DAMPAK CHANGE ORDER PROYEK KONSTRUKSI BANGUNAN GEDUNG BERTINGKAT SEDANG Kevin Daniel Lakaoni; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 2, Mei 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i2.21974

Abstract

The construction of medium-rise building construction projects in Indonesia is increasing and spreading throughout the region. In general, construction projects often experience changes in their implementation. Such changes can occur at the suggestion of the owner, contractor or consultant. Changes to a project in its execution are often known as change order. Change orders are brought on by a variety of things, including insufficient equipment, changing the scope of the job, altering the plan drawings, and variations between the field conditions and the drawing design. It's important to understand the effects of change orders in order to decrease their frequency. This study's objective is to ascertain the impact of change orders on medium-rise building construction projects. To that end, it has been broken down into a number of different variables, including cost, quality, time, organization, and others, and then put together into a questionnaire. There were 30 people that responded to the survey that was given out. The Partial Least Squares approach was used to do the analysis (Smart PLS 4.0 software). Change orders were shown to significantly affect cost and other factors in medium-rise buildings. Abstrak Pembangunan proyek konstruksi gedung bertingkat di Indonesia semakin bertambah banyak dan tersebar luas ke seluruh daerah. Pada umumnya proyek konstruksi sering mengalami perubahan dalam pelaksanaannya. Perubahan tersebut dapat terjadi atas ajuan dari pemilik, kontraktor ataupun konsultan dan harus disetujui oleh semua pihak. Perubahan pada proyek dalam pelaksanaannya sering dikenal sebagai change order. Change order disebabkan oleh beberapa faktor seperti perbedaan kondisi lapangan dengan gambar desain, perubahan lingkup pekerjaan, perubahan gambar rencana, peralatan yang tidak memadai dan lain-lain. Untuk mengurangi terjadinya change order maka perlu untuk mengetahui dampak dari change order. Change order memiliki dampak yang berbeda-beda pada setiap proyek. Riset ini bertujuan untuk mengenali dampak atau akibat change order pada proyek konstruksi bangunan gedung bertingkat sedang. Dampak change order dipecah dalam lima kategori yaitu biaya, mutu, waktu, organisasi serta lainnya kemudian disusun menjadi suatu kuesioner. Penyebaran kuesioner dilakukan dengan jumlah 30 responden. Dari hasil penyebaran kuesioner tersebut maka dilakukan pengolahan data menggunakan metode Partial Least Square (aplikasi Smart PLS). Setelah dilakukan analisis diperoleh bahwa change order berdampak signifikan terhadap variabel biaya dan lainnya pada proyek konstruksi bangunan gedung bertingkat sedang dengan nilai path coefficient sebesar 0,669 atau 66,9% untuk biaya dan 0,437 atau 43,7% untuk lainnya.
PENGARUH LINGKUNGAN KERJA, PELAKSANAAN K3, DAN TENAGA KERJA TERHADAP PRODUKTIVITAS TENAGA KERJA Vincentsius Wijaya; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 2, Mei 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i2.21975

