cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota adm. jakarta selatan,
Dki jakarta
INDONESIA
Prima Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir
ISSN : -     EISSN : -     DOI : -
Core Subject : Science,
Jurnal Prima Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir, Jurnal ilmiah diterbitkan oleh Pusat Rekayasa Perangkat Nuklir - BATAN Alamat Rekaksi: Pusat Rekayasa Perangkat Nuklir (PRPN) - BATAN
Arjuna Subject : -
Articles 9 Documents
Search results for , issue "Vol 8, No 2 (2011): Nopember 2011" : 9 Documents clear
REKONSTRUKSI KOORDINAT MENGGUNAKAN KOTAK REKONSTRUKSI DAN FOTO PROYEKSI SINAR-X Achmad Suntoro
PRIMA - Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir Vol 8, No 2 (2011): Nopember 2011
Publisher : BATAN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1174.731 KB)

Abstract

Some mathematical formula have been derived for a process of reconstruction to defi ne the coordinate of any point rel ati ve to a pre set coordi nate system. The process of reconstruction uses a reconstructi on box in whi ch each edge’s length of the box is known, each top-bottom face and left-right face of the box having a cross marker, and the top face and theright face of the box as pl ane projections by X-ray source i n perspective projection system. Using the data of the two X-ray proj ecti on images, any poi nt inside the recontruction box, as l ong as its proj ecti on i s recorded in the two photos, will be determi ned its coordinate relative to the midpoi nt of the reconstruction box as the central  poi nt coordinates Tel ah dit urunkan beberapa rumus matematik dalam proses rekonstruksi  koordinat sebuah titik rel atip terhadap sumbu koordi nat yang ditetapkan. Proses rekonstruksi menggunakan bantuan kotak rekonstruksi berbentuk balok yang panjang ti ap rusuknya diketahui, tiap sisi atas-bawah dan sisi kiri-kanan kotak diberi marker si lang, serta  sisi-atas dan sisi-samping kanan kotak merupakan bidang proyeksi ol eh sinar-X dal am sistem proyeksi  perspektif. Dengan menggunakan data dua foto proyeksi sinar-X, seiap titi k di dalam kotak rekonstruksi yang proyeksi nya terekam pada kedua foto proyeksi  akan dapat ditentukankoordinatnya relati p terhadap ti ti k tengah kotak rekonstruksi sebagai  titik pusat koordinat.
PEMILIHAN STRUKTUR PONDASI PADA GEDUNG PABRIK BAHAN BAKAR NUKLIR Hasriyasti Saptowati; Utomo Utomo
PRIMA - Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir Vol 8, No 2 (2011): Nopember 2011
Publisher : BATAN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (668.054 KB)

Abstract

ELECTORAL STRUCTURE OF BUILDING FOUNDATIONS IN NUCLEAR FUEL ELEMENT PLANT. Pl ant structures of nucl ear fuel  el ements have a substanti al  burden. This requires analysis of the selecti on of the proper foundation for buildi ng support for a variety of different soil conditions found i n two locati ons, first at a l ocation near the nucl ear power pl ant i n Jepara and the second location BATAN Serpong area. Expected to know the location of soil condi ti ons, we can determined the type of foundation that will be used based on the criteria requirements of the building PEMILIHAN STRUKTUR PONDASI PADA GEDUNG PABRIK ELEMEN BAHAN BAKAR NUKLIR. Struktur bangunan pabrik el emen bahan bakar nuklir mempunyai  beban yang cukup besar. Untuk it u diperlukan anali sa pemilihan jeni s pondasi yang tepat sebagai penopang bangunan untuk berbagai kondisi tanah berbeda yang terdapat di dua lokasi,  lokasi  pertama didekat PLTN Jepara dan l okasi kedua di kawasan BATAN Serpong. Diharapkan dengan mengetahui kondisi tanah lokasi, kita dapat menentukan  j enis pondasi yang akan digunakan berdasarkan criteria persyaratan bangunan gedung.
PEREKAYASAAN SISTEM DETEKSI PERANGKAT SCINTIGRAPHY MENGGUNAKAN PSPMT Wiranto Budi Santoso; Leli Yuniarsari
PRIMA - Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir Vol 8, No 2 (2011): Nopember 2011
Publisher : BATAN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (933.946 KB)

