Penjadwalan Proyek Konstruksi Dengan Penerapan Simulasi Monte Carlo Dian Febrianti; Bambang Tripoli; Zakia Zakia; Rahmat Djamaluddin
Jurnal Teknik Sipil dan Teknologi Konstruksi Vol 7, No 1 (2021): Jurnal Teknik Sipil & Teknologi Konstruksi
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (453.309 KB) | DOI: 10.35308/jts-utu.v7i1.3274

Abstract

 The scheduling method that is often used in project planning in a deterministic way is the CPM method, the PERT method. However, in reality, uncertainty is often found in project completion, in accordance with the characteristics of a construction project that has a high level of risk. One of the methods used to determine the estimated project time is the monte carlo simulation method. The monte carlo simulation is a statistical sampling technique used to estimate solutions to quantitative problems. The research was conducted on the construction project of the Public Service Center (PSC) building in Krueng Sabee District, Aceh Jaya Regency. The purpose of this study is to determine the probabilistic method of scheduling and to explain the application of the monte carlo method for scheduling. The data used in this study are secondary data in the form of interviews and project implementation time schedule (curve S). Based on the monte carlo simulation that has carried out the distribution of completion on a public service center building construction project, the minimum value of the total project duration is 86.40 days, the maximum value of the total project duration is 105 days, and the mean value is 96 days. So the project can be completed within 96 days of the 100 plan days. So it can be concluded that the project is completed 4 days faster than the 100 day plan. Based on the above explanation, the Monte Carlo simulation is not significant enough to reduce the project duration, so that more significant work can be added or overtime. Keywords— Scheduling, Probabilistic, Simulation, Monte Carlo
Analisis Kajian Putar Balik Arah (U-Turn) Pada Bukaan Median Terhadap Kemacetan Ruas Jalan (Studi Kasus : Ruas Jalan Simpang Empat Jeuram Sta 0+115 Arah Meulaboh – Tapak Tuan) Bambang Tripoli; Rachmat Sofyan; Meidia Refiyanni; Rahmat Djamaluddin; Wahyu Suryadi S
Jurnal Teknik Sipil dan Teknologi Konstruksi Vol 6, No 2 (2020): Jurnal Teknik Sipil & Teknologi Konstruksi
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (288.924 KB) | DOI: 10.35308/jts-utu.v6i2.2747

Abstract

ABSTRAKRuas jalan Meulaboh – Tapak Tuan pada Sta 0+115 (diambil dari titik Sta 0+000  Simpang Empat Jeuram) merupakan tipe jalan dua arah dan terbagi (menggunakan median dan median terbuka). Sehingga, untuk mengakomodir pergerakan lalu lintas dari wilayah Timur dan Barat Kota Jeuram, ruas jalan tersebut memiliki beberapa titik bukaan median yang memungkinkan kendaraan merubah arah perjalanan berupa gerakan putar balik arah atau di istilahkan sebagai gerakan u-turn. Dengan persoalan tersebut di atas, maka permasalahan yang diangkat dan juga yang menjadi tujuan dari penelitian analisis kajian putar balik arah (u-turn) pada bukaan median terhadap kemacetan ruas jalan adalah seberapa besar volume arus lalu lintas, kapasitas jalan, waktu tempuh dan tingkat pelayanan jalan (level of service) yang terjadi. Batasan penelitian dibatasi hanya pada ruas jalan Meulaboh – Tapak Tuan di Sta 0+115 yang berada di Kecamatan Kuala Kabupaten Nagan Raya sepanjang ± 460 meter tepatnya pada Simpang Peukan Jeuram depan SMP Negeri 2 Kuala. Pengamatan dilakukan selama 3 hari terdiri dari 2 pos pengamatan, setiap pos ditempatkan 3 orang operator/personil pengambilan data. Metode yang digunakan MKJI 1997 [1]. Berdasarkan hasil perhitungan, volume lalu lintas tertinggi terjadi pada hari Minggu 4.165 smp/jam sebelum terjalinnya kendaraan, setelah terjalin maupun tidak terjalin 4.139 smp/jam dengan rasio jalinan 0.67 smp/jam. Kapasitas jalan 4.485 smp/jam dari arah Meulaboh-Tapak Tuan dan dari arah Tapak Tuan-Meulaboh 4.650 smp/jam dengan waktu tempuh rata-rata antara 18 detik sampai 23 detik dengan kecepatan tempuh antara 19 km/jam sampai dengan 20 km/jam. Skala interval tingkat pelayanan jalan, dikategorikan posisi E yakni kondisi volume arus lalu lintas mendekati atau berada pada kapasitas, arus tidak stabil, kecepatan terkadang terhenti.
Kelayakan Finansial Fasilitas Parkir Pasar Aceh Berdasarkan Qanun Kota Banda Aceh Rahmat Djamaluddin; Edi Mawardi
Jurnal Teknik Sipil dan Teknologi Konstruksi Vol 4, No 1 (2018): Jurnal Teknik Sipil Dan Teknologi Konstruksi
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (358.582 KB) | DOI: 10.35308/jts-utu.v4i1.584