Abstract

Human resources play a significant role in an industry. In the implementation of the construction process or the process of building high-rise buildings, safety and health in construction work (K3), sufficient work areas, and a trained workforce are prioritized. So that workers can feel comfortable and safe in carrying out any construction work. With the existence of quality human resources so that it can affect the labor productivity of an industry. K3 is one of the significant aspects that can affect labor productivity. A messy or unconducive work area greatly affects the performance of workers. Labor is needed in every job done. If the selected workforce is not trained or does not meet the job criteria, it can affect labor productivity. This research was carried out by distributing questionnaires to construction workers with the aim of examining the influence exerted on the dependent variable by means of information processing using Partial Least Square (PLS) where several tests were carried out to find out what influences could have an impact on labor productivity. After analysis, it was found that the work area and labor variables had an effect on labor productivity. Abstrak Sumber daya manusia memegang peranan berarti dalam suatu industri. Dalam penerapan proses konstruksi atau proses pembangunan gedung gedung tinggi sangat diutamakan keselamatan serta kesehatan kerja konstruksi( K3), area kerja yang mencukupi, dan tenaga kerja yang telah terlatih. Sehingga para pekerja bisa merasa nyaman serta aman dalam melaksanakan sesuatu pekerjaan konstruksi. Dengan terdapatnya sumber daya manusia yang bermutu sehingga dapat mempengaruhi produktivitas tenaga kerja suatu industri. K3 ialah salah satu aspek berarti yang dapat mempengaruhi produktivitas tenaga kerja. Area kerja yang berantakan ataupun tidak kondusif sangat mempengaruhi kinerja para pekerja. Tenaga kerja sangat diperlukan dalam setiap pekerjaan yang dilakukan. Bila tenaga kerja yang diseleksi tidak terlatih ataupun tidak penuhi kriteria pekerjaan, maka dapat mempengaruhi produktivitas tenaga kerja. Riset ini dilakukan dengan menyebarkan kuisioner kepada para pelaku konstruksi yang bertujuan untuk meneliti pengaruh yang diberikan terhadap variabel terikat dengan tata cara pengolahan informasi memakai Partial Least Square (PLS) dimana dilakukan beberapa uji untuk dapat mengetahui pengaruh apa saja yang dapat berakibat pada produktivitas tenaga kerja. Setelah dilakukan analisis diperoleh bahwa variabel area kerja dan tenaga kerja berpengaruh terhadap produktivitas tenaga kerja.
PENERAPAN METODE EARNED VALUE DAN EARNED SCHEDULE PELAKSANAAN PROYEK RUMAH SAKIT X DI BANDUNG Reynaldo Farrel Fausta Tangtobing; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 2, Mei 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i2.22251

Abstract

A construction project is a series of activities carried out to construct a building within a specified period. Delay in construction projects is a problem that often occurs so that these constraints make the project implementation time not as specified. The success of project management is based on proper project control. This research is based on real data from one of the hospital projects in Bandung. The purpose of this study is to estimate the project completion time using the Earned Value and Earned Schedule methods. Calculations were made in 3 conditions, namely at the 30th week, the 45th week, and the 49th week. Based on the results of calculations using the Earned Value method, the project completion time is in the 30th week for 51.5 weeks or 3.5 weeks late from the 48-week planned time. In the 45th week, the project completion time was obtained for 48.35 weeks or 0.35 weeks late from the planned time of 48 weeks. And in the 49th week, the project completion time was obtained for 52.01 weeks or 0.01 weeks late from the planned time of 52 weeks. Meanwhile, based on the results of calculations using the Earned Schedule method, the project completion time was obtained in the 30th week for 53.184 weeks. In the 45th week, the project completion time was 51,537 weeks. In the 49th week, the project completion time was 52.136 weeks. Abstrak Proyek konstruksi merupakan suatu rangkaian kegiatan yang dilakukan untuk membangun suatu bangunan dalam jangka waktu yang ditetapkan. Keterlambatan dalam proyek konstruksi adalah suatu masalah yang sering terjadi  sehingga kendala tersebut membuat waktu pengerjaan pelaksanaan proyek tidak sesuai dengan yang ditetapkan. Keberhasilan manajemen proyek didasari oleh pengendalian proyek yang tepat. Penelitian ini berdasarkan data riil salah satu proyek rumah sakit di Bandung. Tujuan dari penelitian ini untuk memperkirakan waktu selesai proyek menggunakan metode Earned Value dan Earned Schedule. Perhitungan dilakukan pada 3 kondisi yaitu pada minggu ke-30, minggu ke-45, dan minggu ke-49. Berdasarkan hasil perhitungan dengan metode Earned Value didapatkan waktu penyelesaian proyek pada minggu ke-30 selama 51,5 minggu. Pada minggu ke-45 didapatkan waktu penyelesaian proyek selama 48,35 minggu. Dan pada minggu ke-49 didapatkan waktu penyelesaian proyek selama 52,01 minggu. Sedangkan  berdasarkan hasil perhitungan dengan metode Earned Schedule didapatkan waktu penyelesaian proyek pada minggu ke-30 selama 53,184 minggu. Pada minggu ke-45 didapatkan waktu penyelesaian proyek selama 51,537 minggu. Pada minggu ke-49 didapatkan waktu penyelesaian proyek selama 52,136 minggu. Hasil perkiraan waktu akhir proyek dengan metode Earned Value lebih akurat daripada metode Earned Schedule. Tetapi berdasarkan hasil perhitungan minggu ke-45 metode Earned Schedule lebih akurat terhadap waktu aktual selesai proyek.
PENYEBAB CHANGE ORDER PROYEK KONSTRUKSI RUMAH SAKIT Daniel Daniel; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 2, Mei 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i2.22252

