Evaluasi Penerapan Keselamatan dan Kesehatan Kerja Pada Gedung Perawatan Jiwa RSUD Nagan Raya Chaira Chaira; Zakia zakia
Jurnal Teknik Sipil dan Teknologi Konstruksi Vol 4, No 2 (2018): Jurnal Teknik Sipil Dan Teknologi Konstruksi
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (952.906 KB) | DOI: 10.35308/jts-utu.v4i2.1289

Abstract

The construction industry is a sector that has a high level of risk both in terms of business risks, occupational health and safety risks. The lack of OHS implementation, resulting in increased work accidents in construction projects. OHS in the Construction Industry needs special attention, it can cause harm to workers, employers, the government and the community, which can be human casualties, property damage and the environment around the project. This study aims to determine the application of OSH in the New Building Care project at Nagan Raya Hospital and to determine the factors that influence OSH in the project. OSH evaluation is carried out by giving questionnaires to the project implementers then performed univariate and bivariate analysis to determine the relationship between variables. The number of respondents 25 people. The results obtained are the most dominant age 16-20 years and at least 42-44 years. The highest level of education in the group without school and the lowest S. The average work period of workers is 10-15 years by 40%. The results of univariate analysis, the frequency distribution for answers "less" is 61.5% for site managers, as well as implementers who answer "no" with a frequency of 60.0% and supervisors 41.7%. This indicates the lack of application of OSH to the project concerned. This is due to the lack of knowledge about OSH management systems and concepts both from the site manager as the project manager, implementer and supervisor so that workers do not get a proper understanding of the OSH.
PERENCANAAN TENAGA KERJA DAN BIAYA TENAGA KERJA PADA PEKERJAAN BETON STRUKTUR KOLOM Dian Febrianti; Zakia zakia
Jurnal Teknik Sipil dan Teknologi Konstruksi Vol 5, No 1 (2019): Jurnal Teknik Sipil Dan Teknologi Konstruksi
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (320.424 KB) | DOI: 10.35308/jts-utu.v5i1.1081

Abstract

The project is a group of interconnected activities where there are starting points and end points and certain results. Projects usually require various skills from various professions and  organization.  The  resources  used  during  construction  are  men,  money,  materials, machines, methods, marketing, and information. Manpower / human resources is one of the most important factors of project success. In addition, another important factor is planning labor costs, because to find out the amount of costs incurred on the project. The purpose of this study is to find out the labor requirements and the amount of labor costs, as well as knowing the accumulation of labor needs and the greatest costs for a given week and the causes, especially the concrete work of column structures. In writing this final project, the method of calculating the amount of labor and costs is used with the help of Microsoft Excel, then visualized through graphics. The data used in this study is secondary data consisting of drawing plans, Budget Plan (RAB), time schedule, progress, and work plans. This study resulted in the calculation of labor requirements, in the column structure, namely 582.21 OH. With details, workers 442.96 OH, artisan94.29 OH, artisan head 23.46 OH, and Overseer 21.51 OH. The labor cost needed to finance this work is Rp. 26,249,643.00. The use of the largest costs occurs at week 4, costs Rp. 4,902,580.00 and the smallest costs occur at week 2 of Rp. 337,608.00. Based on this research, labor requirements and labor costs have been well distributed