Claim Missing Document
Check
Articles

Found 3 Documents
Search

STUDI EVALUASI KESESUAIAN TEKNIS TERHADAP HASIL DESAIN TEKNIS KONSTRUKSI EMBUNG PILANGBANGO KOTA MADIUN Pujo Priyono
Jurnal Penelitian IPTEKS Vol 1, No 1 (2016): JURNAL PENELITIAN IPTEKS
Publisher : Universitas Muhammadiyah Jember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32528/ipteks.v1i1.261

Abstract

Keretakan pada bangunan embung pilangbango kota Madiun, memunculkan issue. Beberapa pihak, mendakwa kesalahan ada di tingkat perencanaan teknis, yakni perencana telah lalai memperhitungkan semua aspek pertimbangan desain teknis yang sesuai dengan syarat dan aturan yang berlaku Beberapa pihak lain, menyangka kesalahan ada di tingkat pelaksanaan, yakni pihak pelaksana lalai untuk taat pada spesifikasi teknis yang telah diatur dan disyaratkan. Permasalahan dari studi ini adalah bagaimana membuat suatu laporan studi evaluasi yang bisa menggambarkan tingkat kesesuaian teknis dari hasil desain teknis yang dihasilkan oleh perencana. Tujuan studi ini adalah untuk bisa memberikan gambaran tentang kesesuaian dari pertimbangan teknis dari hasil desain teknis yang telah dilakukan perencana, untuk jenis beban statis. Studi ilmiah ini, merupakan bentuk studi evaluasi dari sesuatu yang sudah dihasilkan dari tahapan perencanaan, yang berupa gambar perencanaan, spesifikasi teknik dan data laboratorium penyelidikan tanah melalui kajian kepustakaan untuk bisa mendiskripsikan dengan baik secara ilmiah data-data sekunder yang penting untuk diperoleh, sebagai data utama untuk bahan evaluasi, baik kekuatan maupun kestabilan dari suatu struktur. Hasil studi mendiskripsikan bahwa secara pertimbangan teknis, khususnya untuk beban statis, konstruksi tembok penahan tanah pada bangunan embung pilangbango kota Madiun, sesuai dengan pertimbangan teknis yang berlaku dan dipersyaratkan.
STUDI PERKUATAN GEOTEXTILE PADA LERENG DENGAN VARIASI KEMIRINGAN DAN JARAK PONDASI DANGKAL MELALUI PEMODELAN DI LABORATORIUM Edo Caraka Yodha; Arief Alihudien; Pujo Priyono
HEXAGON Vol 4, No 2 (2019): HEXAGON
Publisher : Universitas Muhammadiyah Jember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32528/hgn.v4i2.3565

Abstract

Indonesia is a country in a period of growing development where the infrastructure is built not off of the ground inclined plane or slope, such as housing construction and the manufacture of the Embankment to the road Toll. Responding to the incident the author conducted the analysis of stability of slopes with and without reinforcement through modeling in the laboratory. There are several types of soil reinforcement, use reinforcement Geotextile, the use of a Geotextile can increase the stability of the slope. This study aims to determine the stability of the slopes against the influence of the three variations of the distance of loading a shallow foundation and three variations of the slope. Testing in this study are divided into 2 kinds of models, namely: (1) Testing the Model I is test 2 variations of the distance of loading and 3 variations of the slope of the ground without the use of reinforcement Gotextile Woven (2) Testing the Model II is a test of the 2 variations of the distance of loading and 3 variations of the slope of the land with the use of reinforcement Gotextile Woven. In a review of 3 (three) variations of the slope, namely: 45º, 50º, and 60º, as well as 2 (two) variations of the distance of the load acting on the slope, namely: 4 cm and 7 cm. On the modeling of the soil before repaired using Geotextile can be seen that the smaller the angle kelerengannya, then the power capacity of the soil is correlated with soil stiffness is of great value. While the modeling of soil after repaired using Geotextile the smaller the angle kelerengannya, then the power capacity of the soil is correlated with the stiffness of the soil of little value. On the modeling of the soil before repaired using Geotextile can be seen that the farther the distance of loading from the lips of the slopes, then the power capacity of the soil is correlated with soil stiffness is of great value. While the modeling of soil after repaired using Geotextile the greater the distance of loading from the lips of the slopes, then the power capacity of the soil is correlated with the stiffness of the soil of little value. Can in the analogy that the repair of soil slopes using Geotextile has the properties memperkaku the land where the greater the angle of the slope then the more rigid.
Penerapan Metode Barchart, CPM, PERT dan Crashing Project dalam Penjadwalan Proyek Pembangunan Gedung G Universitas Muhammadiyah Jember Amri Gunasti; Ach. Rofiqi; Pujo Priyono
Rekayasa: Jurnal Teknik Sipil Vol 4, No 1 (2019): Jurnal Rekayasa Teknik Sipil
Publisher : Universitas Madura

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53712/rjrs.v4i1.612

Abstract

Penelitian ini bertujuan untuk mengetahui percepatan serta membandingkan masing-masing metode. Hasil penelitian menunjukkan bahwa dengan menggunakan metode Barchat perhitungan awal dan perhitungan akhir dengan lama pengerjaan selama 44 minggu, metode CPM juga selama 44 minggu, metode CPM tidak bisa mengetahui jumlah anggaran dan hanya bisa mengetahui litasan kritis dengan metode perhitungan maju dan mundur. Metode PERT dengan meneliti  24% kegiatan, selesai dengan 42 minggu. Untuk 99,11%  pekerjaan selesai dengan durasi 52 minggu  dan 99,93% pekerjaan selesai dengan durasi 62 minggu. Setelah dilakukan Crashing Project,  durasi yang awalnya selama 44 minggu dengan jumlah hari 1320 hari mengalami percepatan sampai 1140 hari atau 38 minggu dengan selisih waktu 6 bulan dan jumlah anggaran yang harus di tambah adalah Rp. 2.390.418.814 dan dana keseluruhan yang harus di keluarkan  adalah Rp. 7.217.353.814,29.