Abstract

The number of hospital construction projects in Indonesia continues to grow. The main reason is because Indonesia's territory is getting denser, so it is necessary to develop supporting facilities to keep up with this development. In a construction project there are three important things in a construction project to focus on, namely quality, cost and time. In order for these three important elements to be carried out, an agreement must be made which must be agreed upon and regulated by the parties involved in accordance with the applicable provisions and in the form of a contract. In a project there may be a change in the contract caused by several predictable and unexpected variables, these changes are known as change orders. Change orders are common and unavoidable in every construction project, both government construction projects and private construction projects. To reduce the occurrence of change orders, it is necessary to know the factors that cause changes in contracts in hospital construction projects. Factors that cause change orders are compiled into a questionnaire to find out the main causes of change orders. Questionnaires were distributed to owners, consultants and contractors who are experienced in hospital construction projects in the Bandung area. This questionnaire will be processed using the Partial Least Square method and using the smartPLS 3.0 application. It was found that the construction factor affected the change order in hospital construction projects with a path coefficient value of 0.702 or 70.2%. Abstrak Jumlah proyek konstruski rumah sakit di Indonesia terus berkembang. Alasannya dikarenakan wilayah Indonesia yang semakin padat, dan dibutuhkanlah pengembangan fasilitas-fasilitas pendukung untuk mengikuti perkembangan tersebut. Pada proyek konstruksi terdapat tiga hal penting yang menjadi fokus, yaitu mutu, biaya dan waktu. Agar ketiga unsur itu dapat terwujud, dibuat suatu kontrak yang disepakati dan diatur oleh pihak yang terlibat sesuai dengan ketentuan yang berlaku. Pada suatu proyek bisa terjadi perubahan kontrak yang disebabkan oleh beberapa variabel terduga maupun variabel yang tidak terduga, perubahan tersebut dikenal dengan istilah change order. Change order merupakan hal umum dan tidak dapat dihindari dalam setiap proyek konstruksi, baik proyek konstruksi pemerintah maupun proyek konstruksi swasta. Untuk mengurangi terjadinya change order, maka perlu mengetahui faktor penyebab perubahan kontrak pada proyek konstruksi rumah sakit. Faktor penyebab change order disusun menjadi kuesioner guna mengetahui penyebab utama dari change order. Penyebaran kuesioner dibagikan kepada para pemilik, konsultan, serta kontraktor yang berpengalaman dalam proyek konstruksi rumah sakit di wilayah Bandung. Kuesioner ini diolah dengan menggunakan metode Partial Least Square dan menggunakan aplikasi smartPLS 3.0. Diperoleh bahwa faktor  konstruksi berpengaruh terhadap change order pada proyek konstruksi rumah sakit dengan nilai path coefficient sebesar 0,702 atau 70,2%.
ANALISIS RISIKO KERJA PROYEK PEMBANGUNAN IT MANDIRI BUMI SLIPI Bagus Tri Wizaksono; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 4, November 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i4.24917