Abstract

Off Street Parking building  in Pasar Aceh Baru is one of the parking facilities available in the area. Withthe increase of visitors to Pasar Aceh Baru, the need for parking space is also increasing. In this case the authors want to analyze the feasibility in terms of finance based on parking rates using Qanun Banda Aceh City No. 4 year 2012. The objective of the study is to calculate the number of parking vehicles, vehicles accumulation and to see the financial feasibility level of the parking facilities based on Laws Banda Aceh city regulated by Qanun No. 4 year 2012, so the results obtained when the parking facility has a period of turnover point of payback (Payback Period). This study uses 3 methods, namely NPV, BCR and IRR and discount rate of 10%, 12%, 15% and 18%. From the data processing using 3 methods, resulted in Net Present Value (NPV) largest value is Rp. -3,853,539,000, - at 10% discount rate while the Benefit Cost Ratio (BCR) is 0,809 at discount rate 10% and IRR value equal to -1,149%. This proves that with parking rates using Qanun Banda Aceh City No. 4 year 2012 the parking facilities are not feasible to be built financially. Keywords: Financial Feasibility, Parking Rates, NPV, BCR, and IRR
Penentuan Urutan Prioritas Pemeliharaan Bangunan SMA Bina Generasi Bangsa Meulaboh-Aceh Barat Edi Mawardi; Rahmat Djamaluddin
Jurnal Teknik Sipil dan Teknologi Konstruksi Vol 4, No 1 (2018): Jurnal Teknik Sipil Dan Teknologi Konstruksi
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (640.649 KB) | DOI: 10.35308/jts-utu.v4i1.585

Abstract

Building school as a means of education for the smooth process of teaching and learning. With the maintenance of poor buildings cause the various functions of building facilities decreases and affects the quality and comfort of building users. If the damage to building components is left then slowly the service life of the building will decrease. View function of High School building Bina Generasi Bangsa Meulaboh, then it should be this building gets good maintenance for the reliability and feasibility of buildings in the architecture, structure, and utilities remain awake and function optimally. The purpose of this research is to know the priority of building maintenance. The method of analysis used statistical methods and  Analytical Hierarcy Process (AHP). The result of analysis of priority sequence of maintenance of asitektur element can be first priority that is roof covering, while second priority on structural element that is column, beam and floor plate. While the utility element gets the twelfth priority and so on. Keywords         : School Building, Order of Maintenance, Analytical Hierarcy Process (AHP).
ANALISIS KARAKTERISTIK PARKIR KENDARAAN BERMOTOR Bambang Tripoli; Rahmat Djamaluddin
Jurnal Teknik Sipil dan Teknologi Konstruksi Vol 5, No 2 (2019): Jurnal Teknik Sipil dan Teknologi Konstruksi
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (346.565 KB) | DOI: 10.35308/jts-utu.v5i2.1390

