cover
Contact Name
Muh. Nadzirin Anshari Nur
Contact Email
nadzirin@gmail.com
Phone
+6281342713802
Journal Mail Official
jurnal.elektroda@gmail.com
Editorial Address
Jl. H.E.A. Mokodompit, Kampus Baru Anduonouhu, Kendari, Sulawesi Tenggarai 93232 - Indonesia.
Location
Kota kendari,
Sulawesi tenggara
INDONESIA
Jurnal Fokus Elektroda (Energi Listrik, Telekomunikasi, Komputer, Elektronika dan Kendali)
Published by Universitas Halu Oleo
ISSN : 25025562     EISSN : 25025562     DOI : https://doi.org/10.33772/jfe.v7i3
Energi Listrik Telekomunikasi Komputer Elektronika dan Kendali Robotik Informatika Smart City Multimedia
Articles 12 Documents
Search results for , issue "Vol. 8 No. 1 (2023): Jurnal Fokus Elektroda Vol 8 No 1 2023" : 12 Documents clear
Analisis Potensi Pemanfaatan Energi Angin pada Kawasan Wisata Bukit Gua Jepang Kota Lhokseumawe Panji Aji Riha Wijayanto; Muhammad Daud; Adi Setiawan; Arnawan Hasibuan
Jurnal Fokus Elektroda : Energi Listrik, Telekomunikasi, Komputer, Elektronika dan Kendali) Vol. 8 No. 1 (2023): Jurnal Fokus Elektroda Vol 8 No 1 2023
Publisher : Jurusan Teknik Elektro Fakultas Teknik Universitas Halu Oleo

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1245.755 KB)

Abstract

In order to maintain energy security and independence due to the decline in fossil energy production, especially oil and gas, as well as the world's commitment to minimize greenhouse gas emissions, the Indonesian government continues to optimize the use of new and renewable energy. Aceh has a new renewable energy potential of 16,882 MW with a wind energy potential of 894 MW. This study aims to analyze the potential of wind energy in the tourist area of Bukit Goa Japan in Lhokseumawe, Aceh, to be used as a source of lighting energy in the area. Wind speed measurements were carried out at 08:30 AM to 08:00 PM. Time interval of data collection every half hour at a height of three meters and five meters from the ground directly and by installing a wind turbine with a maximum power capacity of 400 W. The results showed that the Bukit Goa tourist area in Japan has an average daily wind speed of 0. 7 m/s which has the potential to produce an average electric power of 8.9 W when using a three-blade wind turbine at a height of three meters from the ground, with peak power obtained at 11:30 AM which is 13.33 watts. Meanwhile, wind turbines that use five blades do not produce any power at all. Meanwhile, at a height of five meters the daily average wind speed is 0.63 m/s which has the potential to generate a power of 9.98 W with the peak power obtained at 01:00 PM which is 14.85 W.
Deteksi dan Segmentasi Gangguan pada Jaringan Transmisi Listrik berbasis Hilbert Transform Mustarum Musaruddin
Jurnal Fokus Elektroda : Energi Listrik, Telekomunikasi, Komputer, Elektronika dan Kendali) Vol. 8 No. 1 (2023): Jurnal Fokus Elektroda Vol 8 No 1 2023
Publisher : Jurusan Teknik Elektro Fakultas Teknik Universitas Halu Oleo

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1396.078 KB)

Abstract

Tujuan dari paper ini ialah untuk mengembangkan sebuah tehnik deteksi dan segmentasi gangguan pada sistem transmisi listrik berdasarkan teknik transformasi Hilbert. Deteksi dan segmentasi gangguan merupakan tahap pra-pemrosesan penting yang diperlukan untuk analisis otomatis pada saluran transmisi. Teknik yang diusulkan telah diuji dengan menggunakan data gangguan praktis untuk pemodelan sistem transmisi dengan berbagai jenis gangguan, resistansi gangguan, dan lokasi gangguan. Hasilnya menunjukkan bahwa teknik deteksi dan segmentasi gangguan Hilbert mencapai deteksi yang dapat diandalkan untuk sinyal arus dan tegangan tiga fasa pada segmen sinyal stasioner pra-gangguan, gangguan, dan setelah gangguan dengan tingkat akurasi yang baik.

Page 2 of 2 | Total Record : 12