Abstract

Occupational accidents are a problem in Occupational Health and Safety (OHS) activities in a job, especially construction. Accidents that occur can provide losses both in terms of workers and companies. Such as workers who are hit by material that can cause injury so they have to undergo hospitalization and disrupted work time. Things like this can cause losses in terms of time, cost, and performance of a job. This analysis focuses on workers and identifies the factors that cause accidents that are often experienced by workers so that the factors that are most at risk of causing accidents during work activities can be identified. The research will be conducted by direct interviews and distributing questionnaires to workers at the Mandiri Bumi Slipi IT Project. The risk assessment method uses a risk assessment matrix that originates from Standard Operational Procedures for Hazard Identification, Risk Assessment, Determination of Risk Control and Opportunities (SOP/UPM/DJBM-149). The results obtained from processing the risk value data from the formwork, reinforcement and curtain wall work categories belong to the small to medium risk level with the smallest value of 2 and the highest moderate risk level of 6. Abstrak Kecelakaan kerja merupakan suatu permasalahan dalam kegiatan Kesehatan dan keselamatan Kerja (K3) pada suatu pekerjaan terutama konstruksi. Kecelakaan yang terjadi dapat memberikan kerugian baik segi pekerja maupun perusahaan. Seperti pekerja tertimpa material yang dapat mengakibatkan cidera sehingga harus menjalani rawat inap dan waktu bekerja yang terganggu. Hal seperti ini yang dapat menyebabkan kerugian dalam aspek waktu, biaya maupun kinerja suatu pekerjaan. Pada penelitian ini akan diteliti suatu identifikasi risiko K3 serta penilaian risiko K3 pada kegiatan pembangunan Proyek IT Mandiri Bumi Slipi. Analisis ini berfokus pada pekerja serta identifikasi faktor penyebab kecelakaan yang sering dialami para pekerja, sehingga dapat diketahui faktor yang paling berisiko mengakibatkan kecelakaan saat kegiatan bekerja. Penelitian akan dilakukan dengan wawancara secara langsung serta penyebaran kuesioner kepada pekerja di Proyek IT Mandiri Bumi Slipi. Metode penilaian risiko menggunakan matriks penilaian risiko yang bersumber Standar Operasional Prosedur Identifikasi Bahaya, Penilaian Risiko, Penentuan Pengendalian Risiko, dan Peluang (SOP/UPM/DJBM-149). Hasil yang diperoleh dari pengolahan data nilai risiko dari kategori pekerjaan bekisting, pembesian dan curtain wall tergolong dalam tingkat risiko kecil hingga sedang dengan nilai terkecil sebesar 2 dan tingkat risiko sedang tertinggi sebesar 6.
PERINGKAT PENGARUH FAKTOR-FAKTOR SMK3L TERHADAP PRODUKTIVITAS TENAGA KERJA PROYEK IT MANDIRI BUMI SLIPI JAKARTA Muhammad Nur Irwansyah Amun; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 7, Nomor 1, Februari 2024
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v7i1.24943

Abstract

One of the most important economic sectors that contributes greatly to the country's development and economic development is the construction industry sector. The importance of productivity in a construction project is a measure of how well a resource is managed and empowered to achieve maximum results with the use of fewer resources. however, please note that there are many factors that can affect labor productivity such as a decrease in internal labor productivity, the implementation and implementation of SMK3L. Therefore, to analyze the ranking of the influence of internal factors, the application and application of SMK3L on labor productivity in the Mandiri Bumi Slipi IT project, research was conducted. The study was carried out in such a way by distributing questionnaires to construction actors such as HSE, site engineering, contractors, and consultants. This study was conducted with the aim of determining the ranking of the influence of internal factors, the application and implementation of SMK3L on the labor productivity of the Mandiri Bumi Slipi Jakarta IT project. Two quantitative calculations using data processing methods are involved such as the Relative Importance Index (RII) and IBM SPSS to determine the validity, reliability, and ranking of the types of influences that may have the most impact on labor productivity. After the overall analysis, the ranking of factors affecting labor productivity highest from internal factors is quality in equipment with RII of 0.8933 and from application and implementation factors is emergency events with RII of 0.8933. Abstrak Salah satu sektor ekonomi terpenting yang berkontribusi besar bagi pembangunan negara dan pembangunan ekonomi adalah sektor industri konstruksi. Pentingnya produktivitas dalam suatu proyek konstruksi merupakan ukuran seberapa baik suatu sumber daya dikelola dan diberdayakan guna mencapai hasil maksimal dengan penggunaan sumber daya sesedikitnya. namun perlu diketahui bahwa terdapat banyak faktor yang dapat mempengaruhi produktivitas tenaga kerja seperti penurunan produktivitas tenaga kerja internal, penerapan dan pelaksanaan SMK3L. Oleh karena itu, untuk menganalisis peringkat pengaruh faktor internal, penerapan dan penerapan SMK3L terhadap produktivitas tenaga kerja di proyek IT Mandiri Bumi Slipi, dilakukan penelitian. Kajian dilakukan sedemikian rupa dengan menyebarkan kuesioner kepada para pelaku konstruksi seperti HSE, site engineering, kontraktor, dan konsultan. Pengkajian ini dilakukan dengan tujuan untuk mengetahui peringkat pengaruh faktor internal, penerapan dan implementasi SMK3L terhadap produktivitas tenaga kerja proyek IT Mandiri Bumi Slipi Jakarta. Dua perhitungan kuantitatif menggunakan metode pemrosesan data dilibatkan seperti Relative Importance Index (RII) dan IBM SPSS untuk menentukan validitas, keandalan, dan peringkat jenis pengaruh yang mungkin berdampak paling besar terhadap produktivitas tenaga kerja. Setelah analisis keseluruhan, peringkat faktor yang mempengaruhi produktivitas tenaga kerja tertinggi dari faktor internal adalah kualitas pada peralatan dengan RII sebesar 0,8933 dan dari faktor penerapan dan pelaksanaan adalah kejadian darurat dengan RII sebesar 0,8933.
ANALISIS NILAI WASTE KERAMIK PADA PROYEK X Kevin Mathew; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 7, Nomor 1, Februari 2024
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v7i1.26610

