Analisa Harga Satuan Pekerjaan Beton Bertulang Berdasarkan Analisa Pada Proyek Dan Analisa Harga Satuan Pekerjaan (AHSP) SNI 2016 Pada Proyek Pembangunan Aeon Mixed Use Project Phase II-Apartemen 3 Sentul City Bogor monika natalia; Fauna Adibroto; Desmon Hamid; Mafriyal Muluk; Rahma Dinna
Jurnal Ilmiah Rekayasa Sipil Vol 16 No 2 (2019): Edisi Oktober
Publisher : Pusat Penelitian dan Pengembangan Masyarakat (P3M), Politeknik Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (766.756 KB) | DOI: 10.30630/jirs.16.2.222

Abstract

Hasil analisa biaya pekerjaan beton bertulang pada kolom, balok, dan pelat lantai sesuai dengan analisa pihak kontraktor dengan menggunakan metoda Budgeted Cost of Work Performed didasarkan pada laporan harian proyek, estimasi pekerja dan alat yang digunakan sesuai dengan kondisi lapangan didapatkan Rp. 2.899.987.012,-. Hasil perhitungan estimasi biaya pekerjaan beton bertulang pada kolom, balok, dan pelat lantai dengan menggunakan metoda AHSP SNI 2016 menggunakan software Microsoft Excel didapatkan sebesar Rp.4.872.399.540,34,-. Selisih biaya total pekerjaan beton bertulang pada kolom, balok, dan pelat lantai kedua metode ini adalah sebesar Rp.1.972.412.528,-. Penggunaan estimasi biaya pihak kontraktor dengan menggunakan metoda Budgeted Cost of Work Performed didapatkan hasil yang lebih rendah dari pada analisa AHSP SNI 2016.
Analisa Investasi Pemilihan Hydraulic Exavator Dengan Pertimbangan Aspek Teknis Dan Ekonomis Yan Partawijaya; Desmon Hamid; M Mukhlis; Jajang Atmaja; Muhammad Faris F
Jurnal Ilmiah Rekayasa Sipil Vol 16 No 2 (2019): Edisi Oktober
Publisher : Pusat Penelitian dan Pengembangan Masyarakat (P3M), Politeknik Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (750.794 KB) | DOI: 10.30630/jirs.16.2.225

Abstract

The ownership of heavy equipment is one of the most interesting business at this time, because the indonesian government is actively developing infrastructure, mining, plantation and agriculture sectore. So, it will be very profitable to do this heavy equipment business if it followed an accurate investment analysis. In this research, researchers took a case study on analyzing the selection of hydraulic excavator from 5 different brands, its Komatsu, Hitachi, Caterpillar, Kobelco and Hyundai with 3 different classes (economical, medium and high mode).This research was conducted by collecting primary data (interviews and field surveys) and secondary data (previeos research journal and literature studies) as supporting data. Data processing with reference to Permen PU no.11/PRT/M/2013. Decision making analysis is based on calculation of Nett Present Value (NPV) method, Internal Rate of Return (IRR) method and Break Event Point (BEP) method. After conducting the research, researcher concludes as follows : in the economical class, researcher recommends CAT 313D2 to be invested for the purpose of being rented or used alone. In the medium class, researcher recommends Kobelco SK 200-10 to be invested for the purpose of being rented. In the high mode class, researcher recommends Kobelco SK 330 to be invested for the pupose of being rented. The recommendation that the researcher describes are not absolute decisions to be followed and only as a consideration for investors.