Abstract

THE ENGINEERING OF A SCINTIGRAPHY EQUIPMENT DETECTION SYSTEMUSING PSPMT. The engi neering of sci ntigraphy equipment detection  system usi ng PSPMT has been conducted. A scintigraphy equipment i s used for imagi ng small organs. The equipment is a mini gamma camera. The function of the equi pment to provide images of metboli sm processn a body organ. The result of the equipment can be used to diagnose an il lness. The function of scintigraphy equipment detection system is  detecti ng incomi ng radiati on from body organs. The ncoming radi ati ons are converted to photons by a scintillati on crystal in the scinti graphyequipment detection system.  Then, photons are multiplied by Photo Multipl ier Tube (PMT) and are converted to be el ectrical si gnals. It needs a l ot of PMT to detect a locati on of incoming radiation from a body organ. Using PSPMT (Posi tion Sensitive PMT) which sensiti ve to positi onof incomi ng radiation, it  needs only one PSPMT.  From this activity, it can be concluded that PSPMT can be used for  scintigraphy equipment  etection system. Usi ng PSPMT, the dimension of scintigraphy equi pment detection system can be reduced. Although the scintigraphy equipment detection system i s only suit able for imagi ng small organs. PEREKAYASAAN SISTEM DETEKSI PERANGKAT SCINTIGRAPHY MENGGUNAKAN PSPMT. Telah dilakukan perekayasaan sistem deteksi  perangkat scintigraphy menggunakan PSPMT. Perangkat scintigraphy merupakan perangkat untuk pencitraan organ tubuh berukuran kecil . Perangkat i ni  merupakan kamera gamma dalam bentuk mini. Perangkat ini berfungsi untuk menghasilkan citra proses metabolisme suatu organ tubuh. Keluaran dari perangkat ini digunakan untuk diagnosis suatu penyakit. Sistem deteksi  perangkat scintigraphy berfungsi untuk mendeteksi radiasi dari organ tubuh. Radiasi yang datang akan diubah menjadi  foton oleh kristal  sintilasi yang terdapat pada sistem deteksi  perangkat scinti graphy. Kemudian foton tesebut akan digandakan ol eh tabung  pengganda foton (Photo Multipl ier Tube – PMT) dan diubah menj adi sinyal listrik. Diperlukan banyak PMT untuk  mendeteksi lokasi datangnya radi asi  dari  organ tubuh. Dengan menggunakan PSPMT (Posi ti on Sensiti ve PMT) yang sensitif terhadap posisi datangnya radiasi, hanya diperl ukan satu PSPMT. Dari kegiatan yang di lakukan dapat disimpul kan bahwa sistem deteksi perangkat scinti graphy dapat menggunakan PSPMT. Dengan menggunakan PSPMT, dimensi sistem deteksi perangkat scintigraphy dapat diperkecil . Namun sistem deteksi hanya cocok di  unakan untuk mencitrakan organ yang kecil.
MANAJEMEN RENCANA KEGIATAN PERSIAPAN PEMBANGUNAN PLTN DI INDONESIA Utomo Utomo
PRIMA - Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir Vol 8, No 2 (2011): Nopember 2011
Publisher : BATAN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (646.233 KB)