Abstract

Construction projects often produce values, in the construction field can be interpreted as a loss or a loss of material resources, time, and capital, which is caused by activities that cost money, directly or indirectly, but does not add value to end product for users of construction services. The values produced in the form of materials, quality, time, and costs. In this research, will be examined ceramic, where ceramics often have a significant effect and can influence project costs. Therefore, this research aims to optimize the value of ceramic on project x to optimize costs to reduce its value. The method that will be used in this research is the method of observation, interviews, and analysis of calculations through working drawings, calculations that will be carried out using 2 methods to determine the difference of values so that the value that is expected to be the optimum value for use. This optimization value is very important because the project location is outside Java, and the material supply is on the island of Java so that it can reduce material delivery costs which are quite expensive and can affect the project budget. Keywords: residual value; building project; level of residual value; residual value of ceramics Abstrak Proyek konstruksi serinng kali menghasilkan nilai waste, nilai waste yang di hasilkan dapat berupa waste material,mutu,waktu,hingga biaya. Namun pada penelitian ini nilai waste yang akan di teliti adalah waste keramik dimana keramik seringkali memberikan efek signifikan dan dapat mempengaruhi biaya proyek, oleh karena itu pada penelitian ini bertujuan untuk mengoptimalkan nilai waste keramik pada proyek x agar dapat mengoptimalkan biaya pada proyek hingga berkurang nya nilai waste keramik yang mempunyai dampak negative pada lingkungan sekitar proyek.metode yang akan di gunakan dalam penelitian ini adalah metode pengamatan pada lapangan, wawancara,serta Analisis perhitungan melalui gambar kerja, perhitungan yang akan dilakukan dengan 2 metode yang berbeda untuk mengetahui perbandingan nilai waste sehingga didapatkan nilai yang diharapkan menjadi nilai optimum untuk penggunaan waste. Nilai optimasi ini sangat penting dilakukan dikarankan lokasi proyek yang berada diluar pulau jawa dan supply material berada dipulau jawa sehingga dapat mengurangi biaya pengiriman material yang cukup mahal dan dapat mempengaruhi anggaran proyek
ANALISIS BATA RINGAN YANG PECAH SAAT DIANGKAT OLEH TOWER CRANE Dika Warmana Yuda; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 7, Nomor 1, Februari 2024
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v7i1.26630