Abstract

Parking problems are very important to study more deeply, because almost all activities in the open space require parking facilities. The required parking space must be adequately available. On street parking is parking that takes place along the road. This has a negative impact on the smooth flow of traffic, because it causes a reduction in the width of the road being traversed. The aim of the study was to determine the characteristics of motorized parking and the shape of parking angle patterns by considering the occurrence of side barriers. The research was carried out on the Singgah Mata I Road in Kuta Padang Village, West Aceh Regency, for 3 days Monday, Thursday and Sunday from 07.00-09.00 WIB, 11.00-13.00 WIB until 15.00-17.00 WIB. The data needed in the primary data research by direct survey in the research location, including side barriers survey, parking vehicle and road geometric. Data on the number of parking vehicles were analyzed to obtain parking characteristics, parking angle and side barriers. The highest peak fluctuations occur at 4:00 a.m. to 5:00 p.m., with evidenced parking capacity and HV vehicle parking time as much as 321 pcu/hour going on Monday, while the LV, MC and MT vehicles have the highest fluctuations on Sunday, which is detailed (LV 1519 pcu/hour) , (MC 600 pcu/hour) and (MT 311 pcu/hour). Based on this, the parking area of the vehicle's average daily peak volume is LV 1084 pcu/hour, HV 225 pcu/hour, MC 412 pcu/hour and for MT vehicles is 217 pcu/hour, able to accommodate the available parking volume, every point-point of the research location with parking index value <100%, which means that demand can still be fulfilled / still able to accommodate every vehicle parked with a parking angle of 300. The highest peak of side barriers occurs on Sunday 529 occurrence of side barriers which are evidenced by the condition of the commercial area with the second activity high side of the road. Keywords: on street parking, characteristics, parking impact.
EFEKTIFITAS KINERJA LAJUR KHUSUS SEPEDA DI KAWASAN KOTA MEULABOH Bambang Tripoli; Rahmat Djamaluddin
Jurnal Teknik Sipil dan Teknologi Konstruksi Vol 5, No 1 (2019): Jurnal Teknik Sipil Dan Teknologi Konstruksi
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (291.442 KB) | DOI: 10.35308/jts-utu.v5i1.1079

Abstract

The Meulaboh City Government under the leadership of the Regent H. T. Alaidinsyah (in the period of 2012 - 2017) has a high concern on the use of bicycles as an alternative transportation tool that is cheapand environmentally friendly because it can help reduce congestion, air pollution, and have a positive impact on the health of its riders. The application of special bicycle lanes can be applied but often private vehicles, motorbikes and rickshaws stop blocking the bicycle lane. The use of bicycle lanes for parking vehicles should not be allowed, so cyclists are forced to use dangerous sidewalks or public roads. The problems raised and also become the purpose of research are how much influence the performance of bicycle lanes specifically on the lane of motorized vehicles and the level of effectiveness of their use in the city of Meulaboh. The research boundary was at the data collection location on Tgk Chik Ditiro Street, Pocut Baren, Teuku Umar and Sudirman Street, which is in Johan Pahlawan Subdistrict, West Aceh District (Meulaboh), with a length of 1635 meters of bicycle lanes. The calculation uses the BLOS (Bicycle Level Of Service) method. Based on the results of the research on the Tgk Chik Ditiro road rating of BLOS 3.7 and Teuku Umar road, the rank rating of 4.3 is based on the BLOS < 4.5 value limitation rating, categorized as rank D with the BLOS description of the two road environments that are not feasible for cyclists. Jalan Pocut Baren value generated 3.1 < 3.5 set by BLOS, stated rating C with the  description  of the  environment  on the  road  segment  is  good  enough  for  cyclists.  Whereas  for Sudirman road the rating of 1.8 < 2.5 which was set by BLOS, was stated as rank B with the description of the environment on the road section was good for bicycles.
Pemanfaatan Sedimen Sungai dan Abu Batu Sebagai Bahan Pengisi Filler Pada Lapisan AC-WC Rahmat Djamaluddin; Andrisman Satria; Syafril Syafril
Jurnal Teknik Sipil dan Teknologi Konstruksi Vol 7, No 2 (2021): Jurnal Teknik Sipil & Teknologi Konstruksi
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35308/jts-utu.v7i2.7536