Abstract

A feasibi lity Study that has been updated show that two nuclear power uni ts wi th eachuni t of power up to  lOOOMWe can represent decently an economical  alternative energy supply.It added that the available time schedul e was quite tight so that the preparation for thedevelopment must be starti ng  first.   Thi s paper will  discuss the preparati on of plans of the firstnuclear power plant whi ch includes program activiti es, the structure of contracts, schedules of activities and funding. From the information obtai ned to date that in addition to a candidate site that is ready to be buil t in Muria peni nsula i s  sti ll  required another  potential al ternative site besides  to search other  compl ete data information. This sit e i nvestigation activi ties completed wi thin the time schedule was passed "critical path", so that these acti vi ti es should be carried outi ntensively and obey the time.  This paper describes the steps that need to be prepared to welcome the first nucl ear power plant, after reviewi ng the various input above and apply the reality in Indonesi a as the i nitial condi tions. Studi  Kelayakan yang telah dimutakhirkan menunj ukkan bahwa dua unit PLTN dengan daya unit masi ng-masing sampai lOOOMWe dapat merupakan alternatif penyediaan energi yang ekonomis, dan layak. Di sebutkan pula bahwa jadwal waktu yang tersedia cukup padat sehi ngga persiapan menjelang diawal inya pembangunan harus di mulai  dari sekarang.Dalam makalah  i ni akan dibahas  rencana kegiatan persiapan pembangunan PLTN yang pertama meli puti program kegiatan, struktur kontrak, jadwal kegi atan dan pendanaan .Dari informasi  yang telah diperol eh sampai saat i ni  bahwa selain cal on tapak yang sudah si ap dibangun  di semenanjung Muria masi h di perlukan tapak alternative yang potensial  di samping mel engkapi  pencarian data informasi  l ai nnya. Kegiatan merampungkan penyeli di kan tapak ini di dalam adwal waktu ternyata melewati "criti cal path", sehi ngga kegi atan i ni  harus dilaksanakan secara ntensif dan taat waktu. Makalah  ini menguraikan langkah-langkah yang perlu di siapkan  dalam menyongsong  pembangunan PLTN pertama  , setel ah menelaah berbagai  masukan di atas dan menerapkan kenyataan di Indonesia sebagai kondi si awalnya.
KAJIAN KI NERJA SISTEM DETEKSI ANTARA DETEKTOR NaI(Tl) DAN CsI(Tl) UNTUK PERANGKAT RENOGRAF PORTABEL JINJING Joko Sumanto; Sigit Bachtiar; Abdul Jalil
PRIMA - Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir Vol 8, No 2 (2011): Nopember 2011
Publisher : BATAN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1648.223 KB)

Abstract

PERFORMANCE REVIEW OF DETECTORS DETECTION SYSTEM NaI (Tl) andCSI (Tl) DEVICE FOR RENOGRAPH PORTABLE TOTE. Performance revi ew has been conducted  between the detector NaI(Tl)  detection  systems  and portabl e  renograph CsI(Tl)  for portable devices.  This activity is i ntended to replace a smaller detection system,  so the device becomes easy  renograph  in tote. The method used is the study of literature and compare the performance of  detection systems, including measurement  of work stress, resol ution  and detector efficiency Na(Tl)2x2<sup>”/<sup>-PMT and CsI(Tl)1x1<sup>”/<sup>PMT and photodiode detector. The  study results showed that the NaI(Tl)2x2<sup>”/<sup>  detectors provide greater effici ency and resoluti on is quite good compared to the detector CSI. Thus CSI small er detector can not repl ace NaI(Tl)2x2<sup>”/<sup>  detector on the device renograph. KAJIAN KINERJA SISTEM DETEKSI ANTARA DETEKTOR NaI(Tl) DAN CsI(Tl )UNTUK PERANGKAT RENOGRAF PORTABEL JINJING. Telah di lakukan kaji an kinerja sistem deteksi antara detektor NaI(Tl) dan CsI(Tl) untuk perangkat renograf portabel jinjing.  Kegi atan i ni  dimaksudkan untuk menggantikan si stem deteksi yang lebi h kecil, sehingga perangkat renograf menjadi mudah di jinji ng. Metoda yang digunakan adalah dengan studi lit eratur dan membandingkan kinerj a si stem deteksi yang meli puti pengukuran tegangan kerja, resolusi dan efisi ensi detektor NaI(Tl) 2x2<sup>”/<sup> PMT dan detektor CsI(Tl)1x1<sup>”/<sup> PMT dan photodi ode. Hasi l kajian menunjukkan bahwa detektor NaI(Tl) 2x2” memberikan efisi ensi yang lebih besar dan resolusi yang cukup baik dibandingkan dengan detektor CsI(Tl) 1x1<sup>”/<sup>.  Dengan demiki an detektor CsI(Tl ) yang lebih kecil belum bisa mengggantikan detektor NaI(Tl) 2x2<sup>”/<sup> pada perangkat renograf.
ANALISIS TEGANGAN TINGGI PADA PESAWAT SINAR-X Sujatno Sujatno; Sigit Bachtiar
PRIMA - Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir Vol 8, No 2 (2011): Nopember 2011
Publisher : BATAN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (531.512 KB)

