Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi
ISSN : -     EISSN : 26215276     DOI : 10.38043
Papers published in this journal focus on or are related to the fields of Civil Engineering, Electrical Engineering, Informatics, and their sub-fields: Structure, Transportation, Geotechnical, Water Resources, Construction Management, Environmental, EngineeringPower/Energy System, Information Systems, Electronics, Control System, Computer system.
Articles 6 Documents
Search results for , issue "Vol 3 No 1 (2020)" : 6 Documents clear
Evaluasi Perencanaan Struktur Komposit Menggunakan Metode Load Resistance Factor Design (LRFD) Pada Gedung C Undiknas Denpasar Indah Saiful Fajarani; I Gusti Lanang Bagus Eratodi
Jurnal Ilmiah Telsinas Vol 3 No 1 (2020)
Publisher : Universitas Pendidikan Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (482.28 KB)

Abstract

Perkembangan teknologi rekayasa dan analisis struktur bangunan sipil saat ini sedang berkembang pesat, termasuk bidang desain struktur di dunia konstruksi gedung. Selama ini material bangunan yang digunakan dalam bidang konstruksi khususnya bangunan gedung masih rata-rata menggunakan bahan dari kayu dan beton. Namun seiring dengan berkembangnya tuntutan kebutuhan, waktu dan ilmu pengetahuan mulai menggunakan material baja. Penggunakan material baja dapat mengurangi limbah konstruksi yang selama ini menjadi masalah bagi lingkungan. Semakin berkembangnya pengetahuan dalam bidang konstruksi maka terciptalah berbagai metode dalam mendesain struktur salah satu diantarnya adalah sistem struktur komposit yang terdiri dari gabungan antara beton dan baja. Perencanaan Gedung C Universitas Pendidikan Nasional menggunakan bahan komposit pada bagian kolom dengan menggunakan metode ASD. Bangunan ini terdiri dari 5 lantai denan luas bangunan 40x19 m2, Berdiri pada kondisi tanah sedang. Analisa struktur penelitian ini menggunakan bantuan program SAP 2000 V14, sedangkan dalam perhitungan elemen struktur dilakukan secara manual dengan metode LRFD yang berpedoman kepada SNI-03-1729-2002. Hasil analisis pada penilitian ini diperoleh bahwa metode LRFD memberikan kontribusi kekakuan yang lebih tinggi pada kolom dan berakibat penggunaan profil balok yang lebih efektif (kecil) yaitu WF 298x201x14x9 dibandingkan dengan besar profil balok metode ASD yaitu WF 400x200x13x22. Reaksi perletakan struktur gaya aksial menggunakan metode LRFD lebih efektif sebesar 5% dari total rata-rata gaya aksial ASD dan LRFD. Namun metode LRFD membutuhkan kolom dengan tegangan efektif momen yang lebih besar dibanding metode ASD.
Evaluasi Perencanaan Dermaga (Jetty) Pada Pelabuhan Dili Timor Leste Teodósio Gil Soares da Costa; Putu Ariawan; Komang Agus Ariana
Jurnal Ilmiah Telsinas Vol 3 No 1 (2020)
Publisher : Universitas Pendidikan Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (494.182 KB)

Abstract

The jetty is an important facility for a port to support its operational activities. The construction of the jetty at the port of Dili, East Timor is to serve the crossing from Dili to Oecusse, Atauro and vice versa. This jetty has a length of 100 m and a width of 20 m which is a prestressed concrete jetty.The Section of evaluation for jetty plan at Dili Port, East Timor are: the supper structure of the jetty includes among others fender, bollard, vehicle floor plate, and prestressed beam as soon as the sub structure of the jetty there is a poer and pile foundation. Analysis in evaluation structure is based on SNI T-02-2005, SNI 1727: 2013, SNI 2052-2014 and SAP 2000 with the quality of concrete f’c 30 Mpa and the quality of steel reinforcement f’y 400 Mpa.Based on the evaluation for jetty plan at Dili Port, East Timor, is obtained on the dimension of the jetty plate are 30 cm thick with reinforcement direction pedestal x and y equal to = 0,075, while the dimension of the prestressed beam are 70 cm wide and 90 cm high reinforcement pedestal direction x and field direction x equal to ? = 0,066. Poer is planned to be a single unit (monolith) with a pile, while the dimensions of the pile are 45 cm in diameter, 1,2 cm thick and 42,50 m in length. On the berthing structure is used a rubber fender tipe seibu V with a V-300 H capacity, and the mooring structure used is a bent bollard with a capacity of 25 tons.
Perancangan Sistem Monitorinng Suhu Under Counter Chiller Di Hotel Hilton Berbasis Internet of Things Wayan Suriana; Elvis Kase; I Nyoman Gede Adrama
Jurnal Ilmiah Telsinas Vol 3 No 1 (2020)
Publisher : Universitas Pendidikan Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1286.017 KB)

