STUDI PERENCANAAN TANGGUL UNTUK PENGENDALI BANJIR SUNGAI PETAPAHAN KABUPATEN KUANTAN SINGINGI Chitra Hermawan
JURNAL PLANOLOGI DAN SIPIL (JPS) Vol 1 No 1 (2019): JPS Volume 1 Nomor 1, Februari 2019
Publisher : LEMBAGA PENELITIAN DAN PENGABDIAN KEPADA MASYARAKAT (LPPM)

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The Petapahan River is one of the rivers in Petapahan village which is prone to flooding that has an area of ​​89.23 km2 of watershed with a length of 16 km. Every flood incident due to overflow of the river has caused a significant risk flood such as almost 60 ha every year the fields are flooded, 143 houses are flooded, 56 km of national roads and roads are submerged in water. Planning flood control in the petapahan river can be done if the planned flood discharge in this river is known, so that the flood discharge can be designed to control the flood building in this study is the embankment. The embankment serves to hold flood discharge so that the overflow due to the petapahan river is expected to be the embankment, the embankment was designed using a flood discharge analysis plan using the HSS Gama I method using one rainfall post record, to calculate the hydraulic analysis using the Hec-Ras software in determining the river water profile, in calculating the embankment slope stability using the bishop method. The planned flood discharge analysis using the HSS Gama I method will produce a 25-year return flood discharge which is the basis for calculating the embankment dimensions, to calculate the overflowing water level on the river bank, then the 100 th re-flow of water is simulated into the hec-ras software. Based on the results of the calculation of the Hec-Ras application it is known that the water level that crosses a cliff is 150 cm. So for the construction of the flood retaining dike, the dimensions can be known as follows: Embankment height: 350 cm, Mercury width: 300 cm, Slope: 1: 2, Embankment Width: 500 cm From the calculation of Geo-Slope above for numerical Bishop Method Safety Factor > 1 which is 0.770 for granular soils which have a sliding angle of 33
ANALISIS PERHITUNGAN TRANSPORT SEDIMENT PADA HULU WADUK WONOGIRI Chitra Hermawan
JURNAL PLANOLOGI DAN SIPIL (JPS) Vol 2 No 1 (2020): JPS volume 2 Nomor 1, Februari 2020
Publisher : LEMBAGA PENELITIAN DAN PENGABDIAN KEPADA MASYARAKAT (LPPM)

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Dalam rangka melaksanakan kegiatan penataan sungai dan pembangunan prasarana pengendalian banjir dan untuk mendapatkan konstruksi yang layak sesuai dengan standar desain konstruksi yang berlaku, maka pekerjaan Survei, Investigasi Desain (SID) Sungai Bengawan Solo Hulu (Wonogiri-Jurug) sangat diperlukan guna pelaksanaan konstruksi selanjutnya, sehingga permasalahan banjir dapat segera diatasi. Maksud dari penelitian analisis sedimentasi adalah untuk melakukan investigasi dan pengumpulan data/informasi dalam mengenai sedimentasi yang masuk ke dalam sungai sehingga dapat dijadikan acuan bagi pengambil kebijakan yang dalam hal ini adalah pemerintah pusat melalui BBWS Bengawan Solo.Tujuan dari penelitian ini adalah mengidentifikasi sumber erosi dan analisa erosi lahan. Adapun metode yang digunakan dalam penelitian ini untuk melihat kondisi Hidrologi, Proses Erosi, Klasifikasi Erosi, Faktor-Faktor yang Mempengaruhi Erosi, Pendugaan Laju Erosi Berdasarkan Metode MUSLE, Indeks Erosivitas Hujan (Rw), Indeks Erodibilitas (K), Faktor Panjang Lereng (L) dan Kemiringan Lereng (S), Faktor Pengelolaan Tanaman (C) Dan Konservasi Tanah (P), Perkiraan Laju Sedimentasi. Berdasarkan hasil penelitian didapatkan bahwa Total Sedimen potensial Sungai bengawan Solo Hulu, Hasil Penambahan dari beberapa Anak Sungai yang Masuk yaitu 3046,519 m3/tahun.
PERENCANAAN DINDING PENAHAN TANAH DALAM MENGATASI KERUNTUHAN TEBING SUNGAI DESA SAIK KAB. KUANTAN SINGINGI Chitra Hermawan
JURNAL PLANOLOGI DAN SIPIL (JPS) Vol 3 No 1 (2021): JPS Volume 3 Nomor 1, Februari 2021
Publisher : LEMBAGA PENELITIAN DAN PENGABDIAN KEPADA MASYARAKAT (LPPM)