Abstract

ANANALYSIS OF HIGH VOLTAGE X-RAY, It has been done an analysis of the hi gh voltage  X-ray. The objective was to determi ne the characteristics and constructi on used as a generator.A tools that  used to generate a high voltage alternating low-frequency is a transformer. The high voltage transformer has  a secunder windi ngs  greater than a primer windings, so  the voltage that be  generated can reach several hundred thousand vol ts (30 kV-500 kV). To be efficient and economical,  for a high voltage 100 kV i s used several  transformers are constructed i n seri es that called a cascade. The hi gh voltage that is generated then be rectifi ed as a worki ng voltage on the tube X-rays.  Thi s vol tage will accel erate the movement of electronsproduced by the fil ament in the tube, the ki neti c energy of el ectrons  is used to strike the anode, thus producing X-rays. ANALISIS TEGANGAN TINGGI PADA PESAWAT SINAR-X, Telah dilakukan analisis terhadap tegangan tinggi  pesawat sinar-X. Tuj uannya adal ah untuk mengetahui karakteristik dan konstruksi yang digunakan sebagai pembangkit. Alat yang digunakan untuk membangkitkan tegangan ti nggi bolak bal ik frekuensi rendah i al ah sebuah transformator. Transformator tegangan ti nggi mempunyai perbandingan j uml ah lili tan sekunder  lebi h besar daripada primernya sehi ngga  tegangan yang dihasilkan dapat mencapai beberapa ratus ri bu Vol t (30 kV-500 kV).  Agar efisi en dan ekonomis maka untuk tegangan ti nggi  di atas 100 kV digunakan beberapa trafo yang diseri yang di sebut dengan model kaskade. Tegangan ti nggi yang dihasil kan trafo kemudi an disearahkan dan di catukan pada tabung sinar-X. Tegangan ini akan mempercepat gerak elektron yang dihasilkan oleh fil amen di dal am tabung,  energi  kinetik elektron  di gunakan untuk menumbuk anoda, sehi ngga menghasilkan si nar-X.
ANALISIS KESEIMBANGAN KONSTRUKSI PESAWAT TDS BRAKITERAPI MEDIUM DOSE RATE Bandi Parapak
PRIMA - Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir Vol 8, No 2 (2011): Nopember 2011
Publisher : BATAN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (583.326 KB)