Abstract

Designing a system for long-distance temperature monitoring Under Counter Chiller in Hilton Hotel using IoT (Internet of Things) technology. The developed system consists of two parts; the controlling system and the monitoring system. First, the controlling system can turn on the hot air exhaust fan in the compressor system if the temperature in compressor part exceeds 40°C. This is to manage the temperature as wanted from the Under Counter Chiller chamber at Hilton hotel. Second, the monitoring system which can give information to the user real time. It will be easier and faster for the user to gain needed information related to the temperature being monitored at that very moment. From the temperature measurement made by the writer, it is obtained that the average temperature in chiller machine gained from the temperature measurer was 9.23 ºC. The average difference of temperature obtained from the temperature measurer was 0.38 ºC. The data was then sent by ATmega328 and ESP8266 Micro controller to the Web Server MyDevice Cayenne.
Perencanaan Pondasi Bore Pile Menggunakan Metode Standard Penetration Test (SPT) Cone Penetration Test (CPT) dan Analisis Efisiensi Biaya (Studi Kasus Proyek Hotel Solis Ubud Resort and Spa) Roberth Evander Meidudga; I Gusti Ngurah Nyoman Wismantara
Jurnal Ilmiah Telsinas Vol 3 No 1 (2020)
Publisher : Universitas Pendidikan Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (500.672 KB)

Abstract

The planned foundation at the hotel solis ubud resort and spa is a drill pole,caused soil conditions is impossible, to install shallow types. known from the results of soil tests obtained on the project, by using CPT method and SPT method. In this Thesis , the authors plan footing of the drill post by calculating capacity of the soil at that location with the planned depth using the data obtained from the building project, with two method, first standard penetrationt test (SPT) second cone penetration test (CPT) to compare cost efficiency of both methods in bore pile footing design, in hotel solis ubud resort and spa building project. the theoretical results obtained can be concluded that the SPT method used in the project, much more efficient in financing, than the results of the SPT method. on the calculation result get foundation size D = 45 cm for planning use method, whereas for planning using CPT method obtained size of foundation size D = 50 cm, with the same depth of 15m and the number of the same post that is 76 post.
Analisis Pengaruh Daya Dukung Tanah Terhadap Indek Tebal Perkerasan Jalan Menggunakan Metode Bina Marga Rene Clinton da Costa Soares; Putu Budiarnaya
Jurnal Ilmiah Telsinas Vol 3 No 1 (2020)
Publisher : Universitas Pendidikan Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (811.108 KB)

Abstract

The carrying capacity of the subgrade in road construction is one of the factors that is very instrumental in determining the strength of the construction of the road. The carrying capacity of subgrade is strongly influenced and determined from the CBR value of the soil. The carrying capacity of subgrade is obtained through the DDT and CBR correlation graphs. The greater the CBR value of subgrade in road construction and the greater the carrying capacity of the land from the road. The pavement thickness index (ITP) is a value that functions to determine the thickness of each pavement layer. The value of pavement thickness index will vary greatly and will greatly affect the amount of carrying capacity of the soil. The pavement thickness index is obtained through the relationship between the carrying capacity of the soil (DDT), Cross Equivalent Plan (LER) and regional factors (FR). This value is obtained through the nomogram that has been provided in the Highway Flexible Pavement Pavement Thickness Planning manual with the Bina marga component analysis method. This study aims to determine the relationship (correlation) between the carrying capacity of the soil with the value of the road pavement thickness index using the bina marga method and knowing how much influence the carrying capacity of the soil on the road pavement thickness index. From the analysis results obtained a comparison value of each value that has been determined through reading the Scatter diagram of the relationship between DDT and ITP. From the Scatter reading the relationship diagram (correlation) between the carrying capacity of the soil (DDT) and the pavement thickness index (ITP) is linear negative at all points of value, because the two relations run very strongly / negatively opposite because the correlation results (r = - 0.993909289 approaching - 1). Therefore, the greater the carrying capacity of the soil (DDT), the smaller the thickness of the pavement index produced or the greater the carrying capacity of the soil (DDT), the smaller the thickness of the resulting pavement layer. From the carrying capacity of the soil whose influence on the thickness of the pavement thickness is (ITP = - 0.6665.6.16 + 8.4222 = 4.31) the same for all research points.
Analisis Konstruksi Posisi Lightning Arrester di Gardu Distribusi Km 0003 Penyulang Subagan Wilayah Kerja PT PLN (Persero) ULP Karangasem I Made Sariana; I Made Asna; I Wayan Sugarayasa
Jurnal Ilmiah Telsinas Vol 3 No 1 (2020)
Publisher : Universitas Pendidikan Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (525.734 KB)

Abstract

One of the system distribution components is the substation distribution. Distribution substation connects the network to consumers. The most important components of a distribution substation is the transformer . Transformers often experience interference due to lightning strikes since the position is in the open air. During the period of time 2017 -2019 on feeder Subagan suffered disruption due to the impulse of lightning for 10 times. The study aim to discuss how the work of lightning arresters in protecting equipment with the construction of the old model and after made changes in the position , distance protection ideal lightning arrester to the transformer , performance lightning arrester after changes in position on the new construction , and the impact of differences in the construction of the installation of lightning arresters in ULP Karangasem . From the analysis , through the climate condition in the region of Karangasem, the maximum lightning distance protection arrester and the transformer is 6.2245 meters. Distance lightning of the old construction existing arrester and transformer was 1,5 meters. The distance that makes the current peak of lightning that is capable received from lightning arrester amounted to 178.3032 kA, so it can be concluded that the distance lightning arrester and transformer with long construction can work with the maximum. The new construction, according to SPLN D5.006 2013, the distance of lightning arrester and transformer in KM 0003 was 0.6 meters. The distance that makes the current peak of lightning that is capable received from lightning arrester is higher, namely 655.008 kA, and increase the performance of lightning arresters for 267.36 % due to changes in position.

Page 1 of 1 | Total Record : 6