Abstract

Abstrak Penelitian ini menggunakan filler sedimen sungai dan batu dengan bahan pengikat aspal retona blend 55. Sedimen sungai dan abu batu merupakan partikel kasar, halus yang dapat digunakan sebagai bahan pengisi (filler) pada lapisan AC-WC. Penelitian ini bertujuan untuk mengetahui pengaruh penambahan filler sedimen sungai dan abu batu terhadap karakteristik marshall pada lapisan AC-WC sesuai spesifikasi Bina Marga 2018 Revisi 1 Divisi 6 menggunakan variasi filler75%:25% dengan kadar aspal optimum 5,5%. Berdasarkan hasil penelitian didapat nilai stabilitas 1086,188 kg, flow 3,4 mm, VIM 4,16%, VMA 16,13%, VFA 74,22%, MQ 316,72 kg/mm pada rendaman 30 menit, stabilitas 1011,608 kg, flow 3,6 mm VIM 4,62%, VMA 16,53%, VFA 72,06%, MQ 278,93kg/mm pada rendaman 24 jam, hasil yang diperoleh setiap variasi filler memenuhi syarat spesifikasi Bina Marga 2018. Nilai durabilitas memenuhi persyaratan yaitu > 90% dari stabilitas normal dengan hasil 93,13%. Hasil ini menunjukkan bahwa filler sedimen sungai dan abu batu bisa digunakan dalam lapisan AC-WC. Keywords: Marshall, sedimen sungai, abu batu, AC-WC, aspal retona blend 55
Perbandingan Gaya Geser Dasar Struktur Gedung Fix Base dengan Base Isolation Tipe High Damping Rubber Bearing (Studi kasus Modifikasi Gedung H Rumah Sakit Rujukan Regional Cut Nyak Dhien Meulaboh) Andrisman Satria; Rahmat Djamaluddin; Syafri Yosep Kurniawan
Jurnal Teknik Sipil dan Teknologi Konstruksi Vol 9, No 1 (2023): Jurnal Teknik Sipil dan Teknologi Konstruksi
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35308/jts-utu.v9i1.7537

Abstract

Abstract Aceh merupakan salah satu provinsi di Indonesia dengan instensitas kegempaan yang cukup tinggi sehingga kewaspadaan terkait kerusakan yang terjadi akan lebih besar baik ancaman jatuhnya korban jiwa serta kerusakan terhadap bangunan. Salah satu metode untuk mengurangi energi gempa yaitu dengan menambahkan seismic device pada bagman tertentu bangunan sesuai dengan fungsinya masing-masing. Salah satu sistem seismic device yang digunakan adalah menggunakan sistem isolasi dengan konsep memisahkan antara struktur bangunan bawah dengan bangunan struktur atas yaitu antara pondasi dengan kolom sehingga jika terjadi gempa, gaya yang diterima pondasi tidak langsung di terima oleh struktur kolom namun di redam oleh base isolation ini. Hasil analisis digunakan untuk mendesain gedung pada yang terletak di zona gempa kuat untuk daerah Aceh Barat dengan metode respons spektrum menggunakan software Etabs. Berdasarkan hasil perhitungan analisa struktur, gedung yang ditinjau menggunakan High Damping Rubber Bearing mengalami reduksi gaya geser pada struktur sebesar 16,44%.  Keywords:  Seismik, base isolation, Respons spektrum, HDRB, Software Etabs