This Author published in this journals
All Journal REKA RACANA
Hazairin Hazairin
Unknown Affiliation

Published : 3 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 3 Documents
Search

Tinjauan Manajemen Risiko Bidang Kesehatan dan Keselamatan Kerja pada Proyek Konstruksi Bekas Daerah Pembuangan Sambirejo di Masa Pandemi Covid-19 Aden Firdaus; Hazairin Hazairin; Ghea Puspita Partadisastra
RekaRacana: Jurnal Teknil Sipil Vol 7, No 2: Juli 2021
Publisher : Institut Teknologi Nasional, Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26760/rekaracana.v7i2.87

Abstract

ABSTRAKProyek konstruksi merupakan penyumbang angka kasus kecelakaan kerja terbanyak di Indonesia. Pandemi Covid-19 mempengaruhi cara kerja di bidang konstruksi. Banyak perusahaan yang telah memiliki sintem manajemen K3, namun sistem manajemen K3 tersebut belum berbasis manajemen risiko. Tujuan utama dari manajemen risiko adalah mengukur, mengidentifikasi, memetakan, mengembangkan alternatif penanganan risiko serta mendorong tingkat manajemen untuk proaktif mengurangi risiko kerugian yang diakibatkan oleh kecelakaan kerja. Data yang diambil untuk penelitian ini menggunakan instrument kuesioner. Dari hasil penelitian pada proyek Pembangunan bekas daerah pembuangan sambirejo ditemukan 92 variabel bahaya, yang terdiri dari 2 risiko tinggi, 34 risiko rendah, dan 56 risiko sedang. Resiko tertinggi adalah penyebaran virus Covid-19.Kata kunci: manajemen risiko, konstruksi, K3, Covid-19 ABSTRACTConstruction projects are the largest contributor to the number of work accident cases in Indonesia. The Covid-19 pandemic has affected the way construction works. Many companies already have an OHS management system, but the OHS management system is not yet based on risk management. The main purpose of risk management is to measure, identify, map, develop alternative risk management and encourage management levels to proactively reduce the risk of losses caused by work accidents. The data taken for this study used a questionnaire instrument. From the results of research on the development project of the former Sambirejo dumping area, 92 hazard variables were found, consisting of 2 high risk, 34 low risk, and 56 moderate risk. The highest risk is the spread of the Covid-19 virus.Keywords: risk management, construction, OHS, Covid-19
Analisis Perbandingan Biaya Penggunaan Steel Box Girder Berdasarkan Variasi Jumlah dan Dimensi (Studi Kasus: Jembatan Cimanuk Maktal) Hazairin Hazairin; Euneke Widyaningsih; Nafisah Noor Sakinah
RekaRacana: Jurnal Teknil Sipil Vol 8, No 1: Maret 2022
Publisher : Institut Teknologi Nasional, Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26760/rekaracana.v8i1.13