Abstract

CONS TRUCTION BALANCE ANALYSIS OF DOSE RATE MEDIUM BRACHYTHERAPY TDS . One of the most important part of brachytherapy instrument  design activities i s anal yze by  determi ni ng the centroi d point of construction in order to mai ntai n the bal ance of brachytherapyi nstrument, either duri ng operation as well  as when transported.  Operation of brachytherapy is not onl y done i n one place so it  is necessary to balance the analysis of the forces at the time did not move, moved on the horizontal floor and slopi ng floor. Calcul ation approach who is done to calcul ate the weight of mechanical components on each module, and then calculate the centroi d of each module, for the balance of forces analysis performed with the assumpti on at the time of brachytherapy in the posi ti on of not movi ng on a horizontal  fl oor, moved from a pl ace to another on the horizontal floor and on the fl oor with sloping angl e 30 0 . Base on the resul ts of this anal ysi s are expected to bal ance the four wheels can move wi thout sli pping at the time of decline or incline . Also, resul ts of analysis can be used i n desi gning a mobile constructi on brachytherapy taking into considerati on the aestheti c ideal, easy to operate, ensure the safety  of equi pment,  Operator and patient. ANALISIS KESEIMBANGAN KONSTRUKSI PESAWAT TDS BRAKITERAPI MEDIUM  DOSE RATE.  Sal ah satu bagi an terpenting dal am kegiatan rancang bangun pesawat brakiterapi adalah mel akukan analisis dengan menentukan tit ik pusat berat guna menjaga keseimbangan konstruksi brakiterapi , baik pada saat beroperasi maupun pada saat dipindah-pindahkan. Pengoperasian braki terapi  tidak saja dilakukan pada satu tempat saj a sehi ngga sangat perlu dilakukan analisi s kesei mbangan gaya-gaya pada saat ti dak bergerak, di pi ndahkan pada lantai  datar dan l antai miring. Pendekatan perhi tungan yang dilakukan adalah  menghitung berat komponen-komponen mekanik pada masing-masi ng modul. Setel ah itu titi k berat masi ngmasi ng modul  di hi tung. Untuk analisis keseimbangan gaya-gaya di lakukan dengan asumsi pada saat brakiterapi dalam posisi ti dak bergerak pada lantai  datar, dipindahkan dari suatu  tempat ke tempat yang lai n pada lantai datar dan pada lantai dengan sudut kemiri ngan 30 hasil analisis ini  diharapkan keseimbangan keempat roda dapat bergerak tanpa tergelincir padasaat menurun  maupun tanjakan. Selai n i tu hasil  anali sis ini dapat digunakan dal am merancang konstruksi brakit erapi  secara mobile dengan mempertimbangkan faktor estetika yang ideal , mudah di operasi kan, menj ami n keamanan alat, operator dan pasien. 0 . Dari  hasil analisis ini  diharapkan keseimbangan keempat roda dapat bergerak tanpa tergelincir pada saat menurun maupun tanjakan. Selai n i tu hasil  anali sis ini dapat digunakan dal am merancang konstruksi brakit erapi  secara mobile dengan mempertimbangkan faktor estetika yang ideal , mudah di operasi kan, menj ami n keamanan alat, operator dan pasien.
PEREKAYASAAN HEAT EXCHANGER SEBAGAI PEMANAS UMPAN UF 6 DALAM PABRIK ELEMEN BAKAR NUKLIR Petrus Zacharias; Marliyadi Pancoko
PRIMA - Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir Vol 8, No 2 (2011): Nopember 2011
Publisher : BATAN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (666.357 KB)

Abstract

DESIGN OF HEAT EXCHANGER FOR HEATING UF<sub>6</sub> FEED IN NUCLEAR FUEL ELEMENT PLANT. The process of conversion of UF<sub>6</sub>  to  UO  through Integrated Dry Route (IDR) i s done in a rotary kiln reactor. There are two stages of initi al  treatment / conditioni ng before inserting the UF <sub>6</sub>  in to the reactor :  changing UF<sub>6</sub> 2  solid into the gas phase at a temperature of 60°C in an evaporator, and then, raising the temperature of UF C to 290<sup>0</sup> C i n a Heat Exchanger (HE). Therefore it i s necessary to desi gn a HE for heating UF gas by determination / calculation of  HE speci ficati ons as a heater. The steps  activities of determining the speci fi cati ons of HE i n the followi ng sequence: determining  the value of theheat load Q, determining the approxi mate dimensions of the Heat  xchanger, determining the dimensions / speci fications corrected Heat Exchanger, HE pressure drop calculation. The result of  thi s design  specification is a type of hai rpi n double pipe HE wi th a l ength of 12 ft, 2 x 1 ¼ IPS. Pipe material is Inconel (alloy -600) that is resistant to UF, HF, and Steam. Annul us material is carbon steel. Pressure drop in  annul us is   0.0004 psi, and in i nner pipe is 0.042 psi .  Heat Exchanger with specs li ke thi s can functi on as UF 290 <sup>0</sup> C.  gas from 60  gas heater so that the temperature be 290<sup>0</sup>PEREKAYASAAN HEAT EXCHANGER SEBAGAI PEMANAS UMPAN UF  DALAMPABRIK ELEMEN BAKAR NUKLIR . Proses konversi UF<sub>6</sub>-UO melalui  Jalur Kering mTerintegrasi (JKT) dilakukan dalam reaktor rotary kil n. Ada dua tahapan perlakuan/pengkondisian awal sebel um umpan UF<sub>6</sub> 2  dimasukkan ke reaktor, yaitu pertama, mengubah UF<sub>6</sub>  padat menjadi  fase gas suhu 60<sup>0</sup>C dalam sebuah evaporator, kemudian kedua menaikkan suhu UF<sub>6</sub>  gas dari 60<sup>0</sup> C menjadi 290<sup>0</sup> C dalam sebuah Heat Exchanger (HE). Oleh karena i tu perlu didesain sebuah HE yang berfungsi sebagai pemanas umpan UF  gas.  Kegiatan  desain  HE ini  berupa penentuan/perhitungan  spesifikasi  HE sebagai pemanas.   Langkah-langkah kegiatan penentuan spesifikasi HE mengikuti  urutan sebagai berikut : menentukan ni lai beban panas Q, menentukan perki raan di mensi  Heat Exchanger,  menentukan  di mensi /spesifikasi  terkoreksi  Heat Exchanger, dan menghi tung pressure drop  HE. Spesifikasi HE yang dihasilkan  adalah Jenis  double pipe HE hairpin dengan panj ang 12 ft,  , HF, dan Steam. Annulus terbuat dari baja karbon. Penurunan tekanan dal am annulus sebesar 0,0004 psi, dan dalam pipa 0,042 psi. Heat Exchanger  dengan spesi fikasi sepert ini  dapat di fungsikan sebagai  pemanas UF 2 x 1 ¼ IPS. Material  pi pa adalah Inconel ( alloy -600) yang tahan terhadap UF <sub>6</sub> gas sehi ngga suhunya nai k dari  60<sup>0</sup> C menj adi 290<sup>0</sup> C.
ANALISIS PERHITUNGAN KETEBALAN PERISAI RADIASI PERANGKAT RIA IP10. Benar Bukit; Kristiyanti Kristiyanti; Hari Nurcahyadi
PRIMA - Aplikasi dan Rekayasa dalam Bidang Iptek Nuklir Vol 8, No 2 (2011): Nopember 2011
Publisher : BATAN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (703.136 KB)