Abstract

Tower crane is a tool that transports materials vertically and horizontally to elevated locations in confined spaces. When selecting a tower crane for lifting purposes, several considerations need attention, one of which is the height that other tools cannot reach. This research presents a comprehensive analysis of lightweight brick failures when lifted by a tower crane, with the primary goal of understanding influencing factors. Through experimental and structural analysis approaches, we took samples of lightweight bricks representing various material characteristics and subjected them to different lifting conditions in the laboratory. The experiment results were analyzed using statistical and structural analysis to identify patterns and correlations among material characteristics, environmental conditions, lifting loads, and lightweight brick failures. The findings of this research provide a deep understanding of failure mechanisms and form the basis for practical recommendations to enhance the safety and efficiency of the lightweight brick lifting process by tower cranes. Practical implications include guidelines for improving lifting procedures, selecting more optimal materials, and enhancing overall construction safety. This research not only contributes to the scientific understanding of lightweight brick behavior in such conditions but also has practical implications that can improve standards and safety in the construction industry. Abstrak Tower Crane adalah alat yang digunakan untuk mengangkut material secara vertikal dan horizontal ke suatu tempat yang tinggi pada ruang gerak yang terbatas. Pada saat pemilihan tower crane sebagai alat pengangkatan yang akan digunakan, ada beberapa pertimbangan yang perlu diperhatikan, salah satunya adalah ketinggian yang tidak dapat dicapai oleh alat lain. Penelitian ini menghadirkan analisis menyeluruh terhadap kegagalan bata ringan saat diangkat oleh tower crane dengan tujuan utama memahami faktor-faktor yang mempengaruhinya. Melalui pendekatan eksperimental dan analisis struktural, kami mengambil sampel bata ringan yang mewakili berbagai karakteristik material dan mengenai mereka dengan kondisi pengangkatan yang berbeda di laboratorium. Hasil eksperimen dianalisis dengan menggunakan metode statistik dan analisis struktural untuk mengidentifikasi pola dan korelasi antara karakteristik material, kondisi lingkungan, beban pengangkatan, dan kegagalan bata ringan. Temuan penelitian ini memberikan pemahaman mendalam tentang mekanisme kegagalan dan memberikan dasar untuk rekomendasi praktis guna meningkatkan keselamatan dan efisiensi proses pengangkatan bata ringan oleh tower crane. Implikasi praktisnya mencakup pedoman perbaikan prosedur pengangkatan, seleksi material yang lebih optimal, dan peningkatan keselamatan konstruksi secara keseluruhan. Penelitian ini bukan hanya berkontribusi pada pemahaman ilmiah tentang perilaku bata ringan dalam kondisi tersebut tetapi juga memiliki dampak praktis yang dapat meningkatkan standar dan keselamatan dalam industri konstruksi.
KETIDAKLENGKAPAN KONTRAK DAN SENGKETA KONSTRUKSI DI INDONESIA Dian Laras Wati; Firman Sarifudin; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 7, Nomor 2, Mei 2024
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v7i2.27338

Abstract

Construction disputes occur when there is a dispute between the Employer and the Service Provider because one party or both parties feel that their rights are not recognized or fulfilled in accordance with the contractual agreement. This research aims to determine the influence of factors that influence construction disputes on the occurrence of contract disputes in the construction sector. The research was conducted using 451 respondents using a questionnaire as a data collection tool. This research was analyzed using SEM PLS to determine the effect of variable The most common alternative method for resolving disputes is negotiation between the two disputing parties, however, dispute resolution is through a litigation dispute institution, namely the court. This is still a solution that is widely used by people in Indonesia. Abstrak  Sengketa konstruksi terjadi ketika adanya perselisihan antara Pemberi Tugas dan Penyedia Jasa karena salah satu pihak atau kedua belah pihak merasa bahwa hak-hak mereka tidak diakui atau tidak dipenuhi sesuai dengan kesepakatan kontrak. Penelitian ini bertujuan untuk mengetahui pengaruh faktor-faktor yang mempengaruhi sengketa konstruksi terhadap terjadinya perselisihan kontrak di bidang konstruksi. Penelitian yang dilakukan dengan menggunakan 451 responden menggunakan kuesioner sebagai alat pengumpulan data.  Penelitian ini dianalisis menggunakan SEM PLS  untuk mengetahui pengaruh variabel X terhadap Y. Hasil penelitian berhasil menggambarkan pengaruh antara ambiguitas kontrak, kecacatan kontrak, ketidakkonsistenan kontrak, dan kekurangan kontrak terhadap perselisihan konstruksi. Penyelesaian sengketa dengan cara alternatif yang paling banyak dilakukan adalah negosiasi antara dua belah pihak yang bersengketa, akan tetapi untuk penyelesaian sengketa melalui lembaga sengketa litigasi yaitu pengadilan. Hal ini masih menjadi penyelesaian yang banyak digunakan oleh masyarakat di Indonesia.