Abstract

ABSTRAKBiaya merupakan salah satu hal penting dalam perencanaan konstruksi. Faktor utama yang mempengaruhi biaya adalah dimensi dan jenis material konstruksi. Penentuan dimensi dan jenis material beracuan pada persyaratan yang berlaku. Namun persyaratan tersebut hanya memberikan rentang minimum dan maksimum. Maka perlu dilakukan perbandingan biaya terhadap rentang dimensi tersebut. Dalam kasus ini perhitungan struktur yang dilakukan adalah perhitungan girder jembatan. Dilakukan perhitungan biaya pada 4 variasi dimensi steel box girder. Dari hasil analisis didapatkan girder  dengan dimensi 2 x 2 meter sebanyak 2 buah girder membutuhkan biaya sebesar Rp1.835.431.964,00. Dimensi 2,3 x 2,3 meter sebanyak 2 buah girder membutuhkan biaya sebesar Rp2.115.116.834,00. Untuk dimensi 1,5 x 1,6 meter, terdapat 3 buah girder dan membutuhkan biaya sebesar Rp2.294.289.955,00. Dimensi 1 x 1,2 meter membutuhkan sebanyak 4 buah girder dengan biaya sebesar Rp2.377.321.400,00. Maka girder dengan biaya paling rendah adalah girder dengan dimensi 2 x 2 meter.Kata kunci: steel box girder, estimasi biaya, perancangan struktur ABSTRACTCost is one of the most important things in construction planning. The main factors that affect the cost are the dimensions and the types of construction materials. Determination of dimensions and types of materials refers to the standard. However, the standard only provide the minimum and maximum range of dimension. So it is necessary to compare the costs from the range of dimensions. In this case the calculation of the structure which conducted is the calculation of the bridge girder. Cost calculations were conducted on 4 variations of the steel box girder dimensions. From the analysis, it was found that 2 girders with dimension of 2 x 2 meters require a cost of Rp1,835,431,964,00. Dimension of 2.3 x 2.3 meters as many as 2 girders require a cost of Rp2.115.116.834.00. For the dimension of 1.5 x 1.6 meters, there are 3 girders and they costs Rp2,294,289,955.00. Dimension of 1 x 1.2 meters need 4 pieces of girders and require a cost of Rp2,377,321,400.00. To conclude, the girder with the lowest cost is the girder with the dimension of 2 x 2 meters.Keywords: steel box girder, cost estimation, structure design
Optimasi Bentuk Penopang Pelat Beton Apung Hazairin Hazairin; Erma Desmaliana; Imas Anggi Meylani
RekaRacana: Jurnal Teknil Sipil Vol 7, No 1: Maret 2021
Publisher : Institut Teknologi Nasional, Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26760/rekaracana.v7i1.44

Abstract

ABSTRAKBencana banjir seringkali terjadi di Indonesia, bahkan Istana negara tidak luput terendam karena tidak terbendungnya volume air yang meningkat. Kerusakan yang terjadi pada sarana dan prasarana akibat banjir tidaklah kecil dan satu cara untuk menghindari kerusakan tersebut yaitu dengan menggunakan pelat beton apung. Pemodelan pelat beton apung di atas fondasi elastis menggunakan perangkat lunak Ansys, dengan nilai tumpuan elastis sebesar 10 kN/m3 dan beban sebesar 2.500 N pada bagian ujung pelat beton apung. Penelitian ini bertujuan untuk mengetahui pengaruh bentuk penopang pelat beton apung terhadap keseimbangan apung, serta nilai deformasi maksimum akibat pembebanan. Pelat beton apung berukuran 3x4 meter dengan variasi bentuk penopang segitiga, trapesium dan lengkung baik satu arah maupun dua arah. Dari hasil analisis dan pembahasan dapat disimpulkan bahwa pelat beton apung dengan bentuk penopang segitiga 300 dua arah memiliki nilai deformasi terkecil sebesar 0,194 m; volume pelat sebesar 9,328 m3 serta deviasi draft sebesar 0,191 mKata Kunci : pelat beton apung, bentuk penopang pelat, deformasi ABSTRACTFlood disasters often occur in Indonesia, even the state palace is not spared from being submerged because the increasing volume of water cannot be stopped. The damage that occurs to facilities and infrastructure due to flooding is not small and one way to avoid this damage is to use floating concrete slabs. Modeling of floating concrete slab on an elastic foundation using Ansys software, with an elastic support value of 10 kN/m3 and a load of 2,500 N at the end of the floating concrete slab. This study aims to determine the effect of the shape of the floating concrete slab support on the buoyancy balance, as well as the maximum deformation value due to loading. Floating concrete slab measuring 3x4 meters with various forms of triangular, trapezoidal and curved supports in one direction or two directions. From the results of the analysis and discussion, it can be concluded that the floating concrete slab with a triangular shape of 300 two-way supports has the smallest deformation value of 0.194 m, the plate volume is 9.328 m3 and the draft deviation is 0.191 mKeywords : floating concrete plate, plate support geometry, deformation