facility design on the sandal assembly process aims to determine the differences experienced by workers in standard time, workload, musculoskeletal complaints, work fatigue, productivity before and after the design. In addition, an analysis of the microclimate conditions was carried out to determine whether the work space in the sandal assembly process met the standards. The research method used a quantitative method, which is an analysis method in the form of numbers. Data were obtained objectively and subjectively and then analyzed using MS.Excel. and a Paired Sample T test was performed to determine whether the difference results had a significant change. The results showed that there was a difference when using old and new work facilities. It is known that the new design has a positive impact on workers both in standard time, workload, musculoskeletal complaints, work fatigue, and productivity. As well as the microclimate conditions, it is known that temperature, wind speed, and light intensity in the work space do not meet the standards, and only room humidity meets the standards
Analisa Percepatan Proyek Pembuatan Mesin Grinding Cat Dengan Time Cost Trade Off Method (Studi Kasus : PT TDI Sidoarjo) Safira Azham Abdullah; Mochammad Singgih
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 6 No. 3 (2023): July 2023
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v6i3.15772

Abstract

The case study in this research is a project to manufacture a paint paste grinding machine at PT Pabrik Cat Tunggal Djaja Indah. In its implementation, this project is considered to have a delay of 2 weeks, with a total project completion time of 120 days, so project acceleration is needed. The scheduling method is carried out using PDM (Precendence Diagram Method) with the help of Microsoft Project 2016 software to find the critical path, then after knowing the critical activities, crashing is carried out with the alternative of adding working hours or overtime and adding optimum workers. The Time Cost Trade Off method will analyze the time after crashing. The optimal duration to complete this project is 107 days with an acceleration of 13 working days with a percentage of 10.38% and an optimal total cost of Rp 262,947,693 with a cost efficiency of 3.56%.
Analysis of Quality Defects in Plastic Seed Products Using Statistical Process Control (SPC) Method Ubaidillah Ubaidillah; Istantyo Yuwono
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 6 No. 3 (2023): July 2023
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v6i3.15812

Abstract

Plastic seed products are products made from recycled plastic materials such as raw materials for plastic bags and some screen printing plastics. UD. ABC is a company that produces PP (Polypropylene) plastic pellets. The existing problems include the discovery of instability in the production of plastic pellets which is in a negative direction for the company, namely there are product defects in plastic pellet products that exceed the standard defect tolerance limit of the company by 2%. Based on the Pareto diagram, it can show that the type of protrusion defect is 69.56% more dominant than the type of connecting defect, which is 30.44%. Based on the control chart based on the p-chart, it shows that some dates are outside the limits of the control chart, namely the sample lot number 3 (March) of 0.0352, 4 (April) 0.0273, 7 (July) 0, 0134, 8 (August) 0.271. The data that comes out of the control chart limits exceeds the upper control limit (BKA/UCL) of 0.02649 and the lower control limit (BKB/LCL) of 0.02395. So what must be done to repair the engine factor is to carry out periodic briefings on how the machine works starting from setting the temperature and changing the filter. Meanwhile, the human factors section, namely directing the replacement of machine filter workers with temperature operators so that workers do not get tired easily, conducting periodic supervision of each worker for the leader and providing guidance on knowledge about machine work systems, mixing raw materials and operating machine temperature controls regularly.
Studi Waktu Kerja untuk Meningkatkan Produktivitas Kerja pada Pembuatan Upper Sandal Haris Abdi; Herlina Herlina
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 6 No. 3 (2023): July 2023
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v6i3.15825

Abstract

KUB Capable of Jaya is an industrial business formed from skills training to improve the economy and standard of living of the residents. This company produces goods that focus on types of footwear, namely hotel slippers, sandals, shoes, and upper sandals. In the upper sandal production process, problems were found at work time where workers did not have a time reference and target production in the production process. This causes a lot of free time and affects the speed of workers in doing work which will have an impact on production results that cannot meet the number of customer orders. The purpose of this research is to find out the standard production time, standard production output, and the number of workers needed so that the amount of production can meet the target order. The methods used to solve this problem are the work sampling method, standard output, and workload analysis. The standard time to produce 1 unit of upper sandals is 68,24 seconds, the standard output produced in 1 day is 422 units or 211 pairs, and the number of workers in the cutting process is 5 people, 1 person is punching holes, 1 person is installing buckles, 1 person for the buckle locking process, and 1 person for the installation/finishing process