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Sungai Indragiri yang oleh masyarakat kuantan singingi disebut sungai Kuantan sekarang ini mengalami kerusakan mulai dari kualitas air yang menurun akibat dari penambangan emas dan pasir sampai masalah longsor tebing sungai. Kondisi ini akan menimbulkan dampak buruk bagi masyarakat, diantaranya jalan akses desa, dan rumah penduduk terancam amblas ke sungai. Tujuan penelitian ini adalah membuat perencanaan teknis dalam usaha mengatasi longsor tersebut. Longsor yang terjadi disebabkan oleh tekanan tanah lateral aktif pada tebing sungai dan untuk menanggulangi masalah tersebut diperlukan bangunan untuk perkuatan tebing sungai diantaranya adalah dinding penahan gravitasi dan dinding penahan kantilever. Stabilitas kontruksi diperoleh dari berat sendiri dinding penahan dan berat tanah(over burden) diatas tumit tapak (heel). Berdasarkan hasil analisa aplikasi Hec-Ras saat terjadi banjir ketinggian muka air mencapai ± 2,5 m dibawah tebing sungai dengan debit (Q) = 4500 m3/dtk. dan longsor yang terjadi tiap tahun mencapai rata-rata 12 m3 per meter panjang. Bentuk dan ukuran (dimensi) dinding penahan memenuhi syarat pada faktor kapasitas tahanan guling ( Fgl = 5,65 > 2) dan faktor kapasitas keruntuhan daya dukung( qmax = 63,57 kN/m2 < qa = 200 kN/m2 ), tapi tidak memenuhi syarat pada kapasitas tahanan geser ( Fgs = 1,76 < 2) sehingga diperlukan dukungan pondasi tiang pancang(Qa= Qu / F = 2985,68 / 2,5 = 1194,3 kN). Pada struktur dinding penahan dan pile cap, untuk tulangan pokok memakai baja D25 dan tulangan geser memakai baja D10 dengan fy, 240 Mpa dengan mutu beton fc, 25 Mpa. Perhitungan penulangan elemen struktur yang mengacu pada SNI 2847-2013.
Perencanaan Tanggul Sungai Petapahan Di Desa Petapahan Kecamatan Gunung Toar ade irawan; Dwi Visti Rurianti; Gusmulyani Gusmulyani; Chitra Hermawan; Surya Adinata; Fitra Andika Farse
BHAKTI NAGORI (Jurnal Pengabdian kepada Masyarakat) Vol 1 No 1 (2021): BHAKTI NAGORI (Jurnal Pengabdian kepada Masyarakat), Juni 2021
Publisher : LPPM UNIKS

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (511.779 KB) | DOI: 10.36378/bhakti_nagori.v1i1.1463

Abstract

Kegiatan Pengabdian Kepada Masyarakat (PKM) yang dilaksanakan merupakan perwujudan dari Catur Dharma Perguruan Tinggi oleh Prodi Teknik Sipil. PKM dilaksanakan di desa Petapahan, Kec.Gunung Toar selama 1 hari dengan sumber dana berasal dari UNKS dengan judul “Perencanaan Tanggul Sungai Petapahan di Desa Petapahan Kecamatan Gunung Toar”, Kegiatan PKM bertujuan untuk meningkatkan pemahaman masyarakat tentang kejadian – kejadian banjir yang terjadi khususnya di desa Petapahan akibat meluapnya Sungai Petapahan. Kegiatan PKM ini juga memberikan gambaran besaran debit atau banjir rancangan yang terjadi pada sungai Petapahan tersebut. Selain itu, kegiatan PKM ini juga dapat dijadikan sebagai alternatif perancangan bangunan banjir yang terjadi. Kegiatan PKM berlangsung dengan lancar, didukung oleh perangkat desa dan masyarakat desa Petapahan, sehingga luaran yang ditargetkan berupa peningkatan pemahaman masyarakat tentang permasalahan kejadian banjir dan alternatif bangunan penahan banjir bisa disampaikan tepat sasaran
PENGEMBANGAN IRIGASI UNTUK LAHAN PERSAWAHAN DI DESA BANJAR BENAI KECAMATAN BENAI Ade Irawan; Gusmulyani Gusmulyani; Surya Adinata; Chitra Hermawan; Joko Triyanto; Dwi Visti Rurianti
BHAKTI NAGORI (Jurnal Pengabdian kepada Masyarakat) Vol 1 No 2 (2021): BHAKTI NAGORI (Jurnal Pengabdian kepada Masyarakat), Desember 2021
Publisher : LPPM UNIKS

