Claim Missing Document
Check
Articles

Found 6 Documents
Search

Pengembangan Aplikasi Pembelajaran Interaktif Mata Pelajaran IPA Di SD Negeri Pasirsari 01 Afiyah, Neni Nur; Sasongko, Ananto Tri; Rahardjo, Sugeng Budi
Jurnal Teknologi Dan Sistem Informasi Bisnis Vol 6 No 1 (2024): Januari 2024
Publisher : Prodi Sistem Informasi Universitas Dharma Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47233/jteksis.v6i1.1134

Abstract

SD Negeri Pasirsari 01 is a school located in South Cikarang District, Bekasi Regency. The learning media used by teachers in teaching science subjects (human respiratory system) still use textbooks and student worksheets (LKS) as guidelines because it is still difficult to develop new media that is more interactive. The results of the questionnaire using the Likert scale showed that 91.42% of students tended to be less interested in the science learning model. With this, it is necessary to design an android-based human respiratory system learning media. The method used is Research & Development with the Multimedia Development Life Cycle (MDLC) model. After being implemented and then tested using a questionnaire student response to the application with the results of the questionnaire using a Likert scale showing 37.14% of students tended to be less interested in the science learning model, it can be concluded that 54.28% of students liked science lessons.
Efisisiensi Biaya Listrik Dengan Penerapan Lean Six Sigma (Studi Kasus di PT X di Cikarang) Rahardjo, Sugeng Budi; Andriani, Andriani
JURNAL TEKNIK INDUSTRI Vol. 1 No. 2 (2020): JURNAL TEKNIK INDUSTRI : NOVEMBER 2020
Publisher : DPPM UNIVERSITAS PELITA BANGSA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (893.495 KB)

Abstract

PT X is a manufacturing company located in the Ejip industrial area, each month using an average of 950 KWH of electricity every month, where the electricity tariff in the area is 10% more expensive per KWH than using PLN. The ratio of electricity costs to turnover averaged 4 - 5% each month, this was very burdensome, so a project was created with the hope of a decrease of Rp. 200 million every month. The method used is Lean Six Sigma, where the project is carried out for 3 months. From the results of implementing Six Sigma, the company can find out the dominant cause and from the project costs can be reduced by 9% or 83 KWH every month.
Perancangan Soto Dandori Spare Parts System dan Hydraulic Tools untuk Reduce MTTR dan Efesiensi Man Power Widya, Adi Rusdi; Rahardjo, Sugeng Budi
JURNAL TEKNIK INDUSTRI Vol. 2 No. 2 (2021): JURNAL TEKNIK INDUSTRI : NOVEMBER 2021
Publisher : DPPM UNIVERSITAS PELITA BANGSA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1067.772 KB)

Abstract

The design and development in maintenance systems and machine maintenance in the manufacturing industry is still required to ensure that production processes are not disrupted and hamper established businesses. The maintenance system created and implemented is able to provide an alternative as a treatment that can reduce the cost of using the spars machine and can be an efficient and low cost system. Dandory system provides ready parts when replacing damaged machine components, so that machine repair time is faster in replacement, the use of tools made in replacing machine components can reduce and avoid potential accidents at work, so that the system used can reduce manpower and repair time, the result of design and development of tools as well as the use of dandory system can reduce the MTTR value by 52% and the use of manpower while repairing the engine is 1 man power.
Penerapan Metode Reliability Centered Maintenance (RCM) dan Fault Tree Analyze (FTA) Pada Mesin Cetak Lembar [Studi Kasus Percetakan XYZ Di Cikarang] Rahardjo, Sugeng Budi; Widya, Adi Rusdi
JURNAL TEKNIK INDUSTRI Vol. 2 No. 2 (2021): JURNAL TEKNIK INDUSTRI : NOVEMBER 2021
Publisher : DPPM UNIVERSITAS PELITA BANGSA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (820.553 KB)

Abstract

The technological disruptions that have occurred over the past few decades have inevitably affected the printing industry especially the mass media printing industry. Print media with products such as: Books, Magazines, Newspapers, Tabloids, will definitely be affected. The product was eliminated by digital media, not to mention, the covid pandemic that occurred in the last two years also triggered a sharp decline in the media business. The eight-color KBA machine, which is the focus of this research, is a ten-year-old machine with excellent printing capabilities, namely high capacity, 4-color alternating printing capability, and automatic machine control. Deteriorating machine life, as well as maintenance, functional audits and upgrades are key factors. Problems that often arise are print units, infeed, and control units, resulting in downtime and delays in the production process so that machine performance becomes less effective. The purpose of this research is to determine the maintenance interval schedule and find out the maintenance actions or activities that need to be carried out. To overcome the problem in this study using the method of Reliability Centered Maintenance (RCM), Fault Tree Analysis (FTA) with the calculation of Failure Modes and Effects Analyze (FMEA). RCM is defined as the process used to determine what must be done for machine maintenance, while FMEA is defined as the method for identifying the highest form of failure for each machine fault that occurs. From the calculation results using FMEA, FTA and RCM obtained the maintenance interval results on the Cylinder Section components with a maintenance interval of 10.58 hours.
Penerapan Spare Parts Inventory Management System berdasarkan Klasifikasi VESO dan RECOM untuk mengurangi searching time pada perusahaan manufaktur komponen otomotif Widya, Adi Rusdi; Rahardjo, Sugeng Budi
JURNAL TEKNIK INDUSTRI Vol. 3 No. 1 (2022): JURNAL TEKNIK INDUSTRI : MEI 2022
Publisher : DPPM UNIVERSITAS PELITA BANGSA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1625.186 KB) | DOI: 10.37366/JUTIN0301.2632

Abstract

Spare parts components are important to be managed properly, if the availability of spare parts is not considered it can cause production machines to stop operating. This is a consideration by the company to manage spare parts that can be controlled properly. The large number of machine components that vary with different types and types of machines causes the spare part controller to be able to arrange, give names, signs and labels, and store them to make it easier to search for these parts when needed for the process of replacing damaged parts. The parts availability management system requires data needs based on the type & type of machine, uniformity in mentioning the names of parts, functions and forms. Before the implementation of the parts keeper management system, it takes 35 minutes to find and get the parts needed. By applying the VESO and ROCEM classification methods, it can help in grouping, storing, and assisting in making component naming standards and determining how many parts are needed on an ROP basis. This system can help the search time for machining parts to be 16 minutes so that there is a reduction in service time in the need for these parts by 54% faster than the system before spare part management was carried out.
Pengendalian Kualitas UMKM Bagus Bakery dengan Mengunakan Metode Seven Tools Suwarno, Agus; Rahardjo, Sugeng Budi
JURNAL TEKNIK INDUSTRI Vol. 3 No. 1 (2022): JURNAL TEKNIK INDUSTRI : MEI 2022
Publisher : DPPM UNIVERSITAS PELITA BANGSA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (791.294 KB) | DOI: 10.37366/JUTIN0301.5965

Abstract

Quality is the most important factor for a product. The failure rate in the production process that is not in accordance with predetermined standards is a measure of the quality and effectiveness of production. Likewise for the production of UMKM Bagus Bakery which has a production failure rate or NG product of 184 of the total production of 4610 pieces or 3.99%. Based on fishbone diagram analysis, the causes of production process failure are material composition, unsanitary environment, oil temperature. The test results based on the seven tools method of overcoming bantet bread using fermipan to 10 grams and bread improver 15 grams, cleaning the equipment every time the dough is made, the oil temperature between 165~175 °C produces the smallest production failure value.