Abstract

CALCULATION ANALYSIS  OF THE  THICKNESS  OF RADIATION SHIELD FORTHE RIA EQUIPMENT IP10. Calculation Anal ysis has been performed on the thickness of radiation shield for the design of the Radioi mmunoassay (RIA)  IP10 counters using five detectors arranged in parall el . The calculati on is intended to ensure that the radiati on on each detector does not i nfluence each other. The radiation shield i s made of lead. The cal culation of lead thickness  was based on the principle of the l ead plates absorptive power toward  the gamma ray of a certain  energy, whi ch is the function of l inear  absorption coefficient and the material thickness. Assuming the use of Iodium-125(I-125) source with an  activity 10 µCi,  and  expecting an absorptive power of 95%, calculations showed that the required   lead thickness is equal  to  0,013 cm. Since  lead is  soft and its avail ability in the market i s limited, lead plate of 2 mm thickness are used instead, so that counti ng result for the detectors do not infl uenceeach other. ANALISIS PERHITUNGAN KETEBALAN PERISAI RADIASI PERANGKAT RIA IP10. Telah dilakukan analisis perhitungan  ketebalan perisai radiasi pada perancangan perangkat pencacah Radi oi mmunoassay (RIA) IP10 menggunakan 5 buah detektor yang disusun secara berjajar. Perhitungan dimaksudkan agar paparan radiasi yang diterima masing-masi ng detektor ti dak saling mempengaruhi. Perisai radiasi terbuat dari  pelat ti mbal (Pb). Perhi tungan  tebal  pelat timbal berdasarkan prinsip Daya Serap (DS) radiasi pelat Pb terhadap pancaran sinar   pada energi  tertentu, merupakan  fungsi dari koefi sien linier dan tebal dari bahan. Hasil  perhitungan dengan asumsi sumber radioisotop yang digunakan Iodium-125 (I-125)  dengan akti vi tas 10 µCi dan  DS yang diharapkan 95% didapatkan tebal Pb sama dengan 0,013 cm. Dengan mengingat sifat pel at Pb yang lunak dan ketersediaan ketebalan di pasaran   terbatas, maka digunakan pelat Pb tebal 2 mm, sehingga pengukuran cacahan tidak saling mempengaruhi.

Page 1 of 1 | Total Record : 9