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (927.917 KB) | DOI: 10.36378/bhakti_nagori.v1i2.1823

Abstract

Daerah irigasi adalah kesatuan lahan yang mendapat air dari satu jaringan irigasi.Budidaya tanaman padi di Desa Banjar Benai masih terkendala oleh masalah kualitas sarana irigasi yang kurang menunjang, belum adanya data jaringan irigasi yang terbaru dan belum adanya aturan tentang operasi untuk distribusi daerah irigasi.Pelaksanaan pengabdian kepada masyarakat (PKM) didesa Banjar Benai dilakukan dengan pertemuan langsung antara aparatur pemerintah, masyarakat desa dan tim PKM teknik sipil. Proses identifikasi meliputi pengamatan, survey dan wawancara terhadap potensi pertanian disekitar irigasi yang akan dilakukan perencanakan dan pengembangan di Desa Banjar Benai.Data yang diperoleh dari hasil pengabdian, hasilnya jauh lebih besar dibandingkan dengan data yang diperoleh dari Dinas PUPR Kabupaten Kuantan Singingi. Hal ini bisa dipahami, karena data yang dimiliki oleh Dinas PUPR merupakan data yang lama dan banyak pembangunan yang dilaksanakan di daerah Irigasi Banjar Benai belum di masukkan kedalam data yang ada tersebut. Maka, untuk pembangan daerah Irigasi Banjar Benai diperlukan data terkini, yaitu data yang sesuai dengan pengabdian.
PELELANGAN PENGADAAN BARANG DAN JASA KONSTRUKSI DALAM PERSPEKTIF ISLAM Ade Irawan; Surya Adinata; Chitra Hermawan; Dwi Visti Rurianti; Joko Triyanto
BHAKTI NAGORI (Jurnal Pengabdian kepada Masyarakat) Vol 2 No 2 (2022): BHAKTI NAGORI (Jurnal Pengabdian kepada Masyarakat) Desember 2022
Publisher : LPPM UNIKS

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36378/bhakti_nagori.v2i2.2708

Abstract

Pelelangan Pengadaan Barang dan Jasa Konstruksi dilaksanakan dipemerintahan maupun swasta. Pihak penyelenggara dan peserta lelang diatur oleh aturan yang baku. Etika sangat diperlukan dalam pelaksanaan pelelangan ini. Namun, dalam pelaksanaannya terkadang masih ada kecurangan-kecurangan yang tidak terdeteksi oleh etika. Sehingga, hal yang tidak terdeteksi oleh etika diperlukan nilai-nilai islam bahwa ada aturan Allah SWT yang memperkuat etika pelelangan. LKPP LPSE adalah Lembaga Pemerintah Non-Kementerian (LPNK) yang berada di bawah naungan Presiden Republik Indonesia yang bertugas untuk melaksanakan pengadaan barang jasa Pemerintah. Sedangkan Layanan Pengadaan Secara Elektronik (LPSE) adalah sistem elektronik pengadaan barang jasa Pemerintah yang dikembangkan oleh LKPP. Materi Pelelangan Pengadaan Barang dan Jasa Konstruksi dalam Perspektif Islam yang disampaikan oleh Tim dosen Prodi Teknik Sipil diantaranya bahwa mata kuliah yang relevan terhadap pelelangan proyek yakni enggambar Struktur Bangunan di semester 1, Rencana anggaran Biaya serta Aspek Hukum dan Pembangunan serta manajemen proyek di semester 5, Etika Leadher Ship dan Kewirausahaan Konstruksi di semester 6. Proses pelelangan merujuk pada Perpres No. 12 Tahun 2021 tentang Perubahan Atas Peraturan Presiden Nomor 16 Tahun 2018 Tentang Pengadaan Barang/Jasa Pemerintah. Syariah Islam membolehkan jual beli barang/ jasa yang halal dengan cara lelang yang dalam fiqih disebut sebagai akad Bai’ Muzayadah. Titik berat Pelelangan Pengadaan Barang dan Jasa Konstruksi dalam Perspektif Islam adalah keadilan. Penyelenggara dan peserta lelang agar menjadikan etika berkeadilan bersumber dari Allah SWT sebagai basis keimanan dalam proses pelelangan untuk keselamatan dunia dan akhirat.
EVALUASI TEBAL PERKERASAN KAKU DENGAN METODE BINA MARGA MDP Pd T-14-2013 STUDI KASUS JALAN SUNGAI JERING – KARI. TELUK KUANTAN Nurman. L; Chitra Hermawan
JURNAL PERENCANAAN, SAINS DAN TEKNOLOGI (JUPERSATEK) Vol 2 No 1 (2019): Jurnal Perencanaan, Sains, Teknologi, dan Komputer (JuPerSaTek)
Publisher : FAKULTAS TEKNIK

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (654.368 KB)

Abstract

Jalan Sungai Jering – Kari Kuantan Singingi merupakan jalan Provinsi terdiri dari dua jalur, yang existingnya masing – masing jalur berbeda. Sebelah jalur kiri existingnya merupakan aspal lama dan sebelah kanan existingnya masih tanah dasar asli,oleh karena itu penulis mengevaluasi tebal perkerasan kaku pada ruas jalan Sungai Jering – Kari dengan mengunakan metode Bina Marga Manual Desain Perkerasan Pd T- 14 – 2013. Dari hasil perhitungan evaluasi menggunakan ketebalan 295 mm atau 29,5 cm, sesuai dengan hasil perhitungan perencanaan tebal perkerasan dengan menggunakan metode Manual Desain Perkerasan Jalan 2013 dan untuk pondasi bawah menggunakan lapis pondasi agregat kelas A dengan tebal 15 cm.
INVENTARISASI DAN SURVEI PEMETAAN JEMBATAN DI KABUPATEN KUANTAN SINGINGI Reki Elliandra; Chitra Hermawan
JURNAL PERENCANAAN, SAINS DAN TEKNOLOGI (JUPERSATEK) Vol 3 No 1 (2020): Jurnal Perencanaan, Sains, Teknologi, dan Komputer (JuPerSaTek)
Publisher : FAKULTAS TEKNIK

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (941.161 KB)

Abstract

Aset bangunan infrastruktur yang miliki oleh Pemerintah Daerah Kabupaten Kuantan Singingi khususnya jembatan perlu dilakukan survei inventarisasi dan penilaian kondisi eksisting secara bekala serta dilengkapi dengan peta jaringan jembatan untuk mempermudah petugas dinas mengetahui lokasi jembatan tersebut. Dalam menentukan koordinat jembatan dibutuhkan perangkat GPS (Global Positioning System) kemudian diolah menggunakan aplikasi pada komputer, untuk menentukan nilai kondisi existing jembatan menggunakan teori Bridge Condition Ratting (BCR) yaitu indeks kondisi jembatan dipergunakan pada metode NYSDOT (New York State Departement Of Transportation). Dalam penyusunan peta jaringan jembatan dilakukan pada Wilayah Zona 1 (Kecamatan Kuantan Tengah dan Sentajo Raya) menggunkan perangkat GPS yang diolah dengan software Global Mapper V.15, Google Earth, ArcCatalog, ArcMap, dan Microsoft Excel. Ada 10 jembatan yang akan diinventarisasi dan hanya 2 jembatan yang akan dilakukan penilaian kondisi eksisting jembatan yang masing-masing penilaian terdiri dari 13 komponen pada jembatan tersebut. Hasil data inventarisasi terdapat 10 jembatan diantanya 2 jembatan gantung, 3 jembatan rangka baja dan 5 jembatan beton. Penilaian indeks jembatan dilakukan pada : [1]. Jembatan rangka Sungai Godang dengan nilai BCR 6,333 (Baik), Equivalen of Age 10,1 Tahun dan waktu layanan 39,9 tahun dengan usulan pemeliharaan rutin dan berkala. [2] Jembatan rangka Kuantan I yang berlokasi di Pulau Bungin nilai BCR 6,111 (Baik), Equivalen of Age 13,2 Tahun dan waktu layanan 36,8 tahun dengan usulan pemeliharaan rutin dan berkala.
PERENCANAAN DINDING PENAHAN TANAH DALAM MENGATASI KERUNTUHAN TEBING SUNGAI DESA SAIK KAB. KUANTAN SINGINGI Heri Sudadi; Chitra Hermawan
JURNAL PERENCANAAN, SAINS DAN TEKNOLOGI (JUPERSATEK) Vol 4 No 1 (2021): Jurnal Perencanaan, Sains, Teknologi, dan Komputer (JuPerSaTek)
Publisher : FAKULTAS TEKNIK

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Sungai Indragiri yang oleh masyarakat kuantan singingi disebut sungai Kuantan sekarang ini mengalami kerusakan mulai dari kualitas air yang menurun akibat dari penambangan emas dan pasir sampai masalah longsor tebing sungai. Kondisi ini akan menimbulkan dampak buruk bagi masyarakat, diantaranya jalan akses desa, dan rumah penduduk terancam amblas ke sungai. Tujuan penelitian ini adalah membuat perencanaan teknis dalam usaha mengatasi longsor tersebut. Longsor yang terjadi disebabkan oleh tekanan tanah lateral aktif pada tebing sungai dan untuk menanggulangi masalah tersebut diperlukan bangunan untuk perkuatan tebing sungai diantaranya adalah dinding penahan gravitasi dan dinding penahan kantilever. Stabilitas kontruksi diperoleh dari berat sendiri dinding penahan dan berat tanah(over burden) diatas tumit tapak (heel). Berdasarkan hasil analisa aplikasi Hec-Ras saat terjadi banjir ketinggian muka air mencapai ± 2,5 m dibawah tebing sungai dengan debit (Q) = 4500 m3/dtk. dan longsor yang terjadi tiap tahun mencapai rata-rata 12 m3 per meter panjang. Bentuk dan ukuran (dimensi) dinding penahan memenuhi syarat pada faktor kapasitas tahanan guling ( Fgl = 5,65 > 2) dan faktor kapasitas keruntuhan daya dukung( qmax = 63,57 kN/m2 < qa = 200 kN/m2 ), tapi tidak memenuhi syarat pada kapasitas tahanan geser ( Fgs = 1,76 < 2) sehingga diperlukan dukungan pondasi tiang pancang(Qa= Qu / F = 2985,68 / 2,5 = 1194,3 kN). Pada struktur dinding penahan dan pile cap, untuk tulangan pokok memakai baja D25 dan tulangan geser memakai baja D10 dengan fy, 240 Mpa dengan mutu beton fc, 25 Mpa. Perhitungan penulangan elemen struktur yang mengacu pada SNI 2847-2013.
PERENCANAAN SALURAN DRAINASE DALAM MENGATASI GENANGAN DESA PADANG TANGGUNG PANGEAN Renndy Heska Desrian Habibullah; Chitra Hermawan
JURNAL PERENCANAAN, SAINS DAN TEKNOLOGI (JUPERSATEK) Vol 4 No 2 (2021): Jurnal Perencanaan, Sains, Teknologi, dan Komputer (JuPerSaTek)
Publisher : FAKULTAS TEKNIK

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36378/jupersatek.v4i2.2351

Abstract

Drainase mempunyai arti mengalirkan, menguras, membuang air. Secara umum, drainase didefinisikan sebagai serangkayan bangunan air yang berfungsi untuk mengurangi atau membuang kelebihan air dari suatu kawasan atau lahan, sehingga lahan dapat difungsikan secara optimal. Drainase juga diartikan sebagai usaha untuk mengontrol kualitas air tanah dalam kaitannya dengan salinitas. Tujuan dari penelitian ini untuk merencanakan Dimensi Drainase di Ruas Jalan Desa Padang Tanggung Pangean. Data yang digunakan adalah data sekunder yang diperoleh dari Dinas Pertanian Kabupaten Kuantan Singingi dan data primer diperoleh dari survey langsung dilapangan. Metode pengolahan data menggunakan perhitungan secara manual sesuai dengan metode rasional untuk menghitung debit banjir, dan rumus manning untuk menghitung kecepatan saluran. Setelah dilakukan perhitungan maka didapat dimensi saluran ekonomis untuk saluran drainase utama adalah dengan lebar dasar B = 0,80 m dan tinggi saluran H = 0,80 m dengan penampang melintang saluran berbentuk persegi empat, serta biaya yang diperlukan untuk pembangunan drainase adalah Rp.132.180.000.